Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date28 Mar 2025
Closing Date17 Apr 2025
Tender Amount₹ 1,20,000 
Notes
Download

Costs

Summary

Stage Contract For Annual Repairs And Maintenance Of Various Irrigation Schemes Of Isd Surnkote

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Ordinary Rock

1

392

392.8

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

1

218

218.4

... More
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : (All kinds of soil)

1

89

89.75

... More
Ordinary Rock

1

161

161

... More
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.

1

189

189.2

... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.

1

167

167.8

... More
Providing and laying in position cement concrete of specified grade including curing, but excluding the cost of centering and shuttering. All work up to plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

5733

5733.6

... More
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

6591

6591.25

... More
1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

1

5202

5202.9

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centring, shuttering, finishing and reinforcement. All works upto plinth level: 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

7788

7788.4

... More
1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

7104

7104.35

... More
Centring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.

1

286

286.35

... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

1

628

628.95

... More
Suspended floors, roofs, landings, balconies and access platforms. / Shelves (cast-in-situ)

1

718

718.2

... More
Lintel, beams, plinth beams, girders, and cantilevers

1

577

577.55

... More
Columns, pillars, piers, abutments, posts and struts.

1

742

742.55

... More
Edges of slabs and breaks in floors and walls (Under 20 cm wide)

1

262

262.2

... More
Edges of slabs and breaks in floors and walls (Above 20 cm wide)

1

1145

1145.1

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.-Thermo-Mechanically Treated bars of grade Fe-500D or more.

1

123

123.2

... More
Mild steel and medium tensile steel bars

1

115

115.35

... More
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:4 ( 1 cement : 4 coarse sand)

1

7877

7877.4

... More
Cement mortar 1:6 ( 1 cement : 6 coarse sand)

1

7571

7571.55

... More
Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level

1

1455

1455.65

... More
RANDOM RUBBLE MASONRY:-Random Rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: a. Cement mortar 1:6 (1 Cement : 6 coarse sand) Quarry

1

7677

7677.35

... More
Nallah

1

5402

5402.9

... More
Dry random rubble masonry with hard stone in foundation and plinth: a) With bond stone. Wih bond stone : quarry

1

5536

5536.55

... More
Nallah

1

3262

3262.1

... More
without bond stone Nallah

1

2793

2793.8

... More
Providing and fixing of sign board displaying salient features as per standard design/ size(1mx0.80m) with angle iron posts embedded in cement concrete block to be approved by Engineer in Charge including painting , lettering and cost of concrete block (complete job)

1

1500

1500

... More
Capturing and printing HD photographs (of size 4”x6”) on good quality standard photo paper

1

50

50

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Riveted and bolted

1

142

142.9

... More
Welded

1

138

138.2

... More
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. Complete. 25mm thick with 12.5 mm nominal size stone aggregate

1

409

409.25

... More
40mm thick with 20 mm nominal size stone aggregate.

1

510

510.25

... More
50 mm thick with 20mm nominal size stone aggregate.

1

562

562.15

... More
0.50 mm thick with zinc coating not less than 275 gram/m2

1

852

852.5

... More
0.50 mm thick with zinc coating not less than 275 gram/m2

1

690

690.85

... More
CEMENT PLASTER; (IN FINE SAND) 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)

1

283

283.8

... More
1 : 6 ( 1 cement : 6 fine sand)

1

266

266.2

... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in charge: 1:3:6 or richer mix (i/c equivalent design mix)

1

1725

1725.2

... More
1:4:8 or leaner mix (i/c equivalent design mix)

1

1064

1064.55

... More
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.

1

2516

2516.85

... More
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar

1

1740

1740.45

... More
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar

1

1458

1458.45

... More
Dismantling old protection work including cutting of crates and stacking of stones

1

398

398.35

... More
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.

1

1622

1622.25

... More
Dry stone pitching (any thickness) excluding cost of stones. On Horizontal

1

535

535.55

... More
On Top copings of banks

1

673

673.8

... More
On Slopes

1

693

693.95

... More
Hand-packing stones in wire-crates; excluding cost of crates and stones

1

371

371.15

... More
Dumping stone excluding cost of stones. in Horizontal on level

1

237

237.9

... More
on Slopes (Behind pitching)

1

261

261.45

... More
Grouting of stone pitching using M-10 nominal mix concrete (max. Size of aggregates; 20mm nominal) @ 3.65 cum per 100Sqm on horizontal/side slopes; complete including curing.

1

199

199.3

... More
Opening out old wire crates those and re-binding after filling.

1

35

35.6

... More
Supply of Stone boulder (nallah) nominal size 225 mm incl. royalty and/or other taxes, (Stack measurements reduced by 15%)

1

700

700

... More
Supply of Stone boulder (quarry) nominal size 225 mm incl. royalty and/or other taxes, (Stack measurements reduced by 15%)

1

1175

1175

... More
Supply of Stone for masonry work (quarry) incl. royalty and/or other taxes, (Stack measurements reduced by 15%)

1

2400

2400

... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / s]and

1

7

7.8

... More
Unloading sand/earth filled bags from boats placing in dry

1

9

9.25

... More
Placing in Water

1

18

18.5

... More
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) : Dry

1

111

111

1

184

184.95

... More
Shingle clearance from canals

1

148

148

... More
Weed clearance From lakes(using boats)

1

21

21.15

... More
From canals(including extraction of roots)

1

13

13.45

... More
SLIP CLEARANCE In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.

1

154

154.15

... More
In soils; mixed with moorum / Kankar / shingle / boulders ; disposal lead upto 50 m and lift upto 1.5 m.

1

331

331.15

... More
In soils; mixed with Decomposed Rocks; by blasting or any other means

1

411

411.4

... More
Supply of crusher dust for filling of bags incl. Carriage, royalty and/or other taxes, loading, unloading, stacking, etc. Complete job,

1

1000

1000

... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / s]and

1

7

7.8

... More
Providing of LDPE (Black polythene) to stop/ stop the leakages of canals / khuls/ minors

1

200

200

... More
Surface dressing of the ground including removing vegetation and in-equalities, not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil.

1

2412

2412

... More
Providing & laying PVC (type – B) pipes with all the required accessories and carriages, complete job --- 150mm dia(LMR)

1

800

800

... More
200mm dia (LMR)

1

1000

1000

... More
250mm dia(LMR)

1

1200

1200

... More
Sand & Agg. 20 mm avg. lead of upto 01 Kms

1

128

128.75

... More
Sand & Agg. 20 mm avg. lead upto 02 Kms

1

147

147.44

... More
Sand & Agg. 20 mm avg. lead upto 03 Kms

1

165

165.84

... More
Sand & Agg. 20 mm avg. lead upto 04 Kms

1

183

183.58

... More
Sand & Agg. 20 mm avg. lead upto 05 Kms

1

200

200.74

... More
Sand & Agg. 20 mm avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

15

15.66

... More
Sand & Agg. 20 mm avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

13

13.09

... More
Sand & Agg. 20 mm avg. lead beyond 20 Kms per additional Km

1

11

11.04

... More
40 mm Agg. avg. lead of upto 01 Km

1

139

139.94

... More
40 mm Agg. avg. lead upto 2 Kms

1

160

160.26

... More
40 mm Agg. avg. lead upto 3 Kms

1

180

180.26

... More
40 mm Agg. avg. lead upto 4 Kms

1

199

199.55

... More
40 mm Agg. avg. lead upto 5 Kms

1

218

218.19

... More
40 mm Agg. avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

17

17.03

... More
40 mm Agg. avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

14

14.23

... More
40 mm Agg. avg. lead beyond 20 Kms per additional Km

1

12

12

... More
Stone soling avg. lead of upto 1 Km

1

151

151.47

... More
Stone soling avg. lead upto 2 Kms

1

173

173.46

... More
Stone soling avg. lead upto 3 Kms

1

195

195.1

... More
Stone soling avg. lead upto 4 Kms

1

215

215.98

... More
Stone soling avg. lead upto 5 Kms

1

236

236.16

... More
Stone soling avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

18

18.43

... More
Stone soling avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

15

15.4

... More
Stone soling avg. lead beyond 20 Kms per additional Km

1

12

12.98

... More
Earth avg. lead of upto 1 Km

1

160

160.93

... More
Earth avg. lead of upto 02 Km

1

184

184.3

... More
Earth avg. lead of upto 03 Km

1

207

207.3

... More
Earth avg. lead of upto 04 Km

1

229

229.48

... More
Earth avg. lead of upto 05 Km

1

250

250.92

... More
Earth avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

19

19.58

... More
Earth avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

16

16.36

... More
Earth avg. lead beyond 20 Kms per additional Km

1

13

13.8

... More
Bricks avg. lead of upto 1 Km

1

343

343.32

... More
Bricks avg. lead of upto 02 Km

1

393

393.17

... More
Bricks avg. lead of upto 03 Km

1

442

442.23

... More
Bricks avg. lead of upto 04 Km

1

489

489.56

... More
Bricks avg. lead of upto 05 Km

1

535

535.3

... More
Bricks avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

41

41.77

... More
Bricks avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

34

34.9

... More
Bricks avg. lead beyond 20 Kms per additional Km

1

29

29.43

... More
Carriage of material by manual from road site to actual site of work, including loading, unloading and stacking etc. complete by manual labour Cement for an avg. lead upto 50 mtr.

1

116

116.22

... More
Cement for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

17

17.05

... More
Steel for an average lead upto 50 Mtr

1

249

249.61

... More
Steel for an every additional lead of 50Mtrs or part thereof beyond 1st 50 Mtrs

1

36

36.63

... More
Soling for an avg. lead upto 50 mtr.

1

236

236.08

... More
Soling for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

51

51.4

... More
Sand & 20mm Agg for an average lead upto 50Mtr

1

200

200.67

... More
Sand & 20mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
40mm Agg for an average lead upto 50Mtr

1

216

216.94

... More
40mm Agg for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

47

47.23

... More
Earth for an average lead upto 50Mtr

1

200

200.67

... More
Earth for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
Bricks for an average lead upto 50Mtr

1

374

374.58

... More
Bricks for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

81

81.56

... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like

1

167

167.8



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.