Irrigation And Flood Control Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Eprocure
Opening Date25 Sep 2019
Closing Date8 Oct 2019
Tender Amount₹ 18,48,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dumping stones in horizontal on level including cost of stones

37.91

12398

327.05

... More
Dry Random Rubble masonry with hard stone in foundation and plinth using nallah stone without bond stone .Full rate

178.37

232674

1304.45

... More
Dry Random Rubble masonry with hard stone in foundation and plinth using nallah stone without bond stone .Labour Rate

31.45

31527

1002.46

... More
Reinforced cement concrete work in beams suspended floors, roofs, having slopes up to 15 * landings , balconies , shelves , Chajjas, lintels, bands plain window sills, stair cases & spiral stair cases up to floor five level excluding the cost of centering , shuttering, finishing & reinforcement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone agg. 20 mm nominal size).

2.4

13863

5776.45

... More
Reinforcement for RCC works incl. straightening, cutting, bending, placing in position & binding all complete cold twisted bars.

168

11928

71

... More
Cement concrete flooring 1:2:4 ( 1cement : 2 coarse sand : 4 graded stone agg.) finished with a floating coat of neat cement incl. cement slurry but excl. C/o nosing of steps etc. complete (40mm with 20mm nominal size stone aggregate (Nallah).

48

15081

314.2

... More
12 mm cement plaster in 1:4 (1 cement : 4 coarse sand)

96

15230

158.65

... More
Centering & shuttering incl. strutting , propping etc. and removal of form work for :- Foundation, footings, bares of column etc. for mass concrete.

304.5

54581

179.25

... More
Suspended floors, roofs, landings, balconies, & access platform.

8

2979

372.4

... More
Edges of slabs and breaks in floor and walls under 20 cm wide.

42.4

7485

176.55

... More
Carriage of Stone from source to site of work av. 1.00 KM by manual means

216.28

123532

571.17

... More
Carriage of sand from source to site of work av. 140.00 KM by M.T. & 10.00 KM by manual means

51.39

263805

5133.41

... More
Carriage of Stone aggregate 20 mm nominal size from source to site of work a 08.00 KM by manual means

82.43

277519

3366.73

... More
Carriage of Stone aggregate 40 mm nominal size from source to site of work av. 1.00 KM by manual means

12.81

6724

524.92

... More
Carriage of Cement from Divisional store Ramban to site of work av. 60.00 KM by M.T. & 10.00 KM by manual means

24

49840

2076.7

... More
Carriage of Steel from Divisional store Ramban to site of work av. 60.00 KM by M.T. & 10.00 KM by manual means

0.17

667

3971.31



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.