Irrigation And Flood Control Department Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Irrigation And Flood Control Department - IFC Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date2 Apr 2025
Closing Date11 Apr 2025
Tender Amount₹ 3,50,000
Costs
EMD
₹ 7,000Document Cost
₹ 200Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_IFC_275059_1Bid Award Id
ViewTender No
e-NIT No 02 of 2025-26Tender Authority
Irrigation And Flood Control Department ViewPurchaser Address
-Website
http://http://ifcjmu.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:
1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
1
5673
5673.4
... More
Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns
1
286
286.35
... More
Slip Clearance
In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.
1
154
154.15
... More
In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.
1
331
331.15
... More
Providing, Laying & Fixing of HDPE Pipes including Carriage (Complete Job) (LMR)
1
930
930
... More
Supply of Stones (Nallah Boulder)
1
927
927.28
... More
Dumping stone excluding cost of stones. in Horizontal on level
1
237
237.9
... More
Hand-packing stones in wire-crates; excluding cost of crates and stones
1
371
371.15
... More
Supply of BA wire Crates of mesh Size 100mmx100mm with 4mm wire dia (tolerance 0.05mm) as per Specification under I.S 280:2006 (LMR)
1
220
220
... More
Binding Wire 4mm dia (tolerance 0.05mm) as per Specification under I.S 280:2006 (LMR)
1
100
100
... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.
1
7
7.8
... More
Loading/Unloading sand/ earth filled bags in lorries; lead upto 50m.
1
4
4.95
... More
Supply of Empty Cement Poly Bags
1
2
2.74
... More
Laying in position sand/earth filled bags as per directions of Engineer in-charge
In Dry
1
9
9.42
... More
In Wet
1
18
18.85
... More
Supplying and stacking of Good Earth at site including royalty (Earth measured in stacks will be reduced by 20% for payment )
1
281
281.3
... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Welded
1
138
138.2
... More
Engagement of Excavator cum Loader
1
1072
1072
... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
1
1249
1249.1
... More
Providing, Laying of polythene of secified weight of approved brand & colour including all carriage complete job (LMR)
1
205
205
... More
Supply of Laboour at site of work (08 hour work shift)
1
741
741.02
... More
Supply of Blacksmith Ist class at site of work (08 hour work shift)
1
1067
1067.7
... More
Supply of Blacksmith 2nd class at site of work (08 hour work shift)
1
972
972.32
... More
Supply of Carpenter at site of work (08 hour work shift)
1
1020
1020
... More
Supply of Masson at site of work (08 hour work shift)
1
972
972.32
... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth.
1
379
379.05
... More
Beyond 60 cm girth upto and including 120 cm girth.
1
1683
1683
... More
Beyond 120 cm girth upto and including 240 cm girth.
1
7795
7795.7
... More
Above 240 cm girth
1
15627
15627.5
... More
Supply of Lubricant grease (LMR)
1
430
430
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements