Irrigation And Flood Control Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Irrigation And Flood Control Department Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date14 Mar 2023
Closing Date27 Mar 2023
Tender Amount₹ 5,00,000
Costs
EMD
₹ 10,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_IFC_207959_4Bid Award Id
ViewTender No
enit 43 of 03 2023Tender Authority
Irrigation And Flood Control Department ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods,watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil:
1
467
467.3
... More
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material: All kinds of soil
1
91
91.2
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides ofoundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
1
221
221.35
... More
Felling of trees of girth (measured at height of 1 mtr above ground) including cutting of trunk and branches, removing of roots and stacking of seviceable material and disposal of unserviceable material beyond
Beyond 30cm girth upto and including 60 cm girth
1
379
379.05
... More
Beyond 60cm girth upto and including 120cm girtth
1
1683
1683
... More
Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment)
1
274
274.85
... More
Filling E/c bags with availalble earth including cost of strings and sewing
1
7
7.8
... More
Placing of earth filled bags in position(Dry)
1
9
9.25
... More
Placing of earth filled bags in position(Wet)
1
18
18.5
... More
Laying of poythene sheets to prevent leakages (labour only)
1
40
40
... More
Providing and fixing of corrugated HDPE pipes including all sorts of carriages upto site of work. 12" dia
1
350
350
... More
8" dia
1
230
230
... More
6" dia
1
200
200
... More
4"dia
1
150
150
... More
Silt clearance from canals in(Wet)
1
184
184.95
... More
Silt clearance from canals in(Dry)
1
111
111
... More
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive carriages.
1
189
189.2
... More
Slip Clearance n ordinary soils disposal lead upto 50m and lift upto 1.5m
1
154
154.15
... More
Removing of slips in soils;mixed with moorum/Kankar/Shingle/Boulders;disposal lead upto 50m and lift upto 1.5m
1
331
331.15
... More
Weed clearance from canals( including extraction of roots)
1
13
13.45
... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge
1:3:6 or richer mix (i/c equivalent design mix)
1
1681
1681.1
... More
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
1
2452
2452.55
... More
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar
1
1421
1421.3
... More
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar
1
1696
1696.15
... More
Dismantling wooden ballies in posts and struts including stacking within 50 meters lead.
1
14
14.45
... More
Dismantling and stacking within 50 meters lead, fencing posts or struts including all earth work and dismantling of concrete etc. in base of R.C.C./cement conrete
1
190
190.7
... More
Reparing of eixting steel/work gates by way of oiling/greasing applying of priming coats including painting of required shade as per direction of Engineer In charge:
1
400
400
... More
Providing & fixing of plain GI tin sheets over flumes for arresting leakages including all accessories material and all sorts of carraiges.
1
110
110
... More
Deployement of Hydraulic excavator (3D) with driver and fuel
1
700
700
... More
Hire charge of Hydraulic excavator (3D) with driver and fuel
1
875
875
... More
Construction of muthu bunds,comprising boulders and wood bushes in alternate layers;including working in water situations
1
1622
1622.25
... More
Carriage of Materials from source upto road site by Mechnical transport including cost of loading unloading and stacking Earth for Ist km
1
158
158.49
... More
for every additional km (actual as per site)
1
13
13.71
... More
E/C bags from Divisional store for Ist Km
1
-
0.05
... More
for every additional km (actual as per site)
1
-
-
... More
Polythene for 1km
1
-
0.03
... More
for every additional km (actual as per site)
1
-
0.02
... More
Carraige of Un-hygenic Material/ Sludge (Wet) 1st km
1
158
158.49
... More
for every additional km (actual as per site)
1
13
13.71
... More
Extra carriage of Materials from road site to site of work by Mannual labour Including loading unloading and stacking ( Earth additional 50mtrs
1
42
42.59
... More
E.C bags 1st 50mtrs
1
-
0.03
... More
for every additional 50mtrs (actual as per site)
1
-
0.01
... More
For subsequent mtrs
1
35
35.7
... More
poythene 1st 50m
1
-
0.02
... More
for every additional 50m (actual as per site)
1
-
0.03
... More
Supply of Labours
1
553
553
... More
Cost of E/C bags (Deptl. Supply)
1
6
6.1
... More
Polythene
1
291
291
... More
Cost of Geo Tagged Photographs ( both Soft and Hard Copy) size 4"x6"
1
80
80
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements