Irrigation And Flood Control Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date11 May 2024
Closing DateCancelled
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone. Full Rate

1

2793

2793.8

... More
Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone. (Labour Rate )

1

1876

1876

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

1

5202

5202.9

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

5733

5733.6

... More
Dumping stone excluding cost of stones. in Horizontal on level

1

237

237.9

... More
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand)

1

283

283.8

... More
Supply of stones

1

700

700

... More
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns

1

286

286.35

... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

1

628

628.95

... More
Suspended floors, roofs, landings, balconies and access platforms.

1

718

718.2

... More
Edges of slabs and breaks in floors and walls Under 20 cm wide

1

262

262.2

... More
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.

1

181

181.6

... More
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) ( Nallah)

1

5402

5402.9

... More
Filling available excavated earth (excl. rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming & watering, lead up to 50 m & lift up to 1.5 m excluding ramming and watering.

1

180

180.55

... More
Hand-packing stones in wire-crates; excluding cost of crates and stones

1

371

371.15

... More
Supply of Sand

1

770

770

... More
Filling empty cement bags with sand/ earth; including loading / unloading , placing in dry place and supply of E/C bags complete Job

1

20

20.05

... More
Supply and providing of knitted crates ( B.A wire 4mm of size 6x1.5x1.5mesh 6"x6"weight 65 kg including lids and sides 01 No. crate)

1

77

77

... More
Supply and providing of knitted crates ( B.A wire 4mm of size 6x1.20x1.20mesh 6"x6"weight 55 kg including lids and sides 01 No. crate)

1

77

77

... More
Filling empty cement bags with sand/ earth; including loading / unloading , placing in Wet place and supply of E/C bags complete Job

1

29

29.3

... More
Dismantling of Old Protection work incliding Cutting of Crates and Stacking of Stones

1

398

398.35

... More
Carraige of material from source to site of work including loading , unloading , stacking complete by Av. 05 Km by MT . ( to be paid as per actual distance involved at site) a) Sand

1

200

200.74

... More
b) Stone Agg. below 20mm

1

200

200.74

... More
c) Cement

1

178

178.43

... More
d) Earth / Sand

1

250

250.92

... More
e) Knitted Crate

1

535

535.3

... More
f) Empty EC Bags

1

-

0.08

... More
h) Stone

1

236

236.16

... More
Carraige of materail by M.T for subsequent additional 1.00 Km Lead. ( to be paid as per actual distance involved at site) Beyond 10.00 Km a) Sand

1

15

15.66

... More
b) Stone Agg. below 20mm

1

15

15.66

... More
c) Cement

1

13

13.92

... More
d) Earth / Sand

1

19

19.58

... More
e) Knitted Crate

1

41

41.77

... More
f) Empty EC Bags

1

-

0.01

... More
h) Stone

1

18

18.43

... More
Carraige of materail by M.T for subsequent additional 1.00 Km Lead. ( to be paid as per actual distance involved at site) Beyond 20.00 Km a) Sand

1

13

13.09

... More
b) Stone Agg. below 20mm

1

13

13.09

... More
c) Cement

1

11

11.63

... More
d) Earth / Sand

1

16

16.36

... More
e) Knitted Crate

1

34

34.9

... More
f) Empty EC Bags

1

-

0.01

... More
h) Stone

1

15

15.4

... More
Carraige of materail by M.T for subsequent additional 1.00 Km Lead. ( to be paid as per actual distance involved at site) Additional lead above 20.00 KM a) Sand

1

11

11.04

... More
b) Stone Agg. below 20mm

1

11

11.04

... More
c) Cement

1

9

9.81

... More
d) Earth / Sand

1

13

13.8

... More
e) Knitted Crate

1

29

29.43

... More
f) Empty EC Bags

1

-

-

... More
h) Stone

1

12

12.98

... More
Carraige of materail from source to site of work Av. 50m by H/L . ( to be paid as per actual distance involved at site) a) Sand

1

200

200.67

... More
b) Stone Agg. below 20mm

1

200

200.67

... More
c) Stone Agg. above 40mm

1

216

216.94

... More
d) stone

1

236

236.08

... More
e) Cement

1

116

116.22

... More
d) Earth / Sand

1

200

200.67

... More
e) Knitted Crate

1

146

146.51

... More
f) Empty EC Bags

1

-

0.04

... More
Carraige of materail by H/L for subsequent additional 50m Lead. ( to be paid as per actual distance involved at site) a) Sand

1

43

43.69

... More
b) Stone Agg. below 20mm

1

43

43.69

... More
c) Stone Agg. above 40mm

1

47

47.23

... More
d) stone

1

51

51.4

... More
e) Cement

1

17

17.05

... More
d) Earth / Sand

1

43

43.69

... More
e) Knitted Crate

1

21

21.5

... More
f) Empty EC Bags

1

-

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.