Irrigation And Flood Control Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date16 Mar 2024
Closing Date6 Apr 2024
Tender Amount₹ 5,00,000 
Notes
Download

Costs

Summary

Stage Contract Phase 1st For Restoration And Maintenance Of Zainger Canal Khareef In Respect Of Isd Sopore(tail Section) Mh-2701 M R For The Year 2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil.

1

741

741.05

... More
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil.

1

467

467.3

... More
Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated Earth in layers not exceeding 20 cm in depth.

1

4

4.4

... More
Deduct for not watering the excavated earth for banking.

1

33

33.45

... More
Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil.

1

89

89.75

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

1

218

218.4

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)

1

5202

5202.9

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

1

5733

5733.6

... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).

1

6591

6591.25

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level; 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

7788

7788.4

... More
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

1

7104

7104.35

... More
Hand-packing stones in wire-crates; excluding cost of crates and stones

1

371

371.15

... More
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)

1

9395

9395.7

... More
Supply and staking of B.A wire knitted Crates (Mesh size 4 ''x4'' ), with dia wire 4mm of approved made and make including all sorts of carriages up to the actual site of work complete in all respects to the entire satisfiction of Engineer incharge.

1

22

22

... More
Dumping stone excluding cost of stones. In Horizontal on level

1

237

237.9

... More
Dumping stone excluding cost of stones. on Slopes (Behind pitching)

1

261

261.45

... More
Supply of Stone boulder (nallah) nominal size 225 mm (Stack measurements reduced by 15%)

1

910

910

... More
Supply of Stone for masonry work (quarry)

1

3120

3120

... More
Supply of Stone boulder (quarry) nominal size 225 mm (Stack measurements reduced by 15%)

1

1528

1528

... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings excluding cost of bag earth/ sand

1

7

7.8

... More
Providing and laying in position of sand/ earth; filled geo bags with filled capacity 0.075 cum per No, including cost of bag, filling of bag, swing and strings, placing in position dry/ wet, all sorts of carriages manual / mechanical, loading, unloading and stacking etc but excludng cost of filling material, (complete job) as per directions/ satisfaction of Engineer in charge

1

241

241.9

... More
Providing and laying in position of geo bags with filled capacity 0.075 cum per No, filled with Earth /Sand including cost of bag, filling of bag, swing and strings, filling material, placing in position dry/ wet, all sorts of carriages manual / mechanical, loading, unloading and stacking etc (complete job) as per directions/ satisfaction of Engineer in charge

1

325

325.86

... More
Providing and laying in position of sand/ earth; filled mega bags with filled capacity 0.95 cum per No, including cost of bag, filling of bag, swing and strings, placing in position dry/ wet, all sorts of carriages manual / mechanical, loading, unloading and stacking etc but excluding cost of filling material, (complete job) as per directions/ satisfaction of Engineer in charge

1

1254

1254.02

... More
Providing and laying in position of mega bags with filled capacity 0.95 cum per No, filled with Earth / Sand including cost of bag, filling of bag, swing and strings, filling material, placing in position dry/ wet, all sorts of carriages manual / mechanical, loading, unloading and stacking etc (complete job) as per directions/ satisfaction of Engineer in charge

1

2317

2317.52

... More
Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment)

1

281

281.3

... More
Capturing and printing HD photographs of size (4"x 6") on good quality standard photopaper

1

50

50

... More
Supply of sand for filling of bags or other works including carriage, royality and or other taxes, loading, unloading, stacking etc complete job

1

1900

1900

... More
Supply of EC bags as and where required incluing all sorts of carriages (manual/ mechanical) loading , unloading, etc complete job

1

5

5.5

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level

-

-

-

... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.

1

123

123.2

... More
Centering and shuttering including strutting, propping etc. and removal of form for:

-

-

-

... More
Foundations, footings, bases of columns etc. for mass concrete.

1

286

286.35

... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

1

628

628.95

... More
Suspended floors, roofs, landings, balconies and access platforms.

1

718

718.2

... More
Edges of slabs and breaks in floors and walls Under 20 cm wide

1

262

262.2

... More
Slip clearance; In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m.

1

331

331.15

... More
Slip Clearence In ordinary soils disposal lead upto 50 m and lift upto 1.5 m.

1

154

154.15

... More
Dismantling of old protection work including cutting crates and stacking of stones

1

398

398.35

... More
Hire charges for engagement of Chain saw ( Mechanical woood cutter) incl operator fuel, maintainence all sorts of carriages complete job

1

1755

1755

... More
Opening out old wire crates those and re-binding after filling.

1

35

35.6

... More
Loading/Unloading sand/ earth filled EC bags in lorries; lead upto 50m.

1

4

4.95

... More
Placing in dry

1

9

9.25

... More
Placing in Water

1

18

18.5

... More
Loading/Unloading sand/ earth filled Geo bags in lorries;lead upto 50m.

1

14

14

... More
Placing in dry

1

25

25

... More
Placing in Water

1

50

50

... More
Placing of sand/ earth filled bags In Dry

1

7

7.82

... More
Placing of sand/ earth filled bags In water

1

9

9.77

... More
Supply of crusher dust for filling of bags including carriage, royality and or other taxes, loading unloading stacking etc complete job

1

1000

1000

... More
Shingle clearance from canals.

1

148

148

... More
12mm cement plaster of mix 1:4 (1cement : 4 fine Sand)

1

283

283.8

... More
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:

-

-

-

... More
1:3:6 or richer mix (i/c equivalent design mix)

1

1725

1725.2

... More
1:4:8 or leaner mix (i/c equivalent design mix)

1

1064

1064.55

... More
Grouting of stone pitching using M-10 nominal mix concrete (max. size of aggregates; 20mm nominal) @ 3.65 cum per 100 sq m on horizontal/side slopes; complete including curing.

1

199

199.3

... More
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.

1

2516

2516.85

... More
Demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar

1

1740

1740.45

... More
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded.

1

138

138.2

... More
Constructing muthu bunds, comprising boulders and wood bushes in alternate layers; including working in water situations.

1

1622

1622.25

... More
Dry stone pitching (any thickness) excluding cost of stones.

-

-

-

... More
On Horizontal

1

535

535.55

... More
On Top copings of banks

1

673

673.8

... More
On Slopes

1

693

693.95

... More
Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand)

-

-

-

... More
Quarry

1

7677

7677.35

... More
Nallah

1

5402

5402.9

... More
Dry random rubble masonry with hard stone in foundation and plinth: with bond stone

-

-

-

... More
Quarry

1

5536

5536.55

... More
Nallah

1

3262

3262.1

... More
Open timbering over areas including strutting, shoring etc. complete (Measurements to be taken of the face area timbered):

-

-

-

... More
Depth not exceeding 1.5 m.

1

68

68.5

... More
Depth exceeding 1.5 m but not exceeding 3 m

1

76

76.45

... More
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.

1

1249

1249.1

... More
Petrol for running of Departmental chain saw ( wood cutter) of required add mixtures

1

102

102

... More
Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.

1

189

189.2

... More
Engagement of Boatman

1

813

813

... More
Boat (capacity upto 20 cum)

1

1365

1365

... More
Engagement of labour / Beldar, Mazdoor

1

719

719

... More
Fitter

1

1048

1048

... More
Blacksmith IInd Class

1

954

954

... More
Mason average

1

1001

1001

... More
Carpenter

1

1048

1048

... More
Painter

1

954

954

... More
Hire charges for engagement of mechanical excavator (J.C.B) including operator, fuel, maintainence and transportation of excavator to and fro from site to source complete job (tyre type)

1

1500

1500

... More
Hire charges for engagement of mechanical excavator (J.C.B) including operator, fuel, maintainence and transportation of excavator to and fro from site to source complete job (poclain type) normal boom.

1

2200

2200

... More
Hire charges for engagement of mechanical excavator (J.C.B) including operator, fuel, maintainence and transportation of excavator to and fro from site to source complete job (poclain type) long boom.

1

3000

3000

... More
Hire and running charges for light crane. Including fuel ,driver and Crawling charges etc complete job

1

400

400

... More
Hire charges of Chain Mounted Earth moving equipment LNT etc including fuel ,driver and Crawling charges etc complete job

1

2200

2200

... More
Hire charges of Tractor with a load capacity of 70 Cfts including fuel, driver and Running Charges etc complete job

1

200

200

... More
Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.

-

-

-

... More
Beyond 30cm girth upto and including 60cm girth.

1

379

379.05

... More
Beyond 60cm girth upto and including 120cm girth

1

1683

1683

... More
Beyond 120 cm girth upto and including 240 cm girth.

1

7795

7795.7

... More
Providing, Laying, spreading and fixing of LDP to check / stop the leakages of canals including the fixing / locking arangements by any means throught the entire length / breadth as per the requirment at site of work and as desired by Engineer incharge complete in all respects

1

36

36

... More
Providing, installation, commissioning and testing of single winch machine, complete set of standard quality of 03 ton capacity with double threaded 50 mm dia winch rod, gears, peddestal rain cover, greese lids, MS sleeves, operating handle with locking arrangement incl. greesing, oiling , all sorts of carriages and extra carriages upto site of work complete job

1

50000

50000

... More
Providing, installation, commissioning and testing of double winch machine, complete set of standard quality of 05 ton capacity with coupling rod, coupling set double threaded 50 mm dia winch rod, gears, peddestal rain cover, greese lids, MS sleeves, operating handle with locking arrangement incl. greesing, oiling , all sorts of carriages and extra carriages upto site of work complete job

1

60000

60000

... More
Providing, driving and installing poplar wood piles of 6" to 8" girth, and length 10 feet incl. all sorts of carriages, taxes, loading unloading etc complete job as per the directions/satisfaction of engineer in charge.

1

260

260

... More
Structural steel work in single section fixed without connecting plate including cutting , hoisting fixing in positionand applying a priming coatof approved steel primer all complete

1

128

128

... More
Structural steel work welded in built up section,trusses and framed work including cutting hosisting , fixing in position and applying a priming coat of approved steel primer all complete

1

147

147

... More
cutting charges of Mild steel pipes/ plates including cost of consumables etc but excluding the cost of transpotation charges of eqipment site

-

-

-

... More
Using Grinder

1

5

5.2

... More
By Gas cutting

1

11

11.6

... More
welding charges of prepered milde steel sections etc incliuding cost of consumbles etc but exculding carriage of equipment to site etc

-

-

-

... More
By electrict welding

1

5

5.58

... More
By Gas Welding

1

12

12.55

... More
Providing and fixing precoated galvanised steel sheet roofing accessories0.50 mm (+0.05 %) total coated thickness, Zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns using self drilling/ self tapping screws complete Barge board (Upto 300 mm

1

376

376.55

... More
Weed clearance

-

-

-

... More
From lakes(using boats)

1

21

21.15

... More
From canals(including extraction of roots)

1

13

13.45

... More
Hire charges of vehicle during day or night alongwith licensed commercail driver for site inspection/emegency suituation/ movement of officials/ including driver and POL on need basis etc

-

-

-

... More
only upto 30 KM journey

1

60

60

... More
for every KM after 30 Km

1

50

50

... More
Checking of leakages b.w.o repairing/ replacing of rubber seal of standard quality in gates, complete job

1

500

500

... More
Providing and fixing of greese lids for winch machines

1

200

200

... More
Providing and fixing of pipe sleeves (rain water pipes) incl priming coat and two coats of mettalic

1

1300

1300

... More
Repairs to side channels b.w.o removal of bends and kinks incl setting and fixing, complete job

1

750

750

... More
Overhauling of winch machines including all sorts of carriages, cleaning, greesing/oiling, replacement/worm out nuts/bolts etc and refixing/realignment of lever system after application of lubricants, as per Engineer in charge (complete job

1

7500

7500

... More
Repair of winch rods including removal of bends kinks etc refixing and reallignment in required position including replacement of Check nuts rusted nuts and bolts etc as per site requirements. Complete job

1

7000

7000

... More
Repairs to shuter by way of removing dents, kinks and setting of iron gate

1

750

750

... More
Disassembling and reasembling of chainsaw wood cutter and making necessary repairs including all accessories for repair work with all sorts of carriages complete job

1

1200

1200

... More
Hire and running charges of tipper including cost of lubricating oil, diesel at 8 working hours per day including driver

1

5259

5259

... More
Hire charges of Pumpset of capacity 4000 litres/hour

1

700

700

... More
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.

1

167

167.8

... More
Providing and Laying PVC Pipes with all the required accessories and carriages Of approved brand and quality complete Job.

-

-

-

... More
100 mm

1

200

200

... More
150 mm

1

300

300

... More
Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints complete .

-

-

-

... More
600mm dia R.C.C pipe (24")

1

1751

1751.8

... More
450mm dia R.C.C pipe (18")

1

1148

1148.6

... More
300mm dia R.C.C pipe (12")

1

837

837.55

... More
250mm dia R.C.C pipe (9")

1

746

746.2

... More
Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking (Earth)

-

-

-

... More
upto 1 km

1

160

160.93

... More
2 km

1

184

184.3

... More
3 Km

1

207

207.3

... More
4 km

1

229

229.48

... More
5 km

1

250

250.92

... More
Beyond 5 Km upto 10 km /km

1

19

19.58

... More
Beyond 10 Km upto 20 km /km

1

16

16.36

... More
Beyond 20 km /every additional Km

1

13

13.8

... More
Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking (Stone solling)

-

-

-

... More
upto 1 km

1

151

151.47

... More
2 km

1

173

173.46

... More
3 Km

1

195

195.1

... More
4 km

1

215

215.98

... More
5 km

1

236

236.16

... More
Beyond 5 Km upto 10 km /km

1

18

18.43

... More
Beyond 10 Km upto 20 km /km

1

15

15.4

... More
Beyond 20 km /every additional Km

1

12

12.98

... More
Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking (40 mm Agregrate)

-

-

-

... More
1 Km

1

139

139.34

... More
2 km

1

160

160.26

... More
3 Km

1

180

180.26

... More
4 km

1

199

199.55

... More
5 km

1

218

218.19

... More
Beyond 5 Km upto 10 km /km

1

17

17.03

... More
Beyond 10 Km upto 20 km /km

1

14

14.23

... More
Beyond 20 km /every additional Km

1

12

12

... More
Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( 20 mm Aggregate)

-

-

-

... More
1 Km

1

128

128.75

... More
2 km

1

147

147.44

... More
3 Km

1

165

165.84

... More
4 km

1

183

183.58

... More
5 km

1

200

200.74

... More
Beyond 5 Km upto 10 km /km

1

15

15.66

... More
Beyond 10 Km upto 20 km /km

1

13

13.09

... More
Beyond 20 km /every additional Km

1

11

11.04

... More
Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( RCC pipes 600mm )

-

-

-

... More
1 Km

100

469020

4690.2

... More
2 km

100

537119

5371.19

... More
3 Km

100

604139

6041.39

... More
4 km

100

668797

6687.97

... More
5 km

100

731286

7312.86

... More
Beyond 5 Km upto 10 km /km

100

57065

570.65

... More
Beyond 10 Km upto 20 km /km

100

47677

476.77

... More
Beyond 20 km /every additional Km

100

40207

402.07

... More
Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( RCC pipes 450mm )

-

-

-

... More
1 Km

100

312680

3126.8

... More
2 km

100

358079

3580.79

... More
3 Km

100

402759

4027.59

... More
4 km

100

445865

4458.65

... More
5 km

100

487524

4875.24

... More
Beyond 5 Km upto 10 km /km

100

38043

380.43

... More
Beyond 10 Km upto 20 km /km

100

31785

317.85

... More
Beyond 20 km /every additional Km

100

26805

268.05

... More
Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( RCC pipes 300mm )

-

-

-

... More
1 Km

100

134006

1340.06

... More
2 km

100

153463

1534.63

... More
3 Km

100

172611

1726.11

... More
4 km

100

191085

1910.85

... More
5 km

100

208939

2089.39

... More
Beyond 5 Km upto 10 km /km

100

16304

163.04

... More
Beyond 10 Km upto 20 km /km

100

13622

136.22

... More
Beyond 20 km /every additional Km

100

11488

114.88

... More
Carraige of materials from souce to actual site of work by Mechanical transport including cost of loading, unloading and stacking ( RCC pipes 250mm )

-

-

-

... More
1 Km

100

108418

1084.18

... More
2 km

100

124159

1241.59

... More
3 Km

100

139651

1396.51

... More
4 km

100

154598

1545.98

... More
5 km

100

169043

1690.43

... More
Beyond 5 Km upto 10 km /km

100

13191

131.91

... More
Beyond 10 Km upto 20 km /km

100

11021

110.21

... More
Beyond 20 km /every additional Km

100

9294

92.94

... More
Carraige of materials by manual means from dumping site to acual site of work including loading, unloading and stacking (Earth)

-

-

-

... More
for first 50 mtrs.

1

200

200.67

... More
for every additional 50 mtrs

1

43

43.69

... More
Carraige of materials by manual means from dumping site to acual site of work including loading, unloading and stacking (stone solling)

-

-

-

... More
for first 50 mtrs.

1

236

236.08

... More
for every additional 50 mtrs

1

51

51.4

... More
Carraige of materials by manual means from dumping site to acual site of work including loading, unloading and stacking (40 mm stone aggregate)

-

-

-

... More
For First 50 Mtrs

1

216

216.94

... More
for every additional 50 mtrs

1

47

47.23

... More
Carraige of materials from dumping site to actual site of work by manual means including cost of loading, unloading and stacking etc ( RCC pipes1st 50m )

-

-

-

... More
600mm

100

449300

4493

... More
450mm

100

408454

4084.54

... More
300mm

100

184139

1841.39

... More
250mm

100

147151

1471.51

... More
Carraige of materials from dumping site to actual site of work by manual means including cost of loading, unloading and stacking etc ( RCC pipes Additional 50m )

-

-

-

... More
600mm

100

65930

659.3

... More
450mm

100

59936

599.36

... More
300mm

100

27020

270.2

... More
250mm

100

21593

215.93

... More
Carraige of materials by manual means from dumping site to acual site of work including loading, unloading and stacking (20 mm aggregate)

-

-

-

... More
For First 50 Mtrs

1

200

200.67

... More
for every additional 50 mtrs

1

43

43.69



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.