Irrigation And Flood Control Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Works
Civil And Construction
Eprocure
Opening Date12 Mar 2025
Closing Date1 Apr 2025
Tender Amount₹ 5,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
On Slopes (Behind pitching)

1

261

261.45

... More
Opening out old wire crates those and re-binding after filling.

1

35

35.6

... More
Supply of Stone boulder (nallah) nominal size 225 mm

1

700

700

... More
Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags and earth / sand.

1

7

7.8

... More
loading/unloading sand/earth filled bags in lorries/boats lead upto 50 Mtr

1

4

4.95

... More
Unloading sand/earth filled bags for placing from boats/lorries

-

-

-

... More
Placing in dry

1

9

9.25

... More
Placing in Water

1

18

18.5

... More
Engagement of Labourer (Skilled)

1

960

960

... More
Engagement of Labourer (Unskilled)

1

725

725

... More
Engagement of Boatman

1

820

820

... More
Engagement of Boat (Capacity Upto 2.000 Cum)

1

1375

1375

... More
Engagement of Cutting Saw Machine Including POL and Operator(Complete)

1

1350

1350

... More
Supplying and stacking of good earth at site including royalty (earth measured in stacks will be reduced by 20% for payment)

1

281

281.3

... More
Supplying and Stacking of Stone Dust at Site Including Royality(Complete)

1

730

730

... More
Supplying and Stacking of Sand at Site Including Royality(Complete)

1

770

770

... More
Engagement of JCB including POL and driver complete for variou canal operations including removal of encroachments

1

1400

1400

... More
Idle Chrages

1

800

800

... More
Engagement of Poclain/L&T-220(Chain Driven ) Including POL and driver Complete.

1

3500

3500

... More
Idle Chrages

1

2000

2000

... More
Engagement of Poclain/L&T-110/70/60 (Chain Driven ) Including POL and driver Complete.

1

2400

2400

... More
Idle Chrages

1

800

800

... More
Hire Charges of Contract Carrier (vehicle) Like Sumo/Scorpio/Tawera during day or night alongwith licensed comercial driver for site inspection/Emergency Situations/ movement of officials within the Divisional jurisdiction including Driver and POL on need basis only within an average of 20Km's Journey or a Part thereof (complete).

1

1500

1500

... More
For additional Lead of every Km beyond 20Km Lead

1

65

65

... More
Providing wood work in frames of false ceiling, partitions, flumes etc, sawn and fixed in position including all sorts of carriages and other incidentals /accessories etc (Complete Job). Poplar Wood

1

850

850

... More
Providing refreshment to supervisory staff for restoration of water during night /day or the participants of the Independence Day , Republic day or other official Functions complete job including packing at venue with following Menu :

-

-

-

... More
Water Bottle One litre.

1

20

20

... More
Boiled Egg.

1

10

10

... More
Dal 50 g Pack.

1

10

10

... More
Banana.

1

10

10

... More
Tea Sugar each Cup.

1

20

20

... More
Tea Namkeen each Cup.

1

20

20

... More
Butter Toast

1

20

20

... More
Bread Slice

1

10

10

... More
Normal Chicken Biryani

1

150

150

... More
Veg Fried Rice/Biryani Veg

1

120

120

... More
Chicken Kanti With Naan

1

220

220

... More
Mutton Kanti With Naan

1

250

250

... More
Normal Mutton Kabab

1

280

280

... More
Plain Rice Plate

1

60

60

... More
Mutton (Rogan josh)/Rista/Gustaba etc.

1

150

150

... More
Engagement of Contract Carrier for carriage of material within jurisdiction including Driver and (POL) if and when needed Upto an average lead of 20Km's Journey or a part thereof. (Complete) a) Tata Mobile Having a load carrying capacity of 1MT.

1

1000

1000

... More
For additional Lead of every Km beyond 20Km Lead

1

50

50

... More
Providing and fixing of ply board (BWR) with nails and screws etc, including all sorts of the carriages upto the site of work as per the direction and to the entire satisfaction of Engineer In Charge (Complete Job)

-

-

-

1

600

600

1

415

415

1

250

250

... More
Carriage of material from Approved Source up to dumping site of work, including loading, unloading and stacking etc. complete by Mechanical Transport

-

-

-

... More
Crates for an avg. lead upto 01 Kms

1

343

343.32

... More
Crates for an avg. lead upto 02 Kms

1

393

393.17

... More
Crates for an avg. lead upto 03 Kms

1

442

442.23

... More
Crates for an avg. lead upto 04 Kms

1

489

489.56

... More
Crates for an avg. lead upto 05 Kms

1

535

535.3

... More
Crates for an avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

41

41.77

... More
Crates from an avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

34

34.9

... More
Crates from an avg. lead beyond 20 Kms per additional Km

1

29

29.43

... More
Sand/20mm Agg/Stone Dust for an average lead of upto 01 Kms

1

128

128.75

... More
Sand/20mm Agg/Stone Dust for an average lead upto 02 Kms

1

147

147.44

... More
Sand/20mm Agg/Stone Dust for an average lead upto 03 Kms

1

165

165.84

... More
Sand/20mm Agg/Stone Dust for an average lead upto 04 Kms

1

183

183.58

... More
Sand/20mm Agg/Stone Dust for an average lead upto 05 Kms

1

200

200.74

... More
Sand/20mm Agg/Stone Dust for an average lead beyond 5 Kms upto 10 Kms (per Km)

1

15

15.66

... More
Sand/20mm Agg/Stone Dust for an average lead beyond 10 Kms upto 20 Kms (per Km)

1

13

13.09

... More
Sand/20mm Agg/Stone Dust for an average lead beyond 20 Kms per additional Km

1

11

11.04

... More
Earth for an avg. lead of upto 01 Kms

1

160

160.93

... More
Earth for an avg. lead upto 02 Kms

1

184

184.3

... More
Earth for an avg. lead upto 03 Kms

1

207

207.3

... More
Earth for an avg. lead upto 04 Kms

1

229

229.48

... More
Earth for an avg. lead upto 05 Kms

1

250

250.92

... More
Earth for an avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

19

19.58

... More
Earth for an avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

16

16.38

... More
Earth for an avg. lead beyond 20 Kms per additional Km

1

13

13.8

... More
Empty Cement Bags for an avg. lead of upto 01 Kms

1

51

51.5

... More
Empty Cement Bags for an avg. lead upto 02 Kms

1

58

58.98

... More
Empty Cement Bags for an avg. lead upto 03 Kms

1

66

66.33

... More
Empty Cement Bags for an avg. lead upto 04 Kms

1

73

73.43

... More
Empty Cement Bags for an avg. lead upto 05 Kms

1

80

80.3

... More
Empty Cement Bags for an avg. lead beyond 5 Kms upto 10 Kms (per Km)

1

6

6.27

... More
Empty Cement Bags for an avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

5

5.23

... More
Empty Cement Bags for an avg. lead beyond 20 Kms per additional Km

1

4

4.41

... More
Stone avg. lead of upto 1 Km

1

151

151.47

... More
Stone avg. lead upto 2 Kms

1

173

173.46

... More
Stone avg. lead upto 3 Kms

1

195

195.1

... More
Stone avg. lead upto 4 Kms

1

215

215.98

... More
Stone avg. lead upto 5 Kms

1

236

236.16

... More
Stone avg. lead beyond 05 Kms upto 10 Kms (per Km)

1

18

18.43

... More
Stone avg. lead beyond 10 Kms upto 20 Kms (per Km)

1

15

15.4

... More
Stone avg. lead beyond 20 Kms per additional Km

1

12

12.98

... More
Extra Carriage of material from dumping site to actual site of work, including loading, unloading and stacking etc. complete by manual labour

-

-

-

... More
stones for an avg. lead upto 50 mtr.

1

236

236.08

... More
stones for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

51

51.4

... More
Sand/20mm Agg/Stone Dust for an average lead upto 50Mtr

1

200

200.67

... More
Sand/20mm Agg/Stone Dust for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
Earth for an average lead upto 50Mtrs

1

200

200.67

... More
Earth for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

43

43.69

... More
Empty Cement bags for an average lead upto 50Mtrs

1

37

37.46

... More
Empty Cement bags for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

8

8.16

... More
Crates for an average lead upto 50Mtrs

1

146

146.51

... More
Crates for an every additional lead of 50 mtrs or part thereof beyond 1st 50 mtrs.

1

21

21.5

... More
Providing and fixing of Sign boards/ Flex banners of required size as per the directions of Engineer In-charge attached with light wieght square section Mild steel frame including all sorts of carraige complete.

1

40

40



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.