Housing And Urban Development Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Housing And Urban Development Department - HAUDD Tender
Civil And Construction
Eprocure
Opening Date16 Nov 2024
Closing Date25 Nov 2024
Tender Amount₹ 1,88,46,491
Costs
EMD
₹ 3,76,930Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HAUDD_255478_2Bid Award Id
ViewTender No
NIT No.05 of 2024-25 PawzalporaTender Authority
Housing And Urban Development Department ViewPurchaser Address
-Website
http://jktenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Removal of unhygienic materials (so classified buy engineer incharge) from designated site and its disposal as per directions all inclusive.@ 30% of cross sectional area.
666.9
189
126177.48
... More
Silt clearance from canal/Nallah inclusive of initial lead and lift(50m and 1.5m respectively) wet @ 70 % of cross sectional area
1556.1
184
287800.7
... More
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres:all kinds of soil
2120
256
544522
... More
Close timbering in trenches including strutting, shoring and packing cavities complete. (provision of 60% of total area.Actual to be provided as per site requirement) (Measurements to be taken of the face area timbered). Depth exceeding 1.5 m.(To be paid as per actual.)
2160
255
551232
... More
Construction of ring bund /diversion bund by way of placing earth/sand filled bags in position incl cost of bags, filling of bags, cost of earth/sand etc incl. all sort of carriages for diversion of water including cost of dewatering etc and including cost of removal of ring bund and disposal at Guptganga complete job.(To be paid as per actual.)
600
1470
882000
... More
Providing,Laying, spreading of soling stone ( nallah boulders ) inc including carriage of 20 km
360
1200
432000
... More
Providing and laying in position specified grade of reinforced cement concrete
including curing but excluding the cost of centering, shuttering, finishing and
reinforcement. All works upto plinth level. 1:1.5:3 (1 cement:1.5 coarse sand:4 graded stone aggregate 20mm nominal size)
300
7788
2336520
... More
Providing and laying cement concrete in retaining walls, return walls, walls (any
thickness) including attached pilasters, columns, piers, abutments, pillars, posts,
struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors
blocks, plain window sills, fillets etc upto floor V level, including curing but
excluding the cost of centring, shuttering and finishing with.1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm N.size)
720
8422
6064164
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.@ 80kg/cum
24000
123
2956800
... More
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
500
286
143175
... More
Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc.
3200
628
2012640
... More
Dumping/filling of stone for base filling ,including cost of stones. Stackes measured to be reduced by 15%.
225
937
211027.5
... More
Filling available excavated earth(excluding rock) in trenches.plinth,sides of foundations etc, in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5 M
1400
218
305760
... More
Providing weep holes in plain/RCC , wing walls, return walls with 100mm dia pvc pipe type B extending through full width of structure with slope 1v:20h towards the drawing face complete including all carriages.@200mm c/c
2250
31
69750
... More
Carriage of material by Mechanical Transport from approved source to site of work
-
-
-
... More
Stone aggregate 20 mm nominal size from Athwajan avg lead 20 kms
918
301
276905.52
... More
Sand From Ganderbal avg lead 15 kms
459
340
156339.99
... More
Excavated earth/silt from site to dumping site at Gupt ganga Av lead 3 km after allowing 20% shrinkage
808.71
204
165284.15
... More
Carriage of material by Manual Means/head load 350m lead
-
-
-
... More
Stone Agg 20mm
918
451
414137.34
... More
Sand
459
451
207068.67
... More
Excavated Earth/silt from site of work upto dumping site avg. leaad of 350 meters. (to be paid calculated as per actual)
808.71
451
364833.34