Housing And Urban Development Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Housing And Urban Development Department - HAUDD Tender
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date17 Sep 2024
Closing DateCancelled
Tender Amount₹ 41,50,00,000
Costs
EMD
₹ 83,00,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Summary
Survey, Design And Execution Of Work Sewerage Scheme Missing Links In Division A Jammu City On Epc Mode With 6 Months Period
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HAUDD_258476_1Tender No
E-NIT No 10 of 2024-25 Dated 17-09-2024Tender Authority
Housing And Urban Development Department ViewPurchaser Address
-Website
http://http://jkhudd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
250 mm dia
1489
-
-
... More
300 mm dia
2002
-
-
... More
350 mm dia
825
-
-
... More
400 mm dia
262
-
-
... More
450 mm dia
585
-
-
... More
Providing, Laying, Jointing, Testing and Commissioning of High Density Polyethylene pipes, (HDPE), PE-80 grade, PN-6, confirming to IS:14333 for sewergae network. The work shall include all costs for the supply of pipes, jointing material and other materials, transport, plant, labour and equipment for excavating, shoring, dewatering, formation preparation, bedding, installing to true line and level, fittings and jointing, testing, surrounding, backfilling, compacting, temporary & paremenent surface/road reinstatement/restoration, disposal of surplus excavated materials within 15 Kms., etc. under the designed sewerage system in conformance with the Technical Specification and Approved Drawings.
-
-
-
... More
160 mm dia
1500
-
-
... More
200 mm dia
1200
-
-
... More
B. Manholes
-
-
-
... More
Construction of RCC Manholes. The quoted rates shall include all costs for the supply of all materials, transport, plant, labour and equipment for excavating, shoring, dewatering, formation preparation, testing, backfilling, compacting, temporary surface reinstatement, disposal of surplus excavated materials within 15 Kms., etc. the designed sewerage system in conformance with the Technical Specification and Approved Drawings incl construction of Drop manhole whereever requried.
-
-
-
... More
900mm dia x 1670 mm depths
666
-
-
... More
1200mm dia x 2290 mm depths
236
-
-
... More
1500 mm dia x 4950 mm depths
129
-
-
... More
C. House Connections
-
-
-
... More
Providing and Construction of masonry chamber 45x45x60cm with providing, laying, jointing & testing of 110 mm dia UPVC SDR 34 IS 15328: 2003 & 160 mm dia HDPE PN-4, PE-80, IS 14333: 1996 sewer pipes and type D bedding for property/ house sewer connections, including the connectivity of Property/ House hold to this chamber 45x45x60cm with UPVC 110 mm dia and further connecting this chamber to the nearest Manhole with 160 mm dia HDPE PN4 PE 80. The quoted rates shall include all costs for the supply of all materials, transport, plant, labour and equipment for excavating, shoring, dewatering, formation preparation, testing,backfilling,compacting, temporary surface reinstatement, disposal of surplus excavated materials within 15 Kms., etc. the designed sewerage system conformance with the technical specification and approved drawings. With 75 class designation brick work in cement mortar 1:4 (1cement: 4coarse sand) with C.I. Cover to serve as house sewer connecting chamber @ 1 no. between 2 houses (complete job including connecting two nos. house with one /per chamber)
10724
-
-
... More
Providing and Construction of masonry chamber 60x60x60cm with providing, laying, jointing & testing of UPVC SDR 34 IS 15328: 2003/ HDPE PN-4, PE-80, IS 14333: 1996 sewer pipes and type D bedding for property/ house sewer connections, including the connectivity of Property/ House hold to this chamber 45x45x60cm with UPVC 110 mm dia and further connecting this chamber to the nearest Manhole with 160 mm dia HDPE PN4 PE 80. The quoted rates shall include all costs for the supply of all materials, transport, plant, labour and equipment for excavating, shoring, dewatering, formation preparation, testing,backfilling,compacting, temporary surface reinstatement, disposal of surplus excavated materials within 15 Kms., etc. the designed sewerage system conformance with the technical specification and approved drawings. With 75 class designation brick work in cement mortar 1:4 (1cement: 4coarse sand) with C.I. Cover to serve as house sewer connecting chamber @ 1 no. between 2 houses & 1 no per hotels/ resort 1no. (complete job including connecting two nos. house with one /per chamber)
1949
-
-
... More
O & M Works
-
-
-
... More
Operation & Maintenance (O&M) of Sewerage Network, shall be done by the bidder for 5 years . The cost of manpower and other consumables shall have to be quoted by the bidder. The period of O&M shall start after completion of 6 months successful trail run.
60
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements