Housing And Urban Development Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Housing And Urban Development Department - HAUDD Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date19 Oct 2024
Closing Date7 Nov 2024
Tender Amount₹ 3,69,83,196.39 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
EEarth work in bulk excavation by manual means over areas (exceeding 30cm. I 1.5m in depth, 1.5m in epth, 1.5m in width as well as 10sqm. on plan) including disposal of excavated earth upto 1mtr. for cutting edge disposed earth to be leveled and neatly dressed in:- All kinds of soil.

3315.97

479

1589344.42

... More
Supply and laying of dry stone hand packed

1816.18

1216

2209201.35

... More
Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level in:- 1:5:10 (1cement: 5coarse sand: 10graded stone aggregate 40mm nominal size) Crushed

156.17

4826

753754.51

... More
Providing & laying in position Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level:- 1:3:6 (1cement: 3coarse sand: 6graded stone aggregate 40mm nominal size)Crushed.

923.38

5733

5294291.57

... More
Providing & laying in position Rainforced Cement concrete of specified grade excluding the cost of centring & shuttering All work upto Plinth level:- 1:2:4 (1cement: 2coarse sand: 4graded stone aggregate 40mm nominal size)Crushed.

324.2

6591

2136883.25

... More
Centring & shuttering including strutting propping etc. & removal of form work for:a) - foundation, footings basis of colums etc for Mass complete .

3470.4

286

993749.04

... More
Suspended floors roofs, landings, balconies and access plat form.

694.08

718

498522.96

... More
Edges of slabs & breaks in floors & walls Above 20cms wide.

867.6

1145

993488.76

... More
Reinforcement for R.C.C. work including straightening cutting bending ,placing in position and binding all complete -Thermo mechanically treated Bars of grade Fc.-500 or more.

20076.3

123

2473400.16

... More
Providig Fixing ofRCC 56m manhole covers including all safe carriage upto site of work craft etc job as directed as site by Engineer in charge

482

1903

917246

... More
Filling available excavated earth (excld. Rock) in trenches plinth slides of foundation etc. layers not exceeding 20cm in depth consolidating each deposited layer by ramming & watering lead upto 50m. & lift upto 1.5m.

5305.6

218

1158743.04

... More
Providing and laying non pressure of specified class RCC pipes including collars /spigot jointed with stiff mixture of Cement mortar in the proportion of 1:2 (1 cement: 2 sand) including testing of joints etc, complete NP3 300 mm dia including carriage.

5980

1724

10312868.8

... More
Providing and laying non pressure of specified class RCC pipes including collars /spigot jointed with stiff mixture of Cement mortar in the proportion of 1:2 (1 cement: 2 sand) including testing of joints etc, complete NP3 350 mm dia including carriage.

671.6

2011

1351245.77

... More
Supply and laying

798.19

1200

957828

... More
Carriage of materials by mechanical transport including loading, unloading & stacking from approved source to site of work:- Stone soling from Athwajan

1816.18

400

727743.33

... More
40mm N.S. stone agg.

140.7

370

52084.33

... More
20mm N.S. Stone agg

1263.55

340

430377.77

... More
Sand from Ganderbal for

92.16

340

31390.62

... More
Disposal of surplus earth from site work to the dumpig site of work By during site of avg lead of 500 Mts By mechanical transport

3315.97

80

266802.95



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.