Housing And Urban Development Department Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Housing And Urban Development Department - HAUDD Tender
Eprocure
Opening Date19 Nov 2019
Closing Date28 Nov 2019
Tender Amount₹ 7,00,000
Costs
EMD
₹ 14,000Document Cost
₹ 750Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_HAUDD_86163_5Bid Award Id
ViewTender No
146-LBJ(II) of 2019-20 dated 18/11/2019Tender Authority
Housing And Urban Development Department ViewPurchaser Address
-Website
http://http://jkhudd.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement all work upto plinth level.1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size)
16.25
-
4810.7
... More
Reinforcement of RCC work including straightening, cutting, bending, placing in position and binding all complete. Cold twisted bars.
1089
-
71
... More
Structural steel work welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
350
-
98.15
... More
Stone filling hand packed including supply of stones.
9.06
-
327.05
... More
Centring and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
148.7
-
179.25
... More
Centring and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform.
55.76
-
372.4
... More
Labour engagement for clearance of site as per direction of engineer incharge
10
-
300
... More
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.50 mtrs in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.50 mtr. Including disposal of excavated earth upto 1 mtrs from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil.
79.26
-
240.45
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering – all work upto plinth level. 1:5:10 (1 cement: 5 fine sand: 10 graded stone aggregate 40mm nominal size)
57.94
-
2671.35
... More
Centring and shuttering including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls. Under 20 cms wide.
200.45
-
176.55
... More
Disposal of mulba 3 kms
55.5
-
106.79
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements