Horticulture Planning And Marketing Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Horticulture Planning And Marketing Department - HPM Tender
Excavation
Eprocure
Opening Date3 Feb 2020
Closing Date10 Feb 2020
Tender Amount₹ 1,56,000
Costs
EMD
₹ 3,120Document Cost
₹ 600Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_HPM_91808_1Bid Award Id
ViewTender No
e-NIT No.41 of 2019-20 dated 03-02-2020Tender Authority
Horticulture Planning And Marketing Department ViewPurchaser Address
-Website
http://http://jkdhpm.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Centering and shuttering including strutting , propping etc. and removal of form far:-
-
-
-
In foundations, Footings, bases of columns etc. for mass concrete.
5.82
-
179.25
Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level. 1:3:6 (1 cement :3 coarse sand:6 graded stone aggregate 20 mm nomianl size)Crushed.
4.19
-
3707.4
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering -All work upto plinth level. 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20mm nominal size) Crushed.
0.09
-
4575.5
Brickwork withcommon burnt clay F.P.S.(non-modular) bricks of class designation 75 in foundation and plinth in cement mortar 1:6 ( 1cement : 6 coarse sand)
4.58
-
4551.45
Structural steel work welded in built up sections of truss and frame work including cutting hosting fixing in position and applying priming coat of steel primer.
656
-
80.6
15 mm cement plaster on the rough side of single or half brick wall of mix . 1:6 ( 1 cement: 6 fine sand)
42.38
-
163.65
Providing corrugated G.S sheet roofing including vertical/curved surface fixed wth polymer coated J or hooks, bolts and nuts 8mm diameter with bitumen and G.i limpet washers or with G.I limpet washers filled with white lead and including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete ( upto any pitch in horizontal/ vertical or curved surface) excluding the cost of purilins and trusses and including cutting to size and shape whereever required . 0.63mm thick with zinc coating not less than 275gm/m2.
31.22
-
757
Providing and fixing fly proof galvanised M.S. wire gauze to windows and clerestory windows using galvanised M.S. wire gauge with average width of aperture 1.4 mm in both directions with wire of ida. 0.63 mm all complete. With 2nd class teak wood beading 62x19mm.
1
-
772.55
Carriage of Material by Machenical Transport including Loading , unloading & stacking at site complete.
-
-
-
Sand (av.distance of 20 km)
4.69
-
243.88
Stone aggregate upto 40mm (av.distance of 10 km)
5.5
-
171.78
Bricks (av.distance of 80 km)
2175
-
1.58
Stone(av.distance of 20 km)
1.84
-
286.91
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements