Forest Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Forest Department Tender

Works
Civil And Construction
Construction Material
Eprocure
Opening Date24 Jul 2024
Closing Date30 Jul 2024
Tender Amount₹ 6,27,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)

11.97

78897

6591.25

... More
Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns

171.93

49232

286.35

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.

13.1

2861

218.4

... More
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)

215.6

21290

98.75

... More
Supply of precast cement conc. poles of size 75mmx75mmx1800mm (including carriage)

415

103750

250

... More
Erecting c.conc. Poles in position.Qty vide item no.8

415

12450

30

... More
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, , last but one end post and corner post shall be strutted on both sides and end post one side only, provided with 5 horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 meters (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire .

8156.25

101545

12.45

... More
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. . (STAIR)

35

6356

181.6

... More
Sign board incl carriage PAINTING &WRITING COMPLETE JOB. Os Size: 5.00 x 3.00 Ft with vertical iron angle 2 Nos of size 40x40x6 mm iron angle of height 7 ft with 1 mm thick M.S sheet.

1

7000

7000

... More
Carriage of materials from source to site of work by M.T. Sand av. Distance 20 KM and HL 2000 mtr

9.26

21645

2337.54

... More
Carriage of materials from source to site of work by M.T Bajri av. 20 KM and HL 2000 mtr

15.63

36535

2337.54

... More
Planting of Sapliing

3000

88020

29.34

... More
Patch Sowing

3000

20970

6.99



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.