Forest Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Forest Department - FD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date26 Jun 2024
Closing Date8 Jul 2024
Tender Amount₹ 4,82,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing & laying dry stone soling hand packed including ramming, watering and dressing complete. Blocks for Angle Iron Posts.

1.79

2237

1250

... More
Providing & laying cement concrete of specificied grade excl. cost of centering and shuttering 1:3:6 (1cement, 3 coarse sand, 6 graded stone aggregate 20mm nominal size ). Blocks for Angle Iron Posts

9.66

55386

5733.6

... More
Centering and shuttering including strutting, propping etc and removal of form work for.Walls, pilasters, plinths, string courses etc. Blocks for Angle Iron Posts.

27

7731

286.35

... More
Painting with ready mixed synthetic enamel paint of approved brand and manafacture in all shades to given an even shade to Angle Iron fence Post. (two or more coats on new steel work). And Wood Premier and Wood Paint for wooden fence posts.

53.03

6843

129.05

... More
Providing & fixing M.S Iron Sheet 3 mm of required pattern for Sign Board fixed in Angle Iron 7.5 feet length (50X50X6mm) in cement concrete blocks with frame of Angle Iron 50X6mm and flat iron 50X6mm including all necessary fittings, writings, premixing coat of steel premier two coats of steel paint Including Mechnical carriages, Head load, loading & unloading etc from approved source up to site of work complete job . (Sign Board)

40

4832

120.8

... More
Main Entrance Gate including all necessary fittings, writings, premixing coat of steel premier two coats of steel paint Including loading & unloading etc from approved source up to site of work complete job .

50

6040

120.8

... More
Carriage of materials by Mechanical Transport from Source up to dumping site of work

-

-

-

... More
Sand av 50 kmts

4.35

2649

609.02

... More
Bagri from 50 kmts

8.69

5292

609.02

... More
Carriage of materials by Head Load from dumping site up to site of work

-

-

-

... More
Sand av. 500 mts

4.35

2349

540.18

... More
Bagri 40 mm av 500 mts

8.69

4694

540.18

... More
Construction of Inspection Path 1.5 MT wide with standard specification (Earthwork in making of Inspection Path 1.5 meter wide)

0.25

11305

45221

... More
Construction of Permanent Fire Line 10 Mts in Width with standared specification

0.25

7312

29250

... More
Earth work in excavation in foundation trenches by manual means up to 1.5 m depth i/c disposal up to 75 m (Water Harvesting Structure)

86.15

57978

673

... More
Planting of saplings in pits of size 45cmx45cmx45cm within the available blanks including carriage/lifting of plants from different nurseries of Forest Department by mechanical transport within a maximum lead of 100 Kms and headload carriage including loading and unloading upto site of work with all operations. (Note:- Planting material shall be supplied departmentally)

1240

36381

29.34

... More
Dibbling- Dibbling including cost, carriage of seeds and labour charges along with seed procurements.

300

2154

7.18

... More
Patch Sowing of required species in patches Size 45cm x 45cm x 15cm including cost, carriage of seeds and labour charges along with seed procurements.

300

2097

6.99



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.