Forest Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Forest Department - FD Tender

Works
Civil And Construction
Civil Works Others
Excavation
Eprocure
Opening Date28 Oct 2024
Closing Date4 Nov 2024
Tender Amount₹ 3,75,000 
Notes
Download

Costs

Summary

1. Consolidation Of Boundaries By Fixation Of Pre-cast Boundary Pillars (168 Nos). In Protected Areas In 2. Consolidation Of Boundaries By Fixation Of Pre-cast Boundary Pillars (34) In Eco-sensitive Zone

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supply and placing of precast cement conc. Ploes (in pit) of Size 4'x4''x4''including all mechanical/manual transport /leads to the working site (complete job)

168

-

-

... More
Centring and shuttermg including strutting, propping etc. and removal of form work for·columns, piers, abutments, pillars,posts and struts etc (complete job)

93.68

-

-

... More
Painting of pillars (with superior exterior paint) including cost of labour charges including painting of WIlldife Department LOGO and front face of the pillar with stencil. For Protected Areas's BPs, Red Shade: Adventure 2189 (Nerolac)exterior emulsion paint is recommended. including writing and carriage complete job

168

-

-

... More
Carriage of materials inculding loading , unloading lead and lift complete job by Mechanical Transport a) Sand

7.18

-

-

... More
b) Bajri av.

13.6

-

-

... More
Carriage of materials inculding loading , unloading lead and lift complete job by Manual Labour a) Sand

7.18

-

-

... More
b) Bajri av.

13.6

-

-

... More
2. Fixation of Pre-cast Boundary Pillars (34 Nos). Around boundary of Eco-senstive zone of Surinsar-Mansar WLS Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including drssing of sides and ramming of bottoms lift upto 1.5 m including getting out excaveted earth and disposal ofsurplus excavated earth as directed 1 m from cutting edge, All kind of soil. ( complete job)

3.25

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:5:10 (1 cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size inculding all Mechanical and Head load carriage with complete job

1.08

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement :3 coarse sand :6 graded stone aggregate 20 mm nominal size inculding all Mechanical and Head load carriage with complete job

2.01

-

-

... More
Supply and placing of precast cement conc. Ploes (in pit) of Size 4'x4''x4''including all mechanical/manual transport /leads to the working site (complete job)

34

-

-

... More
Centring and shuttermg including strutting, propping etc. and removal of form work for·columns, piers, abutments, pillars,posts and struts etc (complete job)

18.96

-

-

... More
Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and front face of the pillar with stencil. For Eco-Sensitive Zone ( BPs), Green Shade: Adventure 2189 (Nerolac) exterior emulsion paint is recommended. including writing and carriage complete job

34

-

-

... More
Carriage of materials inculding loading , unloading lead and lift complete job by Mechanical Transport a) Sand

1.45

-

-

... More
b) Bajri av.

2.75

-

-

... More
Carriage of materials inculding loading , unloading lead and lift complete job by Manual Labour a) Sand

1.45

-

-

... More
b) Bajri av.

2.75

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.