Forest Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Forest Department - FD Tender
Civil And Construction
Civil Works Others
Excavation
Eprocure
Opening Date28 Oct 2024
Closing Date4 Nov 2024
Tender Amount₹ 3,75,000
Costs
EMD
₹ 11,250Document Cost
₹ 600Tender Fee
Refer Documents
Summary
1. Consolidation Of Boundaries By Fixation Of Pre-cast Boundary Pillars (168 Nos). In Protected Areas In 2. Consolidation Of Boundaries By Fixation Of Pre-cast Boundary Pillars (34) In Eco-sensitive Zone
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_FD_260979_2Tender No
NIT 13 WLW/K OF 2024-25Tender Authority
Forest Department ViewPurchaser Address
-Website
http://http://jkforest.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supply and placing of precast cement conc. Ploes (in pit) of Size 4'x4''x4''including all mechanical/manual transport /leads to the working site (complete job)
168
-
-
Centring and shuttermg including strutting, propping etc. and removal of form work for·columns, piers, abutments, pillars,posts and struts etc (complete job)
93.68
-
-
Painting of pillars (with superior exterior paint) including cost of labour charges including painting of WIlldife Department LOGO and front face of the pillar with stencil. For Protected Areas's BPs, Red Shade: Adventure 2189 (Nerolac)exterior emulsion paint is recommended. including writing and carriage complete job
168
-
-
Carriage of materials inculding loading , unloading lead and lift complete job by Mechanical Transport a) Sand
7.18
-
-
b) Bajri av.
13.6
-
-
Carriage of materials inculding loading , unloading lead and lift complete job by Manual Labour a) Sand
7.18
-
-
b) Bajri av.
13.6
-
-
2. Fixation of Pre-cast Boundary Pillars (34 Nos). Around boundary of Eco-senstive zone of Surinsar-Mansar WLS Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including drssing of sides and ramming of bottoms lift upto 1.5 m including getting out excaveted earth and disposal ofsurplus excavated earth as directed 1 m from cutting edge, All kind of soil. ( complete job)
3.25
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:5:10 (1 cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size inculding all Mechanical and Head load carriage with complete job
1.08
-
-
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement :3 coarse sand :6 graded stone aggregate 20 mm nominal size inculding all Mechanical and Head load carriage with complete job
2.01
-
-
Supply and placing of precast cement conc. Ploes (in pit) of Size 4'x4''x4''including all mechanical/manual transport /leads to the working site (complete job)
34
-
-
Centring and shuttermg including strutting, propping etc. and removal of form work for·columns, piers, abutments, pillars,posts and struts etc (complete job)
18.96
-
-
Painting of pillars (with superior exterior paint) including cost of labour charges including painting of Forest Department LOGO and front face of the pillar with stencil. For Eco-Sensitive Zone ( BPs), Green Shade: Adventure 2189 (Nerolac) exterior emulsion paint is recommended. including writing and carriage complete job
34
-
-
Carriage of materials inculding loading , unloading lead and lift complete job by Mechanical Transport a) Sand
1.45
-
-
b) Bajri av.
2.75
-
-
Carriage of materials inculding loading , unloading lead and lift complete job by Manual Labour a) Sand
1.45
-
-
b) Bajri av.
2.75
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements