Forest Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Forest Department - FD Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date4 Jul 2024
Closing Date19 Jul 2024
Tender Amount₹ 29,39,550
Costs
EMD
₹ 88,187Document Cost
₹ 600Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_FD_252106_1Bid Award Id
ViewTender No
07 of 2024-25Tender Authority
Forest Department ViewPurchaser Address
-Website
http://http://jkforest.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
iv. Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40mm nominal size) Crushed including all leads,lift and carriage complete job.
7.15
-
-
v. Centering and shuttering including strutting, propping etc. and removal of form for : foundations, footings, bases of columns, etc. for mass concrete
102.23
-
-
vi. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
7.79
-
-
vii. Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm)
112.66
-
-
viii. Supply of precast cement conc. poles of size 75mmx100mmx1800mm (including carriage)
220
-
-
ix. Erecting c.conc. Poles in position with all lifts and carriages
220
-
-
x. Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, , last but one end post and corner post shall be strutted on both sides and end post one side only, provided with 5 horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 meters (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire . To be paid as per actual
4840.7
-
-
xi. Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. . To be paid as per actual
35
-
-
xii.Sign board incl carriage PAINTING & WRITING COMPLETE JOB. Os Size: 5.00 x 3.00 Ft with vertical iron angle 2 Nos of size 40x40x6 mm iron angle of height 7 ft with 1 mm thick M.S sheet.
1
-
-
B. Chin Link Fencing:- i. Clearing jungle including uprooting of rank vegetation,grass,brush wood,trees and saplings upto girth of 30 cms measured at aheight of 1 m above ground level and removal of rubbish upto a distance of 50m outside the periphery of area cleared. 1- 1600x4 = 6400 Sft. (The item includes all kinds of carriages)
594.8
-
-
ii. Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. (Angle Post 200= 1.5'x1.5'x1' (Toe wal 1 = 1400x1.5'x0.5') = 1500 cft). (The item includes all kinds of carriages)
42.48
-
-
iii. Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 Cement : 5 coarse sand :10 graded stone aggregate 40 mm nominal size). (Angle Post 200= 1.0'x1.0'x0.25' (Toe wal 1 = 1400x1.0'x0.25') = 400 cft. (The item includes all kinds of carriages)
11.33
-
-
iv. Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40mm nominal size) Crushed. ( 200= 1.0'x1.25'). (The item includes all kinds of carriages)
7.08
-
-
v. Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 20mm nominal size) (Pannels 1400x1.0'x0.75') = 1050 Cft. (The item includes all kinds of carriages).
29.74
-
-
vi. Centering and shuttering including strutting, propping etc. and removal of form for : foundations, footings, bases of columns, etc. for mass concrete (Angle Post = 200(4) x1.0'x1.25' (Pannels 1= 1400x0.25') = 288.10 Sqm. (The item includes all kinds of carriages)
288.1
-
-
vii. Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.(A. Angle Iron 50x50x6mm = 2126.52 Kg. B. Angle Iron 40x40x6mm = 1707.32 Kg & C. Flat Iron 40x6mm = 1613.41 Kg). (The item includes all kinds of carriages)
5447.26
-
-
viii. Providing and fixing G. I. chain link fabric fencing of required width in mesh size 50x50mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete as per direction of Engineer-in-charge. Made of G. I. wire of dia 4mm. (1600x6 = 9600 Sft). (The item includes all kinds of carriages)
892.19
-
-
ix Painting with ready mixed synthetic enamel paint of approved brand and manufacture in all shades to give an even shade on new steel works.Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture ( 2= 1600x6 = 19200 Sft). (The item includes all kinds of carriages)
1159.85
-
-
C. Planting of Poly Bagged Plants in Trenches:- Transportation of saplings(Plants) from Batote nursery to the above work site, then site clearance, digging of Trenches of 90cmx45cmx45cm including excavation of soil and planting of seedlings/saplings in the pits, refilling with clean surface soil after planting with provision for water harvesting structure and maintenance for period of one month. The item includes all carriages.
2000
-
-
D. Planting of Naked Root Plants in Trenches:- Transportation of saplings(Plants) from Batote nursery to the above work site, then site clearance, digging of Trenches of 90cmx45cmx45cm including excavation of soil and planting of seedlings/saplings in the pits, refilling with clean surface soil after planting with provision for water harvesting structure and maintenance for period of one month. The item includes all carriages.
2000
-
-
E. Patch sowing work:- Cost and carriage of Conifer/Broad Leaved seed to the above work site, site clearance, digging patches of size 45cmx45cmx15cm including excavation of soil and sowing of Deo/Kail/Fir/Chir/Broad Leaved in the Patches, refilling with clean surface soil after sowing with provision for water harvesting structure and maintenance for period of one month. The item includes all carriages.
6000
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements