Forest Department Tender

... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Forest Department - FD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date8 Feb 2025
Closing Date14 Feb 2025
Tender Amount₹ 2,72,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)

22.9

5733

131297.15

... More
Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.-50 mm thick with 20mm nominal size stone aggregate.

4.93

562

2771.4

... More
Centring and shuttermg including strutting, propping etc. and removal of form for· Foundations: footings, bases of columns etc. for mass concrete

132.95

286

38070.23

... More
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.

12

181

2179.2

... More
Applying priming coat: With ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel galvanized iron/steel works.

0.56

53

30.02

... More
Painting with ready mixed synthetic enamel paint of approved brand and manufacture in all shades to give an even shade on new steel works.

0.56

131

73.84

... More
Carriage of materials from source to site by M.T./H.L average: Sand

13.76

545

7501.4

... More
Carriage of materials from source to site by M.T./H.L average: Bajri

27.52

591

16276.15

... More
Carriage of materials from source to site by M.T./H.L average: Stone

14.88

254

3788.3



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.