Forest Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Forest Department - FD Tender

Works
Civil And Construction
Civil Works Others
Agriculture or Forestry Works
Eprocure
Opening Date28 Feb 2024
Closing Date6 Mar 2024
Tender Amount₹ 15,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40mm nominal size) Crushed including all leads,lift and carriage complete job. ( 650 Pits = 1'.00' x 1'.00' x 1'.25") & (33 pits = 1'.00' x 1'.00' x 1'.00')

21.95

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for : foundations, footings, bases of columns, etc. for mass concrete. ( 650 pits = 1'.00" x 1'.25")x4

302.04

-

-

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. (650 Pits= 0.6"x 0.6" x1'.00)x4

18.41

-

-

... More
Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) (683 = 0.33 x 4.75)x2 (683 = 0.25 x 4.75)x2

349.75

-

-

... More
Supply of precast cement conc. poles of size 75mmx100mmx1800mm (including carriage)

683

-

-

... More
Erecting c.conc. Poles in position with all lifts and carriages

683

-

-

... More
Fencing with R.C.C. post placed at required distance, embedded in cement concrete blocks, , last but one end post and corner post shall be strutted on both sides and end post one side only, provided with 5 horizontal lines and two diagonals of barbed wire weighing 9.38 kg per 100 meters (minimum), between the two posts fitted and fixed with G.I. staples on wooden plugs or G.I. binding wire tied to 6 mm bar nibs fixed while casting the post (cost of R.C.C. posts, struts, earth work and concrete to be paid for separately) :- Payment to be made per meter cost of total length of barbed wire used. With G.I. barbed wire . To be paid as per actual

14345.27

-

-

... More
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. . To be paid as per actual

35

-

-

... More
Sign board incl carriage PAINTING & WRITING COMPLETE JOB. Os Size: 5.00 x 3.00 Ft with vertical iron angle 2 Nos of size 40x40x6 mm iron angle of height 7 ft with 1 mm thick M.S sheet.

1

-

-

... More
Planting of Poly Bagged Plants in Pits:- Transportation of saplings(Plants) from Batote nursery to the above work site, then site clearance, digging of pits of 45cmx45cmx45cm including excavation of soil and planting of seedlings/saplings in the pits, refilling with clean surface soil after planting with provision for water harvesting structure and maintenance for period of one month. The item includes all carriages.

15000

-

-

... More
Patch sowing work:- Cost and carriage of Conifer/Broad Leaved seed to the above work site, site clearance, digging patches of size 45cmx45cmx15cm including excavation of soil and sowing of Deo/Kail/Fir/Chir/Broad Leaved in the Patches, refilling with clean surface soil after sowing with provision for water harvesting structure and maintenance for period of one month. The item includes all carriages.

10000

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.