Forest Department Tender
... More
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Forest Department - FD Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date30 Oct 2023
Closing Date4 Nov 2023
Tender Amount₹ 15,59,492
Costs
EMD
₹ 31,190Document Cost
₹ 800Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_FD_235147_1Bid Award Id
ViewTender No
e- NIT No. 25 of 2023-24 DATED 28-10-2023Tender Authority
Forest Department ViewPurchaser Address
-Website
http://http://jkforest.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Centering and shuttering including strutting, propping etc and removal of form work for.
0.75
214
286.35
... More
Extraction of Willow Posts of length= 6'-6'', minimum mid-girth 8'' including Mechnical carriage, Head load, loading & unloading etc from approved source up to site of work, including filling and dressing of excavated soil, complete Job.
1186
8290
6.99
... More
Providing and fixing of MS Gate consisting of 50x50x6mm vertical angle 7.5 feet height and frame ,flats 50x6mm including all necessary fittings, applying a priming coat of approved red oxide steel primer and paint including mechanical carriage.Size 4 'x6'
50
4025
80.5
... More
Providing and fixing of M.S Iron sheet 3 mm of required pattern for Sign Board fixed in Angle Iron posts ,7.5 feet height , (50x50x6 mm) frame and flat iron 50x6 mm including all necessary fittings,including primimg coat including Mechanical Carriage (Sign Board) 3'x5'
40
4400
110
... More
Providing & Fixing of Black annealed Barbed Wire dia 2.00 mm having barbs at a distance of 75mm,plus-minus 12mm conforming to relevant ISI specification (IS:278 & 280) product code BABW, including all carriages from approved source up to site of work complete 6 STRAND
2845.8
327267
115
... More
Supply & fixing of required size of U-Nails including mechnical carriage, Head load, loading & unloading etc from approved source upto site. Complete work
79.07
7907
100
... More
Painting with ready mixed synthetic enamel paint of approved brand and manufacture in all shades to give an even shade (two or more coats on new steel work) Vertical Posts,and writing logo with paint on board and Gate painting
3.62
467
129.05
... More
Painting with ready mixed synthetic enamel paint of approved brand and manufacture in all shades to give an even shade (two or more coats on new wooden post) Vertical Posts including tarring of bottom portion of posts and tippimg of top portion of posts.
364.07
29125
80
... More
Carriage of different materials By Mechanical Transport including loading, unloading and stacking
-
-
-
... More
Sand and Bajri average 45 Kmts lead
0.38
185
488.24
... More
Carriage of materials by head Load from dumping siteupto site of work of work
-
-
-
... More
Sand and bajri average 2 kms
0.38
225
593.88
... More
Planting of Mawa by jumper planting method including the cost of extraction (for standard size 10" in length with 4" min. girth) with cost and carriage of Mawas upto the site of plantation.
60000
1150800
19.18
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements