Forest Department Tender
Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.
Forest Department - FD Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date26 Sep 2022
Closing Date1 Oct 2022
Tender Amount₹ 50,39,000
Costs
EMD
₹ 1,00,780Document Cost
₹ 1,600Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_FD_189985_1Bid Award Id
ViewTender No
e-NIT NO. 23 of 2022-23 DATED 26-09-2022Tender Authority
Forest Department ViewPurchaser Address
-Website
http://http://jkforest.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in exacavation by manual means in trenches for foundations, drains, pipes,cables etc (not exceeding 1.5m in width) and for shafts, wells,cesspits and the like not exceeding 10 sqm on plan,including dressing of sides and ramming of bottoms lift upto 1.5m,including getting out excavated earth and disposal of surplus excavated earth as directed Blocks for Angle Iron Posts For Entrance Gate & Board
59.34
-
-
... More
Providing and laying of dry stone soiling hand packed including ramming,watering and dressing complete Blocks for Angle Iron Posts For Entrance Gate & Board
8.35
-
-
... More
Providing and laying of cement concrete of specified grade excl cost of centering and shuttering 1:3:6 (1 Cement, 3 Coarse Sand, 6 graded stone aggregate 20 mm nominal size) crushed For Angle Iron Posts For Entrance Gate & Board posts
89.02
-
-
... More
Centering and shuttering including strutting,propping etc and removal of form work for walls,pilaters,plinths,string courses etc For Angle Iron Posts For Entrance Gate & Board posts
59.13
-
-
... More
Painting with ready mixed synthetic enamel paint of approved brand and manufacture in all shades to give an even shade (two or more coats on new steel work) Vertical Posts
426.08
-
-
... More
Providing and fixing of Angle iron 7.5 feet length (50x50x6mm),Flat Iron 50x6mm with welded mesh 2"x2" incl fixing in concrete blocks with all necessary fittings wwith a premixing coat of steel primer and two coats of steel paint including Mechanical Carriages,Head Load,Loading and unloading etc from approved source upto site of work complete Main Entrance Gate
72
-
-
... More
Providing and fixing of M.S Iron sheet 3 mm of required pattern for Sign Board fixed in Angle Iron posts 7.5 feet length (50x50x6 mm) and flat iron 50x6 mm including all necessary fittings, writing, premixing coat of steel primer and two coats of steel paint,including Mechanical Carriages,Head Load,Loading and unloading etc from approved source upto site of work complete (Sign Board)
52.5
-
-
... More
Dumping/Collection of stones from different Nallah pockets upto site of work avg.lead of 1000 mts For DRSM
1996.93
-
-
... More
Carriage of materials by Mechanical Transport from Source up dumping site of work
-
-
-
... More
Sand average 30 Kmts
45
-
-
... More
Bagri average 20 Kmts
75
-
-
... More
Carriage of materials by head Load from dumping siteupto site of work of work
-
-
-
... More
Sand average 2 kms
45
-
-
... More
Bagri average 2 Kms
75
-
-
... More
Earth work in excavation by manual means in trenches(pits) (not exceeding 1.5 m
in width) All kinds of soil :
690
-
-
... More
Earthwork in making of Inspection Path
304.68
-
-
... More
Providing and fixing of grass slips in patches as per the requirement on site
4500
-
-
... More
Performing of dibbling by manual means using a pointed hand tool for making desired holes in the ground as per seed requirements
1650
-
-
... More
Cutting, Grubbing and removal of Lantana in the current year during the active growth period of weed .
1
-
-
... More
Construction of Water Pond/Water hole with following specifications:
-
-
-
... More
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
2.7.4 Hard Rock (Blasting Prohibited)
118.95
-
-
... More
Collection and Providing of well graded stone in bottom layer of the pond not exceeding 0.30m in depth
26.76
-
-
... More
Providing and fixing of Dry random rubble masonry with hard stone in side of the pond upto the ground level
With bond stone.
38.29
-
-
... More
Head Load for the collection of stones for the proposed Pond upto 200m
65.05
-
-
... More
Providing and laying of 400 G polythene sheet all across the surface area
39
-
-
... More
Making of rain water collection drains towards pond with stone work all around
365.85
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements