Forest Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Forest Department Tender

Civil And Construction
Civil Works Others
Opening Date8 Feb 2023
Closing Date17 Feb 2023
Tender Amount₹ 20,32,794 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed, laid in layers not exceeding 150 mm thickness, well compacted using plate vibrators, including all lead & lifts, cost of all materials of quality, labour, Usage charges of machineries, curing, and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork shall be paid separately) Mix 1:3:6 (M10) Using 40 mm nominal size graded crushed coarse aggregates

14.22

-

88455.51

... More
Providing and laying in position Reinforced cement concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS Codes machine mixed with super plasticizers laid in finished layers, well compacted using needle vibrators, including all lead & lifts, cost of all materials, quality confirming to the requirements of relevant IS codes , labour, Usage charges of machinery, curing and all the other appurtenances required to complete the work as per technical specifications. (The cost of steel reinforcement & formwork to be paid separately) M20 Design Mix Using 20 mm nominal size graded crushed coarse aggregates

88.85

-

638710.66

... More
Transportation of used rails from railway yard to the stock yard including loading, transportation and unloading charges etc., complete. (Railway SSR 2011-12)

62.76

-

248433.58

... More
Providing Thermo-Mechanically Treated bars of grade Fe 500D or more Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position, binding and anchoring to adjacent members whereever necessary complete as per Design including cost of material, labour, usage charges complete as per specifications. (The laps and wastages shall not be measured separately)

462.38

-

43001.34

... More
Providing and supplying Bolt and nut (TVS make) 16 X 80mm, with 2nos of washers including material cost, loading, transportation and unloading charges etc., complete.

936

-

31449.6

... More
Fabrication and erection of rails including cutting of rails into suitable lengths, making holes using drill bits for fixing of anchor rods, horizontal rails to vertical rails including fixing of nuts and bolts in position as per drawing complete etc., Rate includes transportation of material from stock yard to work site. (Data Rate)

62762.96

-

571770.57

... More
Welding by gas or electric plant including transportation of plant at site etc. complete including cost of materials, labour, usage charges of machinery complete as per specifications and as per directions of the Engineer-in-Charge.

4708.08

-

11770.2

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.

39.08

-

8929.78



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.