Irrigation And Flood Control Department Tender

Search from the latest JKtenders and find a business opportunity fitting your SME on the online platform of BidAssist. If you're wondering how to find the latest JK tenders or from where to get all the documents without the hassles, this is what we explain here. Find the best opportunities coming to the surface via the JK government, PSUs and state corporations.

Irrigation And Flood Control Department - IFC Tender

Civil Works Water Works
Eprocure
Opening Date28 Feb 2020
Closing Date7 Mar 2020
Tender Amount₹ 19,90,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
G.I Pipe 50mm dia nominal bore [Light]

2000

-

27.75

... More
G.I Pipe 40mm dia nominal bore [Light]

1500

-

26.6

... More
G.I Pipe 32mm dia nominal bore [Light]

2000

-

20.25

... More
G.I Pipe 25mm dia nominal bore [Light]

5000

-

19.4

... More
G.I Pipe 20mm dia nominal bore [Light]

6600

-

13.05

... More
G.I Pipe 15mm dia nominal bore [Light]

7500

-

12.25

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth consolidation

2497.5

-

85.25

... More
Civil Work

-

-

-

... More
E/work in excavation by manual means over areas (exceeding 30cm and upto 1.5mtr in width as well as 10Sqm on plan) including disposal of excavated earth upto 1mtr. for cutting edge, disposed earth to be levelled & neately dressed in: (All kind of soil).

17.55

-

240.45

... More
Providing & laying in position cement concrete of specified grade excluding the c/o centring & shuttering all work upto plinth level in 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone aggr. 40MM nominal size (Crusher)

1.71

-

3112.8

... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centenng. shuttering, finishing and reinforcement-All work upto plinth level 1.1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size) Crusher

7.35

-

5504.2

... More
Reinforcement for RCC work incl. straighening, cutting, bending, placing in position & binding all complete cold twisted bars.

600

-

71

... More
centring and shuttering including strutting, propping etc.and removal of form work Foundation, footings, bares of column etc. for mass concrete

7.35

-

179.25

... More
centring and shuttering including strutting, propping etc.and removal of form work Retatning walls. return walls. walls (any thickness) including attached pilasters. buttresses. plinth and strmg courses fillets etc

80.64

-

342.8

... More
12mm thick cement plaster of mix 1:4 (1 cement : 4 coarse sand).

72.78

-

158.65

... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. Layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m.

17.64

-

102.2

... More
White washing with lime to give an even shade. New Work (three or more coats)

20.58

-

15.9



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.