Urban Development Department Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Urban Development Department - UDD Tender
Civil And Construction
Eprocure
Opening Date12 Apr 2022
Closing Date19 Apr 2022
Tender Amount₹ 8,50,000
Costs
EMD
₹ 21,250Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UDDHP_59466_1Bid Award Id
ViewTender No
9311-13 dt. 28.03.2022Tender Authority
Urban Development Department ViewPurchaser Address
-Website
http://http://ud.hp.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
2. The joint which has been repaid should be wrapped with hasson cloth after completely dipping in coal tar.
-
-
-
... More
3. The scheme shall not remain out of order for more than 6 hours otherwise penalty @1% of the award amount for every 6 hours shall be imposed on the contractor.
-
-
-
... More
4. If the performance of the contractor is not found satisfactory than the agreement shall be terminated.
-
-
-
... More
5. The contractor will hand over the scheme to the department in smooth running condition after expiry of contract failing which penalty as demand fit shall be imposed.
-
-
-
... More
6. Security, GST and other statutory deductions will be made as applicable.
-
-
-
... More
7. All arrangements for welding i.e electricity supply / generator set shall be arranged by the contractor at his level
-
-
-
... More
8. No escalation will be allowed under any circumstances.
-
-
-
... More
9. All the material to be used for repair work, replaced will be conforming to relevant I.S. specification.
-
-
-
... More
10. The dismantled parts shell be replaced with new genuine parts.
-
-
-
... More
11. Notwithstanding anything mention above, if any dispute arises regarding respire /replacement of parts / equipments etc. decision of the Engineer in charge will be final.
-
-
-
... More
12. All vales such as sluice valve, reflux value, or other valves fixed in the rising main will have to be kept operative without leakage.
-
-
-
... More
13. If the department vehicle will be deputed for carriage of equipment to contractor’s workshop than it will be charged at the out turn rates for private works.
-
-
-
... More
14. Credit of old nuts and bolts @Rs.15/- kg per kg shall be taken.
-
-
-
... More
15. Average depth of excavation for road portion shall not be less than 2.1mtr deep.
-
-
-
... More
16. The contractor/firm will be eligible only if they have completed / executed/ maintained similar nature of work before quoting the rates. Necessary certificate in this regard duly singed by concerned Executive Engineer in mandatory.
-
-
-
... More
17. The firm / contractor should have complete similar job with API pipe joint require work . Certified copy/ completion form Executive Engineer concerned be approved
-
-
-