Temple Trust Shri Naina Devi Ji Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Temple Trust Shri Naina Devi Ji Tender
Eprocure
Opening Date20 Nov 2019
Closing Date4 Dec 2019
Tender Amount₹ 12,70,823
Costs
EMD
₹ 25,500Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_NDTT_32719_1Bid Award Id
ViewTender No
TTND.Cons-e-Pro-4558-4567 dated 02.11.2019Tender Authority
Temple Trust Shri Naina Devi Ji ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
(b)Beams, Cantilivers, girders and lintels. (i) Sides and soffits of beams, beam haunching, cantilevers, bressumers and lintels not exceeding 1 mtr in depths in all heights from floor.
150.94
-
-
(c) Columns,pillars, posts and struts. (i) Circular or curved in plan.
49.78
-
-
( d) Edges of slabs and breaks in floors and walls. (i) Under 20cm wide.
80.7
-
-
(e) Stair case with sloping or stepped soffits excluding landing.
90.15
-
-
(f) Foundation, footing, basis of columns etc. and mass concrete.
35.19
-
-
P/laying cement concrete 1 :1.5: 3 (1 cement : 1.5 sand :3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced concrete work in :complete in all respects within all leads and lifts and best satisfaction of Engineer-in-Charge. (a) Suspended floors,roofs, landings and shelves and their supports, balconies, beams, girders, bressumers and cantilevers upto floor two level.
27.03
-
-
(b)Columns, pillars, posts and struts upto floor two level.
4.98
-
-
(c ) Fondantion footings bases of columns and the like and mass concrete
11.31
-
-
(d)Stair case (expcept spiral stair case) excluding landing but including preparing of the surface and fininshing of nosing upto floor two level.
26.42
-
-
Providing mild steel/Tor steel reinforcement for R.C.C. work including bending, binding and placing in position complete upto floor two level complete in all respect within all leads and lifts as per direction and best satisfaction of Engineer -in- Charge. (a) Tor steel. SAIL, TISCO (ISI Make)
8669.88
-
-
Steel work welded in built up sections, trusses and framed work, including cutting, hoisting , fixing in position and applying a priming coat of red lead paint complete in all respect within all leads and lifts as per direction and best satisfaction of Engineer -in- Charge. (a) In grating, framed guard bars, ladders, railing, brackets and similar work.
29.58
-
-
6 mm thick Cement plaster to ceiling complete in all respect within all leads and lifts as per direction and best satisfaction of Engineer -in- Charge. ( a) In cement mortar 1: 4 ( 1 cement : 4 sand)
108.94
-
-
Painting two coats ( including priming coat ) on new steel and other metal surfaces with enamel paint to give an even shade incuding cleaning the surface of dirt, dust and other foreign matter complete in all respect within all leads and lifts as per direction and best satisfaction of Engineer -in- Charge. (a) With enamel paint other than white. (Asian Paints)
105.16
-
-
Providig and laying red sand stone slab flooring 40 mm average thick on 20 mm average thick base of cement mortar 1: 4 ( 1 cement : 4 sand) laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab including rubbing and granite polish finish complete in all respect within all leads and lifts as per direction and best satisfaction of Engineer -in- Charge. (a) Red sand stone 40mm thickcement mortar 1: 4 ( 1 cement : 4 sand)
133.21
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements