Ropeway And Rapid Transport System Development Corporation HP Limited Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Ropeway And Rapid Transport System Development Corporation HP Limited - RTDC Tender
Eprocure
Opening Date18 Mar 2021
Closing Date29 Mar 2021
Tender AmountRefer Documents
Costs
EMD
₹ 1,32,500Document Cost
₹ 2,360Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_RTDCH_45728_1Bid Award Id
ViewTender No
RTDC/SkyWalk/2021/2129-30Tender Authority
Ropeway And Rapid Transport System Development Corporation HP Limited ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
RFP Construction of Sky walk from H.P. Sectt to Ayurvedic Hospital
Notice construction of Sky walk from H.P. Sectt. Stairs to Ayurvedic Hospital
BOQ Items
... More
Foundation of Retaining wall
6.9
-
-
... More
RCC Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) Foundation of Column
23.23
-
-
... More
Foundation of Retaining wall
18.3
-
-
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) Column
22.68
-
-
... More
Retaining wall
56.67
-
-
... More
FORMWORK Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete, Foundation of Column
42.24
-
-
... More
Foundation of Retaining wall-Along Span
16.64
-
-
... More
Foundation of Retaining wall-Along width
28.16
-
-
... More
Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. Retaining wall-Along Span
323.84
-
-
... More
Retaining wall-Along Width
51.52
-
-
... More
Columns, Pillars, Piers, Abutments, Posts
and Struts Columns
201.6
-
-
... More
REINFORCEMENT Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level, Hot rolled deformed bars @ 90 kg/cum
3738.24
-
-
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Hot rolled deformed bars @ 90 kg/cum
7141.68
-
-
... More
STRUCTURAL STEEL Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.:Hot finished welded type tubes
-
-
-
... More
FootBridge- Steel Hollow Square Sections
-
-
-
... More
180X180X8 mm @ 41.91 Kg/m (Main Girder)
14396.09
-
-
... More
100X100X6 mm @ 16.98 Kg/m (Cross Girder)
3124.32
-
-
... More
100X100X6 mm @ 16.98 Kg/m (Roof Girder) - Along Span
3888.42
-
-
... More
100X100X6 mm @ 16.98 Kg/m (Roof Girder) - Along Width
1562.16
-
-
... More
100X100X6 mm @ 16.98 Kg/m (Vertical Girder) - Along Width
3905.4
-
-
... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required
-
-
-
... More
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
-
-
-
... More
40X40X2.6 mm @ 2.92Kg/m section (Along Span)
1337.36
-
-
... More
40X40X2.6 mm @ 2.92Kg/m section (Along Height)
1604.83
-
-
... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.
-
-
-
... More
In stringers, treads, landings etc. of stair cases, including use of chequered plate wherever required, all complete (8 mm)
14381.2
-
-
... More
FLOOR FINISHING Marble work gang saw cut (polished and machine cut) of thickness 18 mm for wall lining (veneer work), backing filled with a grout of average 12 mm thick in cement mortar 1:3 (1 cement : 3 coarse sand), including pointing with white cement mortar 1:2 (1 white cement : 2 marble dust) with an admixture of pigment to match the marble shade (To be secured to the backing by means of cramps, which shall be paid for separately): Area of Slab over 0.50 sqm Raj Nagar Plain white marble/ Udaipur green marble/ Zebra black marble, Floor Finishing
229
-
-
... More
ROOF FINISHING Providing and fixing polycarbonate sheet
286.25
-
-
... More
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS : 13592 Type A, including jointing with seal ring conforming to IS : 5382, leaving 10 mm gap for thermal expansion, (i) Single socketed pipes.75 mm diameter
96
-
-
... More
WALL CLADDING
-
-
-
... More
Designing, fabrication, testing, installing and fixing in position Curtain Wall with Aluminium Composite Panel Cladding, with open grooves for linear as well as curvilinear portions of the building , for all heights and all levels etc. including: (a) Structural analysis & design and preparation of shop drawings for pressure equalisation or rain screen principle as required, proper drainage of water to make it watertight including checking of all the structural and functional design. (b) Providing, fabricating and supplying and fixing panels of aluminium composite panel cladding in pan shape in metalic colour of approved shades made out of 4mm thick aluminium composite panel material consisting of 3mm thick FR grade mineral core sandwiched between two Aluminium sheets (each 0.5mm thick). The aluminium composite panel cladding sheet shall be coil coated, with Kynar 500 based PVDF / Lumiflon based fluoropolymer resin coating of approved colour andn shade on face # 1 and polymer (Service) coating on face # 2 as specified using stainless steel screws, nuts, bolts, washers, cleats, weather silicone sealant, backer rods etc.
-
-
-
... More
(c) The fastening brackets of Aluminium alloy 6005 T5 / MS with Hot Dip Galvanised with serrations and serrated washers to arrest the wind load movement, fasteners, SS 316 Pins and anchor bolts of approved make in SS 316, Nylon separators to prevent bi-metallic contacts all complete required to perform as per specification and drawing The item includes cost of all material & labour component, the cost of all mock ups at site, cost of all samples of the individual components for testing in an approved laboratory, field tests on the assembled working curtain wall with aluminium composite panel cladding, cleaning and protection of the curtain wall with aluminium composite panel cladding till the handing over of the building for occupation. Base frame work for ACP cladding is payable under the relevant aluminium ble work gang saw cut (polished and machine cut) of items. The Contractor shall provide curtain wall withaluminium composite panel cladding, having all the performance characteristics all complete , as per the Architectural drawings, as per item description, as specified, as per the approved shop drawings and as directed by the Engineer-in-Charge. However, for the purpose of payment, only the actual area on the external face of the curtain wall with Aluminum Composite Panel Cladding (including width of groove) shall be measured in sqm. up to two decimal places, Columns
39.6
-
-
... More
Footbridge Bottom Girder
68.7
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements