Public Works Department Tender
... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Public Works Department - PWD Tender
Civil And Construction
Excavation
Eprocure
Opening Date24 Feb 2025
Closing Date1 Mar 2025
Tender Amount₹ 12,97,254
Costs
EMD
₹ 26,000Document Cost
₹ 500Tender Fee
Refer Documents
Summary
C/o Link Road From Jarol Society To Banaila In Gp Jarol Km 0/000 To 0/750
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWD_100517_1Tender No
PW-KMS-AB-NIT/2024-25-10358-59 dt 19.02.2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://hppwd.hp.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and laying concrete for plain/reinforced concrete in open foundations complete as per drawing and technical specification clauses 802, 803, 1202 and 1203) P.C.C nominal mix 1:5:10 (40mm aggregates) including entire carriage of materials through all modes of transportation with in all leads and lifts as per direction of the Engineer-in-Charge.
67.5
-
-
... More
Providing weapholes in brick masonry/stone masonry/plain reinforced concrete abutment, wing wall, return wall with 100mm dia PVC pipe extending through the full width of the structures with slop of 1 (v):20(H) towards drawing face complete as per drawing and technical specification clauses 614,709,1204.3.7 including entire carriage of materials through all modes of transportation with in all leads and lifts as per direction of the Engineer-in-Charge.
42
-
-
... More
Back filling behind abutment, retaining wall/breast wall including entire carriage of materials through all modes of transportation with in all leads and lifts as per direction of the Engineer-in-Charge.
9
-
-
... More
Preparation of sub grade by dressing to camber (Earth work for the cutting involved for sub-grade to be paid for separately depending upon the classification of soil completed as per HP.PWD specifications including entire carriage of materials in all leads and lifts.as per directions of the Engineer-in-Charge.
2062.5
-
-
... More
Consolidation of sub grade with road roller including making good the undulation etc. with earth or quarry soil etc. and re-rolling the sub-grade completed as per HP.PWD specifications including entire carriage of materials in all leads and lifts.as per directions of the Engineer-in-Charge.
2062.5
-
-
... More
Stone soling properly hand packed filling interstices with Kharanja stone and consolidating with power road roller to the required gradient and camber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification 150mm spread thickness (finished work including materials and labour) including entire carriage of materials in all leads and lifts.as per directions of the Engineer-in-Charge.
309.38
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements