Public Works Department Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Public Works Department - PWD Tender
Civil And Construction
Paints and Enamels
Building Construction
Eprocure
Opening Date28 Jan 2025
Closing Date4 Feb 2025
Tender Amount₹ 10,26,652
Costs
EMD
₹ 20,600Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Special Repair Of Distt. Ayurvedic Hospital Kullu (sh Painting And Distempering In Inner And Outer Side Of Building And Repair Of Plaster In Washroom Side Wall Inner And Outer Etc.).
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWD_98823_1Tender No
PW/KD/TA/2024-25-13541-50 Dated 24.01.2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://hppwd.hp.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Finishing walls with Acrylic Smooth exterior paint of required shade New work (Two or more coat applied @ 1.67 ltr/10 sqm (One point sixty seven liter/ Ten square meter) over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm (Two point twenty kilogram/ Ten square meter) with in all leads and lift of materials and as per direction of Engineer-in-charge.
1066.24
123
-
... More
Repairs to plaster of thickness 12 mm (Twelve millimeter) to 20 mm (Twenty millimeter) in patches of area 2.5 sq. meters (Two point five square meter) and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete With cement mortar 1:4 (1 cement : 4 fine sand) with in all leads and lift of materials and as per direction of Engineer-in-charge.
279.4
384
-
... More
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/ 10 sqm (Zero point ninety liter/ Ten square meter) over an under coat of primer applied @ 0.80 ltr/10 sqm (Zero point eighty liter/ Ten square meter of approved brand and manufacture with in all leads and lift of materials and as per direction of Engineer-in-charge.
332.54
111
-
... More
French sprit polishing two or more coats on new works including a coat of wood filler with in all leads and lift of materials and as per direction of Engineer-in-charge.
28.26
291
-
... More
Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm (Forty millimetre) dia M.S. tube 1.5 m (One point five metre) centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete. The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding with in all leads and lift of materials and as per direction of Engineer-in-charge.
590.51
222
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements