Public Works Department Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Public Works Department - PWD Tender

Works
Healthcare and Medicine
Eprocure
Opening Date21 Dec 2024
Closing Date30 Dec 2024
Tender Amount₹ 18,36,282 
Notes
Download

Costs

Summary

Estimate For Extension Of Mgps To Female Ward,

Description

lockUnlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

lockUnlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

lockView all details for FREE
... More
Wall outlets Vacuum (specs same as given for oxygen Outlets) within all leads & lifts & other incidential complete as per entire satisfaction of the Engineer-in-Charge. Oxygen, air and vacuum outlets HTM or NFPA compliant should be quoted along with 2 probes for Per Each out let. Both imported and indigenous outlets and probes should be quoted separately. The outlets and probes should be as specific and non- interchangeable. The gas outlets have heavy duty constituents and smooth connection and disconnection. The outlets must be labeled and color coded. Imported units should have UL Listing and Indian units must be IS/CE certified. Make Becon Medas, Dragger, Allied USA within all leads & lifts & other incidential complete as per entire satisfaction of the Engineer-in-Charge.

48

6844

328512

... More
Ward Vacuum Units ( CE Marked)- within all leads & lifts & other incidential complete as per entire satisfaction of the Engineer-in-Charge. It should comply with HTM 02-01/NFPA 99/ DIN / EN / ISO-7396-1 standards. It must consist of the following:- 1. 1 no of Suction Regulator and 1no of 1000 ml polysulfone /polycarbonate/polypropylene collection jar. 2. Suction Regulator: Suction regulator should be supplied with a safety jar, including and antibacterial filter and an anti-overflow safety device. Should have wide membrane continuous suction controller 3. Should have vacuum levels: 0-760 mm of Hg 4. Should have vacuum gauge fitted with a protective bumper device. 5. Should have on/off knob allowing for the quick restoration of a readjusted vacuum level. 6. Must have central adjustment knob with a color coded for 0 to 760 mm of Hg. Should have Polysulfone/polycarbonate 100cc safety jar, autoclavable at 121º C, unbreakable, fitted with an anti-overflow safety device and equipped with a plastic antibacterial filter. It should be totally transparent, to ensure perfect sucked liquid visibility.

48

2600

124800

... More
Wall Outlets Air within all leads & lifts & other incidential complete as per entire satisfaction of the Engineer-in-Charge.

10

6844

68440

... More
Air Outlet within all leads & lifts & other incidential complete as per entire satisfaction of the Engineer-in-Charge. Specs same as oxygen outlets

4

6844

27376

... More
Probes for Air Outlet within all leads & lifts & other incidential complete as per entire satisfaction of the Engineer-in-Charge.

14

300

4200

... More
Nitrous Outlets within all leads & lifts & other incidential complete as per entire satisfaction of the Engineer-in-Charge.

2

6844

13688

... More
Probe for Nitrous within all leads & lifts & other incidential complete as per entire satisfaction of the Engineer-in-Charge.

2

300

600

... More
Bedhead Panel with 4 gases within all leads & lifts & other incidential complete as per entire satisfaction of the Engineer-in-Charge. The system should provide a safe, efficient means of delivering services to patients/staff in general ward application. The Bed Head Panel should meet the following criteria. Ability to house medical gas terminal units and Electrical Sockets. Ease of installation via separate wall mounting plates. The system should consist of a number of aluminum extrusions joined together to form a carcass to suit the particular application. Per Each Bed Head Panels will have three extruded section compartments. One for MGPS outlets with copper pipe. One for electrical receptacles, 3/16 Amps receptacles. within all leads & lifts & other incidential complete as per entire satisfaction of the Engineer-in-Charge. Medical Grade Copper Pipeline With Tubings, Fittings, Pressure Gauges The copper pipes shall be copper annealed ASTM B/75/B68 or equivalent standards. The Diameter of the pipe should be suitable for 1000 LPM average flow and this pipeline willhave to be divided into two in the oxygen supplyplant and attached to two pipelines systems presently feeding the hospital. Grossly the diameter should not be less than 38mm X 1.5mm or thicker so as to bear pressure of 10 -12 bar All pipe work materials shall be manufactured by BS EN ISO 9001:2000 registered companies marking for sizes up to 108 mm, copper pipes shall be permanently and durably marked at regular intervals along its length with the following information The harmonised standard number EN 13348; Lloyds/BSI Kitemark or equivalent approved to EN 13348:2008 Nominal dimensions, diameter x wall thickness; Temper designation to EN 1173; Manufacturer's identification; Brazing shall be carried out flame source, temperatures and materials as per HTM/ NFPA recommendations Date of production: year and month (1 to 12) Confirmation of degreasing for oxygen Brazing shall be carried out flame source, temperatures and materials as per HTM/ NFPA recommendations Brazed Pipeline Joints (Copper to copper) should be made using a silver-copper-phosphorous brazing alloy CP104 (5% Silver Brazing Filler metals Rod) to BS EN 1044-1999, no flux to be used. Copper Fittings: Medical Gas Pipeline Fittings shall be end feed type, manufactured from the same grade of copper as the pipes and be in accordance with the requirements of BS EN 1254-1:1998 Part 1. The manufacturing company should comply with BS EN ISO 9001:2000 and should be Kite Marked/Lyods or equivalent to EN 1254-1 (up to 54mm). Fittings should be factory degreased suitable for oxygen use and be supplied individually sealed in protective polythene bags. Fittings should be certified for medical useand accompany with oil analysis certificate and conformity certificate indicating suitability for medical use. Protection for pipes The pipelines in the bare area like space between buildings should be suitably protected and covered with fire resistant/ retardant insulation in such a manner that inner copper pipe does not come in contact with outer GI pipe. High Quality GI pipe quality covers which should be welded in such a way that only authorized person can open it using proper tools only. Further these should be of such a material and supported in such a manner so as to take load of monkeys/ langooRs. Any such supports required should be quoted in the technical bid in the civil work. Uncovered Sections of GI pipe will have to be protected with weather resistant stainless steel barbed wire. The pipeline should be suitable for tolerating temperatures of (–) 10oC to (+) 30oC and high ambient humidity exceeding 90% and ice formation during winteRs. Given the length of the pipeline and climatic conditions, provision for expansion and shrinkage of metal should be incorporated. All end connections, pressure gauges, valves and fittings of cascade shall be within tamper proof,see through and wire cage enclosure. These shall be on one side of cascade frame for ease of operation. Parts of the pipe between the building blocks may have to be supported with columns/ beams of iron angle or concrete if necessary, which will have to be done by the firm laying down the pipeline. The copper tube used for venting (if any) shall be of ASTM B75, B68. Sizes of pipeline with above specification to be used.

2

26420

52840

... More
O.D. 22mm x 0.9mm thick within all leads & lifts & other incidential complete as per entire satisfaction of the Engineer-in-Charge.

262

1522

398764

... More
O.D. 15mm x 0.9mm thick within all leads & lifts & other incidential complete as per entire satisfaction of the Engineer-in-Charge.

260

1416

368160

... More
O.D. 12mm x 0.7 mm Thick within all leads & lifts & other incidential complete as per entire satisfaction of the Engineer-in-Charge.

80

1121

89680



Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.