Public Works Department Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Public Works Department - PWD Tender

Works
Civil And Construction
Eprocure
Opening Date15 Jan 2025
Closing Date23 Jan 2025
Tender Amount₹ 12,48,088 
Notes
Download

Costs

Summary

Restoration Of Rain Damages At Mdr Under Shimla Division No. Iii (sh Construction Of Rad Side R/wall At Rd/ 0/068 To 0/090 Near Isbt Bifurcation Under Sub-division No. Vii Winter-filed Shimla

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying cement concrete 1:4:8 (1cement :4sand :8 graded stone aggregate 40mm nominal size) mechanically mixed and vibrated for compacting concrete and curing complete excluding cost of centring and shuttering including carriage of materials in all leads and lifts in foundation and plinth.

69.75

4300

299925

... More
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand) including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.

128.06

4200

537852

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

23.44

3800

89072

... More
Providing and laying weapholes in brick masonry /stone masonry /plain reinforced concrete abutment, wing wall return wall with 100mm (one hundred )milimetredia PVC pipe extending through the full with of the structures with slop of 1(v);20 (H) towards drawing face complete as per drawings and technical specifications MORD clause 614,,709,1204.3.7 including hauling of materials in all leads and lifts as per the same satisfaction and direction of Engineer-In-Charge.

147

150

22050

... More
Disposal of excavated earth by Mechanical means on approved dumping site of M.C. Shimla or on arranged by the contractor. i.e. through all mode of transportation including head load animal load or mechanical means alongwith transportation of the unuseful material for disposing including payment of prescribed charges of dumping to the owener of dumping site through all modes of transporation including head load animal load or mechanical means alongwith its levelling, fine dressing and to complete the work by mechanized means and labour(if any required) All useful materials such as stones, aggregate and slates shall be sorted out and stacked along roads side any loss of the public/private property during the courses of execution shall be the absolute responsibility of the contractor which shall have to be dully compensated by him in all respect as per direction of Engineer-in-Charge .

143.52

750

107640



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.