Public Works Department Tender

... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Public Works Department - PWD Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date2 Nov 2023
Closing Date9 Nov 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Construction Of Rain Shelter In Spiti Valley Distt Lahaul Spiti Hp

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand): 10 graded stone aggregate 40 mm nominal size) per H.P.PWD.specification of 1990 (One thousand Nine hundred Ninety) Volume-I i/c carriage of material, labour , tool and plant thyough all modes of transportation with in all leads and lifts and as perdirection of Engineer-In-Charge.

0.9

6277

5649.55

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) per H.P.PWD.specification of 1990 (One thousand Nine hundred Ninety) Volume-I i/c carriage of material, labour , tool and plant thyough all modes of transportation with in all leads and lifts and as perdirection of Engineer-In-Charge.

0.97

11228

10891.16

... More
Reinforced cement concrete work in beams, suspended floors ,roofs,having slope up to 15 degree landing ,balconies, shelves, chhajas, lintals, bends, plain window ,sills, stair cases and spiral stairs cases above plinth level up to floor five level excluding the cost of centrin shuttering finishing and reinforcement with 1:1.5:3 ( One cement 1.5 Corsed sand :three gradede stone aggregate 20 mm nominal size, per H.P.PWD.specification of 1990 (One thousand Nine hundred Ninety) Volume-I i/c carriage of material, labour , tool and plant thyough all modes of transportation with in all leads and lifts and as perdirection of Engineer-In-Charge.

1.5

11916

17875.2

... More
Steel reinforcement for R.C.C. work including straightening,cutting,bending, placing in position and binding all complete upto plinth level.. within all leads and lift including carriage of materials and as per direction of Engineer-in- charge.as per HP.PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour equipment and material to various locations through all modes of transportation in all leads and lifts, including all incidental charges.

337.9

110

37337.95

... More
Boulder filling tightly dry hand packed under floor including watering, ramming, consolidating etc . as per HP.PWD specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour equipment and material to various location through all modes of transportation in all leads and lifts, including all incidental charges.

2.54

1606

4080.48

... More
Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste from approved manufacturer in superstructure above plinth level up to floor V level etc. all complete as per the direction of Engineer-in- charge.Cement mortar 1:6 (1 cement : 6 coarse sand)within all leads and lift including carriage of materials and as per direction of Engineer-in- charge

4.94

6180

30530.78

... More
15 mm cement plaster on rough side of single or half brick wall of mix: 1:4 (1 cement: 4 coarse sand) as per HP.PWD specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour equipment and material to various location through all modes of transportation in all leads and lifts, including all incidental charges in all floors heights and levels.

25.9

321

8318.3

... More
Finishing walls with Acrylic Smooth exterior paint of required shade New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) per H.P.PWD.specification of 1990 (One thousand Nine hundred Ninety) Volume-I i/c carriage of material, labour , tool and plant thyough all modes of transportation with in all leads and lifts and as perdirection of Engineer-In-Charge.

25.9

164

4258.74

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering in all work up to plinth level. 1:3:6(One cement : Three sand : Six graded stone aggregate 20 mm nominal size ) within all leads and lift including carriage of materials and as per direction of Engineer-in- charge.

1.9

9286

17645.07

... More
Structural steel work riveted bolted or welded in built up section trusses and framed work including cutting hoistion fixing in position and applying a proming coat of approved steel primer all complete.

2401.64

135

326142.71

... More
Providing and fixing 0.60 mm thick pre- painted steel sheet in roofing with hot dipped metallic zinc coated sheet with top coat of regular modified poly ster organic coating of 20 microns over 5 micron primer coating to back coat of polyester of 5 mivrons over 5 micron primer coating including fixing with pre-painted iron Jor L hooks, bolts and nuts 6 mm dia meter with pre-painted limpet and rubber washers complete with all accessories as per HP,PWD specification 1990 Volume -I, including carriage of all labour equipment and materials to various location through all modes of teanspirtation in all leads and lifts including all incidental charges.

48.53

2114

102613.29

... More
Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 25 mm thick as per direction of Engineer-in-charge. All works upto plinth level. within all leads and lift including carriage of materials and as per direction of Engineer-in- charge. per H.P.PWD.specification of 1990 (One thousand Nine hundred Ninety) Volume-I i/c carriage of material, labour , tool and plant thyough all modes of transportation with in all leads and lifts and as perdirection of Engineer-In-Charge.

30.48

2986

91020.6

... More
Providing and fixing M.S. BP Sheet 1.66mm to 2mm thick in eaves board/facia/soffits/ceiling including cutting, fixing and welding to steel roof members and applying a coat of red lead primer complete as per the instruction of Engineer-in-charge (Base members of steel work shall be measured & paid separtely) per H.P.PWD.specification of 1990 (One thousand Nine hundred Ninety) Volume-I i/c carriage of material, labour , tool and plant thyough all modes of transportation with in all leads and lifts and as perdirection of Engineer-In-Charge.

4.06

2031

8246.51



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.