Public Works Department Tender
... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Public Works Department - PWD Tender
Civil And Construction
Building Construction
Eprocure
Opening Date16 Jan 2025
Closing Date22 Jan 2025
Tender Amount₹ 7,22,158
Costs
EMD
₹ 14,500Document Cost
₹ 350Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWD_98095_2Bid Award Id
ViewTender No
PW-KD-E-Tender/2024-25-6765-68 dated 08-01-2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://hppwd.hp.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
(c) Colums. Pillars, posts and struts upto floor two level
1.08
7633
8243.86
... More
Providing Tor steel reinforcement for R.C.C work including bending binding and placing in position complete upto floor two level (b) Tor steel including all leads and lifts, as per HP PWD, specification of 1990 Volume-i, as directed by the Engineer-in-Charge
172.8
76
13279.68
... More
Brick work using common burnt clay building brisk in all height in cement mortar 1.6 (1cement: 6 sand) in superstructure above plinth level upto floor two level, 2nd class bricks) including all leads and lifts, as per HP:PWD, specification of 1990 Volume-1, al in all leads and lifts as per the entire satisfaction and direction of the including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
10.12
6164
62379.68
... More
Providing and fixing 0.60mm thick prepainted steel sheet in rooling with hot dipped metallie zine coated sheet with top coat of regular modified polyster (RNP) organic coating of 20 microns over 5 microns primercoating to back coat of polyster of 5 microns over 5 microns primercoating i/c fixing with prepainted iron J or L. hooks, bolts and nuts 6mm dia metre with prepainted limpet and rubber washers complete with allaccesoriees as required as per the direction of Engineer-in-charge.
268
837
224396.4
... More
Steel work welded in built up sections.trusses and framed work including cutting hoisting, fixing in position and applying a priming coat of red lead paint.including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
-
-
-
... More
In gratings framed guard bars.ladders.railling.brackets and similar works.
26.12
10745
280659.4
... More
Providing and fixing moulded hand rail of M.S. hollow pipe 50mm dia welded in straight lenght over M.S. flat at top of vertical balusters including one coat of red oxide priming coat complete (M.S. flat & balusters of railings shall be mesaured & paid separetely. including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
193.5
123
23897.25
... More
Painting two costs (excluding priming cost on new steel and other metal surfaces eith enamel paint brushin to give an even shade including eleaning the surface of all dirt,dust and other foregin matters. Enamel paint other than white including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
58.05
89
5218.7
... More
Applying Birla white wall care putty over plaster surface after thoroughly brushing the surface free from mortar drops, dust, loose materials and other foreign matters sand papered smooth to give final matter finish to the surface complete. including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
215.1
85
18305.01
... More
Finishing wall with weather proof exterior grade emulsion of approved design Spectrum Quartz king brush paintor its equarlied on undecorated wall surfaces (twocoats) to give an even shade and final finish after throughly cleaning thesurface to remove all dirt, dust and other foreign matter etc includingsand paper smooth complete. including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
215.1
61
13164.12
... More
15mm Cement plaster in singlecoat on the rough side ofbrick/ concrete/stone wallsfor interior plastering uptofloor two level includingarrises, internal roundedangles,chamfers and/or roundedangles not exceeding 80mm ingirth and finished even andsmooth Cement Mortar 1:6 (1Cement:6 Sand). including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
263
196
51666.35
... More
15mm cement plaster in singlecoat on fair side of brick/concrete/stone walls forinterior plastering upto floortwo level includingarrises, internal roundedangles,chamfers and/or roundedangles not exceeding 80mm ingirth and finished even andsmooth Cement Mortar 1:6 (1 cement:6 sand). including hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge.
88
185
16315.2
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements