Public Works Department Tender
... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date8 Jul 2022
Closing Date16 Jul 2022
Tender Amount₹ 9,42,261
Costs
EMD
₹ 19,000Document Cost
₹ 350Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_PWD_62550_1Bid Award Id
ViewTender No
TENDER NOTICE NO 1568-77DATED 29.6.2022Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://hppwd.hp.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing laying, spreading by manual/mechanically means and compacting to 75mm (seventy five millimeter) compacted thickness, stone aggregates of Grading-III, 53mm to 22.4mm (fifty three to twenty two point four millimetre) size to water bound macadam specification including spreading in uniform thickness, using template, hand packing motor grader, rolling with three wheeled roller 80-100 (eighty to hundred) kN static weight in stages to proper grade and camber including applying and brooming stone screening type-B of size 11.2mm (eleven point two millimetre) nominal size at the rate of 0.18cum (zero point one eight cubic metre) per ten square metre of road surface to fill up the interstices of coarse aggregate, watering and compacting to the required density for grading-III as per MORD Technical specification clause 405 and as per entire satisfaction and direction of Engineer-in-Charge including carriage of materials with in all leads, lifts and other incidentals. The rate is including Royality, Malkhana, Octroi, toll tax, sale tax, GST or any other taxes imposed by the Government.
21.62
-
-
... More
Providing and applying primer coat with bitumen emulsion (SS-I) on prepared surface of granular base including cleaning of road surface with hydraulic brooms and spraying primer with bitumen emulsion pressure distributor at the rate of 0.85 kg (zero point eight five kilogramme) per square meter of road surface as per MORD Technical specification clause 502 as per the entire satisfaction and direction of Engineer-in-Charge including carriage of materials with in all leads, lifts and other incidentals. The rates including Royality, Malkhana, Octroi, GST, toll tax, sales tax or any other taxes imposed by the Government.
288.22
-
-
... More
Providing and applying tack coat with bitumen emulsion RS-I, including cleaning the road surface with hydraulic brooms and spraying with emulsion pressure distributor at the rate 0.275 kg (zero point two seven five kilogramme) per square meter on the prepared granular surface treated with primer complete as per MORD Technical specification clause 503, and as per the entire satisfaction and direction of Engineer-in-Charge including carriage of materials with in all leads, lifts and other incidentals. The rates including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
288.22
-
-
... More
Providing, laying and rolling of open graded premix carpet of 20mm (twenty millimeter) compacted thickness, composed of type-A 13.2mm to 5.6mm (thirteen point two millimeter to five point six millimeter) aggregates at the rate of 0.27 cum (zero point two seven cubic meter) premixed with bitumen binder Viscosity grade -Ten (VG-10(Ten) bitumen, at the rate of 14.6 kgs (fourteen point six kilogram) per 10 (ten) square meter of road surface, to the required line, grade and level to serve as wearing coarse on a previously prepared base including mixing and heating binder and aggregate in hot mix plant of 30/40 (thirty/forty) tonne per hour capacity transporting mixed materials with tipper and laying with paver finisher hydrostatic with sensor attachment and rolling with three wheeled 80-100 (eighty to hundred) kN static roller finished to required level and grades to be followed by seal coat of type-B complete as per MORD Technical specification clause 508 and as per the entire satisfaction and direction of Engineer-in-Charge excluding the cost of tack coat and seal coat but including carriage of materials with in all leads, lifts and other incidentals. The rates including Royality, Malkhana, Octroi, toll tax, sale tax, GST or any other taxes imposed by the Government.
288.22
-
-
... More
Providing and laying seal coat for sealing the voids in a bituminous surface laid to the specified levels, grade and cross falls using Type-B as per technical specification clause 510 using bitumen VG-10 (viscosity grade-ten) at the rate of 6.80kg (six point eight zero kilogramme) premixed with 0.06 (zero point zero six) cubic meter of fine aggregate per 10 Sqm. (Ten square meter) of road surface heated in mini hot mix plant and laying manually of mixed material and rolling with power road roller 80-100 (eighty to hundred) kN static roller, as per the entire satisfaction and direction of Engineer-in-Charge including carriage of materials with in all leads, lifts and other incidentals. The rates including Royality, Malkhana, Octroi, toll tax, sale tax, GST or any other taxes imposed by the Government.
288.22
-
-
... More
Earth work in excavation in foundation for all types of structures such as retaining walls, breast walls, culverts, drains, parapets and other similar structures in all kinds and classification of soil, including saturated soil comprising of ordinary mix soil, ordinary rock, hard rock, chiseling/ wedging out rocks (where blasting is prohibited) complete in accordance with the lines and dimensions shown on the drawings, including setting out, construction of shoring, bracing, removal of stumps and other deleterious materials and disposal of excavated material upto any leads and lifts including dressing of sides and bottom and obstructions necessary for placing the foundations, trimming, leveling ramming and watering bottom of excavation and backfilling in trenches with excavated suitable approved materials to the original surface in layers not exceeding 15cm (fifteen centimeter) compacted thickness including shoring and strutting and pumping or bailing out water (surface and sub-soil water) up to any depth and any quantum of water and cleaning of slush which may arise out during dewatering complete as per drawing and MORD Technical Specification clause 305.1 and as per the direction and the entire satisfaction of Engineer-in-Charge including carriage of material within all leads, lifts and other incidentals.
228.9
-
-
... More
Providing and laying mechanically mixed and vibrated cement concrete 1:4:8 (one cement isto four sand isto eight graded crushed stone aggregate 40mm (forty millimeter) nominal size) for plain cement concrete, in or under water in open foundation for all types of structures, including pumping or bailing out water/ dewatering (surface/sub-soil water) and including removal of slush which may arise at the time of laying under water for all heights/depth and any quantum of water including cost of form work and curing complete as per drawing and MORD technical specification 802, 803, 1202 & 1203 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of material with in all leads lifts and other incidentals. The rates including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
2.57
-
-
... More
Providing and laying mechanically mixed and vibrated concrete for plain cement concrete Grade M-15 (M-Fifteen) Nominal mix 1:2½:5 (one cement isto two and half sand isto five graded crushed stone aggregate (40mm) forty millimeter nominal size) in open foundation or under water, including pumping or bailing out water/ dewatering (surface and sub-soil water) and removal of the slush which may arise at the time of laying under water, for all heights/depths and any quantum of water, in open foundation etcetera including cost of form work and curing complete as per MORD technical specification section 800, 900 & 1200 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
16.09
-
-
... More
Providing and laying mechanically mixed and vibrated concrete for plain cement concrete Grade-M20 (M-Twenty) Nominal mix 1:2:4 (one cement isto two sand isto four graded crushed stone aggregate (40mm) forty millimeter nominal size) in or under water in open foundation for all types of structure and the like in Catchpit flooring etcetera, including cost of form work and curing complete as per drawing and MORD technical specification section 800, 900 & 1200 and as per the direction and the entire satisfaction of Engineer-in-Charge, including pumping or bailing out water/dewatering (surface and sub-soil water) and removal of the slush which may arise at the time of laying under water for all heights/depths and any quantum of water complete including carriage of materials up to all leads, lifts and other incidentals. The rates including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
0.22
-
-
... More
Providing and laying (to level or slope) 900mm dia (Nine hundred millimeter) diametre reinforced cement concrete light duty non pressure pipes IS Class NP-2 for culverts on first class bedding or granular material in single row including fixing collar with cement mortar 1:2 (One cement isto two sand) but excluding the cost of excavation, protection works, back filling, pipe bedding concrete and masonry work in head walls and parapets as per drawing and M.O.R.D. technical specifications clause 1101.5 and as per direction of Engineer-in-Charge including carriage of materials within all leads and lifts and other incidental. The rate including octroi, royality, Malkana, GST, toll tax, sale tax or other taxes imposed by the Government.
7.5
-
-
... More
Providing and laying mechanically mixed and vibrated concrete for plain-cement concrete, nominal mix 1:3:6 (one cement isto three sand isto six graded crushed stone aggregate 20mm (twenty millimeters) nominal size) in or under water in open foundations for all Type of structure, such as Drains and the like including pumping or bailing out water/ dewatering removal of the slush which may arise at the time of laying concrete, for all heights/depths, including cost of form work complete as per drawing and MORD technical specification sectione 800, 900 and 1200 or as directed by Engineer-in-Charge, including carriage of materials with in all leads, lifts and other incidentals. The rate is including Royality, Malkana, Octroi, toll tax, GST or any other taxes imposed by the Government.
30.4
-
-
... More
Excavation for road way in hilly areas in all heights and depths and in all kinds of soil by manual/ mechanical means, including saturated soil comprising of ordinary soil, ordinary rock, soft rock, hard rock chiseling wedging out of rock (where blasting is prohibited) and their intermediate classification of soil complete including setting out true to the required lines grades, width, cutting and trimming of side slopes, camber, super elevation and levels shown as per the drawings and as directed by the Engineer-in Charge complete in according to MORD Technical Specification section 300 & 1600 and sorting out and stacking of useful materials with in all leads and lifts of material in acquired road width and transporting of un-useful materials for filling in road ways, camber, embankments for grade improvements and disposal of all surplus materials to the approved dumping sites through all modes of transportation including head load or animal transport or by mechanical means including leveling, fine dressing and carriage of machineries, materials, tools, equipments and safety measures and other incidentals necessary to complete the work by mechanical means and labour if required. RThe rate is including Octroi, Royality, Malkana, toll tax, GST or any other taxes imposed by the Government.
127.01
-
-
... More
Providing and laying mechanically mixed and vibrated cement concrete nominal mix 1:5:10 (one cement isto five sand isto ten graded crushed stone aggregate 40mm (forty millimeter) nominal size) for plain cement concrete in all heights/depths, in or under water, including pumping or bailing out water/dewatering (surface and sub-soil water) and removal of the slush which may arise at the time of laying under water, for all heights/depths and any quantum of water, including cost of form work and curing complete in all type of structures like Retaining Walls & Breast Walls etcetera complete. , as per drawing and MORD technical specification clause 802, 803, 1202 & 1203 and as per the direction and the entire satisfaction of Engineer-in-Charge, including carriage of materials up to all leads, lifts and other incidentals. The rate is including Octroi, Royality, Malkhana, toll tax, sale tax, GST or any other taxes imposed by the Government.
134.07
-
-
... More
Providing and laying 100mm (one Hundred millimeter) dia ISI marked P.V.C. pipe Weep Holes in brick masonry/stone masonry plain/ reinforcement concrete abutments, wing wall/ return wall, retaining walls and breast walls, extending through the full width of the structure with slope of 1(V): 20H (One vertical isto twenty Horizontal) towards drawing face complete as per drawing and MORD technical specification clause 614,709,1204.3.7 and as per the direction and entire satisfaction of Engineer-in-Charge complete, including carriage of materials with in all leads, lifts and other incidentals. The rates including Royality, Malkhana, Octroi, GST, toll tax, sale tax or any other taxes imposed by the Government.
35
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements