Public Works Department Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Public Works Department - PWD Tender
Civil And Construction
Agriculture or Forestry Works
Eprocure
Opening Date21 Jan 2025
Closing Soon27 Jan 2025
Tender Amount₹ 19,04,326
Costs
EMD
₹ 36,500Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Landscaping And Gardening Operation Near Dhararsani Bridge Bilaspur.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWD_98467_1Tender No
PW-BLP1-CB-/24-15975-16015 dt 17.1.25Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://hppwd.hp.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
3308.34
95
314292
... More
Providing and fixing expanded metal 20x60 mm strands 3.25 mm wide and 1.6 mm thick for windows etc. with approved steel primer all complete. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
216
808
174528
... More
Painting with synthetic enamel paint of approved brand and manufacture togive an even shade Two or more coats on new work,Two or more coats on new work. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
432
123
53460
... More
Supplying and stacking of good earth at site i/c royalty and carriage up to 5 km Lead complete (earth measured in stack will be reduced by 20 % for payment). including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. For lawn developmemt @ 2/3rd of total excavated earth
316.8
277
87754
... More
carriage of good earth
316.8
132
42027
... More
vermicompost for lawn area and for Plant
410
20
8200
... More
Supply and stacking at site of work clean sharp sand as per HPPWD specification free from dirt, dust and other organic material i/c stacking at road side clear of formation width uniformly distributed along road side improper stacks. The stacks should be on even ground i/c carriage of materials in all leads and lifts as per direction of eng - in-charge i).Clean coarse sharp soil Quantity= 1/3*(excavated earth). including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
158
1350
213300
... More
carriage of course sand
158
106
16769
... More
Rough dressing of the ground
1600
1
2080
... More
Fine dressing of the ground
1600
3
5216
... More
Plantation of tree , shurb and hedge at site i/c/watering and removal of unserviceable material 's as per direction of officer in charge (excluding cost of plant and water). including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. Golden Duranta (hedge)
2000
26
52000
... More
Iresine (hedge)
1000
20
20000
... More
chandni
500
50
25000
... More
Boxwood (hedge)
500
55
27500
... More
aralia plant
50
70
3500
... More
cactus different spesies
50
80
4000
... More
Topairy elephant
2
8000
16000
... More
Topairy of different Shape
8
5000
40000
... More
Providing and Laying of Slection 1turf ( lawn) with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same maintenance for 30 days or more till the grass establish properly,as per direction of officer in charge including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
1600
217
347200
... More
Providing and stacking plants of appropriate species and size, plants shall be well developed, healthy and attractive as per the directions of Engineer in charge. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. Fox tail (15-20ft HT)
40
2000
80000
... More
Bougainvillea hybrid (2-3 ft with different colour )
100
250
25000
... More
Digging hole in ordinary soil and refilling the same with the excavated earth mixed with manure or slufge in tyeh ratio of 2:1 by volume (2 part of stacked volume of earth after reduction by 20 % :1 part of stacked volume of manure after reduction by 8% ) flooding with water , dressing including removal of rubbish and surplus earth , if any , with all leads and lift ( cost of manure sludge or extra ggod earth if needed to be paid for separtely). including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. Hole 45 cm dia and 45 cm deep
40
18
732
... More
Hole 15 cm dia and 15 cm deep
5000
2
14500
... More
I Love Dev Bumi Himachal alphabet with size of 24-36 inch with installation
1
100000
100000
... More
Dustbin with stand size of 3ft -5ft
3
4000
12000
... More
Maintenance of lawn area for 90 days
4800
20
96480
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%