NHPC Limited Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
NHPC Limited - NHPC Tender
Civil And Construction
Civil Works Others
Electrical and Electronics
Pipe Line Project
Electrical Works
Eprocure
Opening Date11 Mar 2024
Closing Date15 Apr 2024
Tender Amount₹ 23,70,251
Costs
EMD
₹ 47,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NHPC_799772_1Bid Award Id
ViewTender No
NH/PP-II/PnC/Pkg. No. C-746/2024Tender Authority
NHPC Limited ViewPurchaser Address
-Website
http://eprocure.gov.inPackage Tenders
NH/PP-II/PnC/Pkg.No.C-645/2022NH/PP-II/PnC/Pkg.NoC-644/2022NH/PP-II/PnC/Pkg. No. C-639A/2022...more
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
NIT for the work of Repair work of 11 KV HT line of Panch and construction of new 11 KV line of Hurla site of Parbati H.E. Project (Stage-II), (Package No-C-746
E-Tender for Repair work of 11 KV HT line of Panch and construction of new 11 KV line of Hurla site of Parbati H.E. Project (Stage-II), (Package No-C-746)
BOQ Items
Run Thro' Structures ( Formation): on Single Pole Structures Run-through Structures per Km)
-
-
-
Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/c tolerance of 100 mm either side).
6
-
-
Angle Iron (50x50x6 mm), Length: 750 mm x 2 No.
12
-
-
Pole Top Bracket [MSCI: 100x50x6 mm- 100 mm].
6
-
-
11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure.
18
-
-
Dead End Structures: (Double Pole (Prefer along road side).
-
-
-
Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No.
12
-
-
X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No.
12
-
-
X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length: 2340 mm x 2 No.] ∆ Formation.
12
-
-
Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides).
30
-
-
11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure.
15
-
-
HT Stay / Guy Arrangement.
-
-
-
Stay set complete in all respect (2No. / Single Pole , 5 No. / Double Pole Structures).
37
-
-
Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set).
370
-
-
Earthing.
-
-
-
HT Earthing set complete
6
-
-
Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m.
110.03
-
-
Cross Lacings (GI, 8 SWG) [2.2 m x 9 Nos @ 2 m spacing] {0.102 kg/m}.
26.37
-
-
Eye Hook for earth wire.
13
-
-
Earth Wire Clamp.
13
-
-
MS Angle Iron: 50x50x6, Length : 2800 mm for Road crossing.
7
-
-
Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro' structure: 2 No ].
34
-
-
Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro' structure: 2 No].
34
-
-
Danger Plate (250X200X1.6 mm).
11
-
-
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] @2.5kg per pole.
42.5
-
-
Barbed Wire @2.5 kg per pole.
42.5
-
-
Red Oxide @ 1.5L per pole.
25.5
-
-
Aluminium Paint @ 1.5L per pole.
25.5
-
-
Supply of materials for 0.4 KV LT line at Hurla.
-
-
-
ACSR Dog conductor (6/1/4.72) Sagging, jumpering & wastage @ 10 % (4 lengths per span) m.
0.7
-
-
Steel Tubular Poles (9 m, Working Load 200 kgf/m²) (with Ruling Span 67 m).
4
-
-
Muffs with concerete filling.
4
-
-
Angle Iron (75x75x6) [Length- 1.50 Mtr + 0.2 Mtr].
4
-
-
Shackle Insulator (16 kN).
16
-
-
D-Iron (U- Clamps).
16
-
-
Earth Knob.
4
-
-
LT Stay Set.
8
-
-
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set).
24
-
-
Kit Kat I.C.
12
-
-
Full Clamps [ 2 No for A.I + 1 No for Stay Set].
12
-
-
Earthing Set complete.
2
-
-
Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m.
16.48
-
-
Spool Tie.
16
-
-
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably16 mm Φ or more (with flat and spring washers)] @2.5 kg per pole.
10
-
-
Aluminium Paint @ 1.5L per pole.
6
-
-
Red Oxide @ 1.5L per pole.
6
-
-
PVC spacer.
3
-
-
Supply of materials for DTR structure.
-
-
-
Distribution Transformer (Ordinary), 11/0.4 kV, 250 KVA
2
-
-
Steel Tubular Poles (9 m, Working Load 200 kgf/m²)
4
-
-
Muffs with concerete filling
4
-
-
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incommer line
4
-
-
MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA's
2
-
-
X-Arm: [Channel Iron (75x40x6 mm), Length : (2800mm) X 4 Nos] for supporting DO fuse unit & GO switch
8
-
-
Transformer Bed, Belting & Knee Bracing.
-
-
-
Transformer Bed ( Civil Work.)
2
-
-
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed.
4
-
-
X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting Main Channel of Transformer].
4
-
-
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos.
4
-
-
MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos.
4
-
-
MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing.
4
-
-
Transformer LT Distribution Box and GO Switch fixing Assembly
-
-
-
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
4
-
-
MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
2
-
-
GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm
2
-
-
GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
2
-
-
D.O Fuse Unit
2
-
-
Surge Arrester, 9 kV Station Class (Porcelain Type)
6
-
-
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
6
-
-
Stay set complete
8
-
-
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
48
-
-
Pipe Earthing Set
6
-
-
LT panel MS Sheet of 1.6 mm ( 1100x800x275 mm ) cubide Box complete with stand etc and Al Busbar 40x6 mm inside .painted /powder coated after primar coatingMCCB 400 amp 3P 50kA -1 No. ICS 100 % ICU & MCCB 150 Amp iP, 100 kA =9 nos
2
-
-
Half Clamp (M.S. Flat 50X6 mm)
34
-
-
Full Clamps (M.S. Flat 50X6 mm)
18
-
-
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
54
-
-
Aluminium Thimble
32
-
-
Aluminium Thimble
8
-
-
Danger Plate
2
-
-
Barbed Wire
30
-
-
Chain Link fencing , Angle Iron ,Gate etc for transformer fencing
2
-
-
LT Cable (3.5 Core) 400 mm² X 2 incommer
56
-
-
LT Cable (3.5 Core) 70 mm² X 6 Outgoing
180
-
-
HT 11 KV Cable 3 X 95 sqmm
0.04
-
-
Cable termination kit, 11 KV, 3 X 95 sqmm
4
-
-
Energy Meter (3-Phase, 4-Wire) DLMS compliant 400 A CT Type for 250 KVA Transformer
2
-
-
Aluminium Paint.
8
-
-
Red oxide.
6
-
-
Erection cost of DTR for Hurla and Pancha.
2
-
-
Erection of 11 KV line for Hurla and Pancha.
-
-
-
Survey of line
0.83
-
-
Erection Of Single Pole HT line (11 KV) with all accessories comprising of cross arm, insulators, barbed wire, painting etc.
3
-
-
Erection Of Double Pole (11 KV)
3
-
-
Erection Of Stay Set
37
-
-
Erection Earthing
6
-
-
Erection GI Earth Wire
1.34
-
-
Fixing Of Jumper
18
-
-
Erection Of ACSR 100 mm² (Dog)
2.72
-
-
Erection of LT line (.4 KV) at Hurla.
-
-
-
Survey of line
0.16
-
-
Erection Of Single Pole with all accessories comprising of cross arm, insulators, barbed wire, painting etc.
4
-
-
Erection Of Stay Set
8
-
-
Erection Of Earthing
2
-
-
Erection Of GI Wire
0.16
-
-
Erection Of ACSR 100 mm²(Dog)
0.7
-
-
Concrete required in erection of poles and stay set.
-
-
-
Concrete 1:3:6 (1 Cement: 3Coarse sand ) : 6 graded stone aggregate 40 mm nominal size) required in erection of poles and stay set as per HPSOR 2020 Item No 4.1.6.
15.5
-
-