Integrated Development Project Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Integrated Development Project - IDP Tender
Civil And Construction
Building Construction
Eprocure
Opening Date8 Oct 2024
Closing Date22 Oct 2024
Tender Amount₹ 5,19,600
Costs
EMD
₹ 15,000Document Cost
₹ 500Tender Fee
Refer Documents
Summary
C/o Makowal Type Structure ( Pws ) At Chaknali Nallah In Gp- Madhana For The Year 2024-25 Under Apo Unit Nerwa
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CPD1_94038_1Bid Award Id
ViewTender No
PWS/004/24-25Tender Authority
Integrated Development Project ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
P/L cement Concrete 1:4:8 (1 cement:4 Sand:8 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth carriage of material in all lead and lifts
6.69
-
-
... More
Providing and laying in position specified grade of reinforced cement Concrete work 1:1.5.3 ( 1 : cement: 1.5 Sand: 3 graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work in foundation and plinth carriage of material in all lead and lifts
16.91
-
-
... More
Providing steel reinforcement for RCC work including straightening , cutting , bending, placing in position and binding all complete upto plinth & above level carriage of material in all lead and lifts Mild / Tor steel I S I and Medium Tensile steel bars (TMT)
525.26
-
-
... More
P/L cement Concrete 1:3:6 (1 cement :3 Sand :6 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth carriage of material in all lead and lifts
6.11
-
-
... More
P/L cement Concrete 1:5:10 (1 cement:5 Sand:10 graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth carriage of material in all lead and lifts
2.4
-
-
... More
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 ( 1 cement :6 coarse sand :12 graded stone aggregate 20 mm nominal size ) upto plinth level with carriage of material in all lead and lifts Cement mortor 1:6 ( 1cement : 6 coarse sand )
3.54
-
-
... More
P/F work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including sentring, shuttering , strutting and propping etc. with wooden battens and ballis, height of propping and sentring below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for insitu-reinforced concret and plain concret work in: vertical surfaces such as walls (any thickness) partitions and the like including attached pillaster buttresses, plinth and string cources and the like
34.99
-
-
... More
Suspended floors, roofs, landing and their support balconnies and access platform etc.
1.5
-
-
... More
cement concrete flooring 1:2:4 (1cement :2 coarse sand :4 graded stone aggregate ) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete carriage of material in all lead and lifts 40mm thick with 20mm nominal size stone aggregate
1.5
-
-
... More
Supplying , filling , levelling gravels, for filter boulder , sand , stone aggregate in required thickness, for all lead and lifts complete as per direction of engineer-in charge
8.14
-
-
... More
Smooth finishing of the exposed surface of RCC work with 6 mm thick cement mortar 1:3 (1cement :3 sand ) carriage of material in all lead and lifts
26.65
-
-
... More
Providing and fixing of GI pipe ISI 50 mm dia in all respect complete carriage of material in all lead and lifts
6
-
-
... More
P/F of MS wheel valve 50 mm dia ISI with reducer, nipples etc. in all respect complete carriage of material in all lead and lifts
1
-
-
... More
Providing and fixing of sign board angle iron frames, welded M.S sheet, with painting and writting etc.in all respect complete.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements