Integrated Development Project Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Integrated Development Project - IDP Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date31 Dec 2024
Closing Date13 Jan 2025
Tender Amount₹ 9,48,000
Costs
EMD
₹ 15,000Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Construction Of Steel Trussed Foot Bridge At Gigdha Khud In G.p. Kanti Mashwa
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CPD1_97252_1Bid Award Id
ViewTender No
P-1/Foot Bridge/24-25Tender Authority
Integrated Development Project ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying cement concrete work 1:5:10( 1cement:5 sand:10 graded stone aggregate 40mm nominal size) and curing complate excluding cost of work in foundation & plinth.
3.33
-
-
... More
Providing and laying cement concrete work 1: 1.5 :3 (1cement:1:1.5 sand:3 graded stone aggregate 20mm nominal size) and curing complate excluding cost of work and reinforcement for reinforced concrete work in suspended floor landing and shelves and their support balconies beam girderd, bressmeers and cantilever uo to floor two level. Vertical surface wall of tank.
5.31
-
-
... More
Providing and laying cement concrete work 1:3:6 ( 1 cement :3 sand :6 graded stone agreegate 20mm nominal size) and curing etc. complate .
8.1
-
-
... More
Providing & form work with steel plate 3.15 mm thick welded with angle iron in frame 30x30x5 mm. soas to give a rough finishing including centring shuttering.strutting and propping and centering below supporting float to ceiling not exceeding 4 mtrs and removal of the same for institu reinforced concrate work in. Vertical surface wall of tank.
17.3
-
-
... More
Providing and laying of tor/ mild steel reinforcement for RCC work including bending binding and placing in position complate up to floor two level @ 75 kg per cum & 95 kg per cum.
319
-
-
... More
Bolder filling dry hand packed tightly retaining wall
13.5
-
-
... More
Providing and laying cement concrete work 1:2:4((1cement :2 sand:4 graded stone aggregate 20mm nominal size) and curing complate excluding cost of work and reinforcement for reinforced concrete work in suspended floor landing and shelves and their support balconies beam girderd, bressmeers and cantilever uo to floor two level.
1.62
-
-
... More
Steel work bolted in built up saction i/c cutting hoisting and placing in position complete in steel trussed bridge be yond 15 mtrs span . Steel work ( welded in built up saction for railing of foot bridge)
5352.18
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements