Himachal Pradesh Tourism Development Corporation Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh Tourism Development Corporation - HPTDC Tender

Works
Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date29 Jul 2024
Closing Date30 Aug 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Constuction Of Remain Ing Work Of Shiv Dham (phase-i) At Kangnidhar Mandi Distt. Mandi H..p Sub Head Structural Construction Of Replica Of 12 Jyotirlings Site Development And Approach Road.

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.up-to all lead and lifts as per the diretion of Engineer in Charge at site.

21813.39

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand): 6 graded stone aggregate 40 mm nominal size) as per the diretion of Engineer in Charge including carriage of materials within all lead and lifts .

85.38

-

-

... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:3:6 (1 cement : 3 coarse sand) : 6 graded stone aggregate 20 mm nominal size) as per the diretion of Engineer in Charge including carriage of materials within all lead and lifts .

250

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size) as per the diretion of Engineer in Charge including carriage of materials within all lead and lifts .

4603.06

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) as per the direction of Engineer-In-Charge including carriage of materials within all lead and lifts.

432.84

-

-

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) as per the diretion of Engineer in Charge including carriage of materials within all lead, lifts and heights.

5837.86

-

-

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) as per the diretion of Engineer in Charge including carriage of materials within all lead, lifts and heights.

628.53

-

-

... More
Reinforced cement concrete work in arches, archribs, domes, vaults, shells, folded plate and roofs having slope more than 15° up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size) as per the direction of Engineer-In-Charge including carriage of materials within all lead, lifts and heights.

230.4

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete as per the diretion of Engineer in Charge including carriage of materials within all lead and lifts.

1909.1

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform as per the diretion of Engineer in Charge including carriage of materials within all lead, lifts and heights.

635.4

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc as per the diretion of Engineer in Charge including carriage of materials within all lead, lifts and heights.

11648.95

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers as per the diretion of Engineer in Charge including carriage of materials within all lead, lifts and heights .

5064.16

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Posts and Struts, rectangluar or polyganol in plan as per the direction of Engineer-In-Charge including carriage of materials within all lead, lifts and heights.

1491.46

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Posts and Struts, circular or curved in plan as per the direction of Engineer-In-Charge including carriage of materials within all lead, lifts and heights.

134.64

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for : Edge of slab and breaks, curve surafce in floor and walls under 20 cm wide as per the direction of Engineer-In-Charge including carriage of materials within all lead, lifts and heights.

980

-

-

... More
Providing form work of ordinary timber plankings so as give a rough finish including centring, shuttering and proping etc height og propping and centering below supporting floor to ceiling not exceeding 4 meters and removal of the same for insitu reinforeced concrete and plain concrete work in Where inclination and horizontal exceeds 30 degree (where shuttering may be provided both on under site upper site if required only the area of under site shall be measured or payment) as per the diretion of Engineer in Charge including carriage of materials within all lead, lifts and heights.

548.46

-

-

... More
Extra for additional height in centering shuttering whereever required with adequate bracing, propping etc including cost of de-shuttering and de-centering at all level over a height of 3.5 meter for every additional height of 1 meter or part thereof (Plan area to be measured) in suspended floors, roofs, landing, beams and balconies as per the diretion of Engineer in Charge including carriage of materials within all lead, lifts and heights..

1180.99

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Hot rolled deformed bars as per the diretion of Engineer in Charge including carriage of materials within all lead, lifts and heights . Fe 500/Fe 500D Tata/Sail/Jindal /Panther /JSPL / Shyam steel or as approved by HPTDC

1441626.3

-

-

... More
Stone filling behind retaining wall as per the diretion of Engineer in Charge including carriage of materials within all leads and lifts.

2971.21

-

-

... More
Stone soling properely hand packed filling interstics with spalls and consolidating with power road roller to the requested gradient and camber including spreading watering and rolling of binding materials moorum or earth etc. complete as per HP.PWD specification. 100mm spread thickness (finished work including materials and labour) as per the diretion of Engineer in Charge including carriage of materials within all lead and lifts .

281.5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.