Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Forest Development Corporation Limited - HPSFDCL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date1 Jul 2022
Closing Date7 Jul 2022
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Construction Of Rcc Retaining Wall In Front And Middle Near Nh Road For Proposed Rsd At

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and Laying of cc 1:6:12 in foundation with compaction(excluding rock portion) and curing complete .............. No L B H Qty . 1.00 3.00 0.90 0.10 0.27 ii under side r/wall of connected part . 1 15.00 0.60 0.10 0.90 Total 1.17

1.17

-

-

... More
Laying of RRSM in CM 1:6 in side wall .............. No L B H Qty . 1.00 15.00 0.60 0.35 3.15 . 1 15x0.60/2 - 0.60 2.70 Total 5.85

5.85

-

-

... More
Providing form work with steel plates 3.15mm th. Welded with angle iron in frame 30x30x5mm so as to give a fair finish i/c centering shuttering and strutting,propping etc. withwooden battons and ballies and removal complete. In vert. wall .............. No L B H Qty . 2.00 40.00 - 1.05+1.50/2 102.00

102

-

-

... More
Providing and lying of RCc 1:2:4 in R/Wall i/c curing complete and excluding cost of shuttering and mild steel. Base .............. No L B H Qty . 1.00 40.00 0.90 0.15 5.40 Vertical wall . 1.00 40.00 0.15 1.05+1.50/2 7.65 Total 13.05

13.05

-

-

... More
Providing mild/tor steel in RCC work i/c bending ,binding and placing in position complete upto floor two level.Tor steel Base 12mm dia tor mild steel, cross side 0.90x133 Long side 4x40 Vert. wall,cross side 160x1.30 Total 487.70x0.89 = 4.34 Qtl-1 Vert. wall 8mm dia tor steel,long side 11x40 Total 440x0.39 = 1.72 Qtl- G Total i/c wastage & w/wire = 6.50 Qtl

6.5

-

-

... More
Dry randun rubble stone mas. Behind retaining wall .............. No L B H Qty . 1.00 40.00 0.30 1.05+1.50/2 15.30

15.3

-

-

... More
Earth and Boulder stone filling behind R/wall(50:50) stone- 45cum .............. No L B H Qty . 1.00 40.00 5x.90/2 - 45.00

45

-

-

... More
Providing and laying of boulder stone soling with hand packed on ground (between internal road and platform) .............. No L B H Qty . 1.00 6.00 15.00 0.20 18.00

18

-

-

... More
Excavation in foundation for retaining wall lift upto 1.5 mtr with pick spade work ,stacking of excavated soil not more than 3 meter clear from the edge of the excavation,consolidated each refilling layer by ramming and disposing all surplus soil with in lead of 20 mtr .............. No L B H Qty . 1 40 .90 .75+.85/2 28.80

28.8

-

-

... More
Providing and Laying of cc 1:6:12 in foundation with compaction and curing complete .............. No L B H Qty . 1 40 0.9 0.10 3.60

3.6

-

-

... More
Providing form work with steel plates 3.15mm th. Welded with angle iron in frame 30x30x5mm so as to give a fair finish i/c centering shuttering and strutting,propping etc. withwooden battons and ballies and removal complete. In vert. wall .............. No L B H Qty . 2 40 - 1.20+1.05/2 114.40

114.4

-

-

... More
Providing and lying of RCc 1:2:4 in R/Wall i/c curing complete and excluding cost of shuttering and mild steel. Base .............. No L B H Qty . 1 40 0.9 0.15 5.40 vertical wall . 1 40 0.15 1.20+1.05/2 8.55 Total 13.95

13.95

-

-

... More
Providing mild/tor steel in RCC work i/c bending ,binding and placing in position complete upto floor two level.Tor steel Base 12mm dia tor mild steel, cross side .90x133 Long side 4x40 Vert. wall,cross side 160x1.43 Total 509.00x0.89=4.53 Qtl Vert. wall 8mm dia tor steel,long side 11x40 Total 440x0.39 = 1.72 Qtl including wastage and w/wire= 7.00 Qtl

7

-

-

... More
Earth and Boulder stone filling behind R/wall .............. No L B H Qty .. 1 40.00 .90x1/2 - 18.00

18

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.