Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Forest Development Corporation Limited - HPSFDCL Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date1 Jul 2022
Closing Date7 Jul 2022
Tender AmountRefer Documents
Costs
EMD
₹ 50,000Document Cost
₹ 600Tender Fee
Refer Documents
Summary
Construction Of Rcc Retaining Wall In Front And Middle Near Nh Road For Proposed Rsd At
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_FDC_62358_1Bid Award Id
ViewTender No
DM HSD Nurpur 02Tender Authority
Himachal Pradesh State Forest Development Corporation Limited ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing and Laying of cc 1:6:12 in foundation with compaction(excluding rock portion) and curing complete .............. No L B H Qty . 1.00 3.00 0.90 0.10 0.27 ii under side r/wall of connected part . 1 15.00 0.60 0.10 0.90 Total 1.17
1.17
-
-
... More
Laying of RRSM in CM 1:6 in side wall .............. No L B H Qty . 1.00 15.00 0.60 0.35 3.15 . 1 15x0.60/2 - 0.60 2.70 Total 5.85
5.85
-
-
... More
Providing form work with steel plates 3.15mm th. Welded with angle iron in frame 30x30x5mm so as to give a fair finish i/c centering shuttering and strutting,propping etc. withwooden battons and ballies and removal complete. In vert. wall .............. No L B H Qty . 2.00 40.00 - 1.05+1.50/2 102.00
102
-
-
... More
Providing and lying of RCc 1:2:4 in R/Wall i/c curing complete and excluding cost of shuttering and mild steel. Base .............. No L B H Qty . 1.00 40.00 0.90 0.15 5.40 Vertical wall . 1.00 40.00 0.15 1.05+1.50/2 7.65 Total 13.05
13.05
-
-
... More
Providing mild/tor steel in RCC work i/c bending ,binding and placing in position complete upto floor two level.Tor steel Base 12mm dia tor mild steel, cross side 0.90x133 Long side 4x40 Vert. wall,cross side 160x1.30 Total 487.70x0.89 = 4.34 Qtl-1 Vert. wall 8mm dia tor steel,long side 11x40 Total 440x0.39 = 1.72 Qtl- G Total i/c wastage & w/wire = 6.50 Qtl
6.5
-
-
... More
Dry randun rubble stone mas. Behind retaining wall .............. No L B H Qty . 1.00 40.00 0.30 1.05+1.50/2 15.30
15.3
-
-
... More
Earth and Boulder stone filling behind R/wall(50:50) stone- 45cum .............. No L B H Qty . 1.00 40.00 5x.90/2 - 45.00
45
-
-
... More
Providing and laying of boulder stone soling with hand packed on ground (between internal road and platform) .............. No L B H Qty . 1.00 6.00 15.00 0.20 18.00
18
-
-
... More
Excavation in foundation for retaining wall lift upto 1.5 mtr with pick spade work ,stacking of excavated soil not more than 3 meter clear from the edge of the excavation,consolidated each refilling layer by ramming and disposing all surplus soil with in lead of 20 mtr .............. No L B H Qty . 1 40 .90 .75+.85/2 28.80
28.8
-
-
... More
Providing and Laying of cc 1:6:12 in foundation with compaction and curing complete .............. No L B H Qty . 1 40 0.9 0.10 3.60
3.6
-
-
... More
Providing form work with steel plates 3.15mm th. Welded with angle iron in frame 30x30x5mm so as to give a fair finish i/c centering shuttering and strutting,propping etc. withwooden battons and ballies and removal complete. In vert. wall .............. No L B H Qty . 2 40 - 1.20+1.05/2 114.40
114.4
-
-
... More
Providing and lying of RCc 1:2:4 in R/Wall i/c curing complete and excluding cost of shuttering and mild steel. Base .............. No L B H Qty . 1 40 0.9 0.15 5.40 vertical wall . 1 40 0.15 1.20+1.05/2 8.55 Total 13.95
13.95
-
-
... More
Providing mild/tor steel in RCC work i/c bending ,binding and placing in position complete upto floor two level.Tor steel Base 12mm dia tor mild steel, cross side .90x133 Long side 4x40 Vert. wall,cross side 160x1.43 Total 509.00x0.89=4.53 Qtl Vert. wall 8mm dia tor steel,long side 11x40 Total 440x0.39 = 1.72 Qtl including wastage and w/wire= 7.00 Qtl
7
-
-
... More
Earth and Boulder stone filling behind R/wall .............. No L B H Qty .. 1 40.00 .90x1/2 - 18.00
18
-
-