Himachal Pradesh State Electricity Board Limited Tender

... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Plastic and Rubber
Electrical and Electronics
Metals and Non-Metals
Electrical Works
Eprocure
Opening Date1 Apr 2025
Closing Soon10 Apr 2025
Tender Amount₹ 4,03,125 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Rough sagging i.e. removal of conductor from insulator & Re-winding & striging of conductor (LT Line)

13.53

-

54362.19

... More
Rough sagging i.e. removing of GI wire with accessories and fixing on replced of poles per Km (GI wire)

4.24

-

12272.85

... More
Manual carriage of ST Pole 9 mtr. Long ( Av.Lead 0.300 Km.)

13.2

-

15576

... More
Erection Part for TS No. 208/2022-23

-

-

-

... More
Erection of Steel tubular pole 9 mtr. Long (LT) :-Digging of pit for poles, drilling of holes in poles,,erection of poles, erection of RCC muff,erection of D-iron, shackle insulator,earth hook filling of pit and ramming, Painting of poles etc, complete in all respect.

6

-

13098

... More
Erection of stay set LT comprising following nozzling & tightning complete in all respect.

4

-

4956

... More
Rough sagging i.e. removal of conductor from insulator & Re-winding & striging of conductor (LT Line)

2.84

-

11410.84

... More
Rough sagging i.e. removing of GI wire with accessories and fixing on replced of poles per Km (GI wire)

0.84

-

2416.94

... More
Manual carriage of ST Pole 9 mtr. Long ( Av.Lead 0.350 Km.)

2.1

-

2478

... More
Erection Part for TS No. 209/2022-23

-

-

-

... More
Erection of Steel tubular pole 9 mtr. Long (LT) :-Digging of pit for poles, drilling of holes in poles,,erection of poles, erection of RCC muff,erection of D-iron, shackle insulator,earth hook filling of pit and ramming, Painting of poles etc, complete in all respect.

5

-

10915

... More
Erection of stay set LT comprising following nozzling & tightning complete in all respect.

4

-

4956

... More
Rough sagging i.e. removal of conductor from insulator & Re-winding & striging of conductor (LT Line)

2.25

-

9040.28

... More
Rough sagging i.e. removing of GI wire with accessories and fixing on replced of poles per Km (GI wire)

0.81

-

2330.1

... More
Manual carriage of ST Pole 9 mtr. Long ( Av.Lead 0.300 Km.)

1.5

-

1770

... More
Providing and supply of material

-

-

-

... More
Supply Part for TS No. 51/2020-21

-

-

-

... More
Prov. RCC Muff

44

-

77835.56

... More
Prov. Shackel Insulator

42

-

1764

... More
Prov. D-iron

42

-

3612

... More
Prov. LT Stay Set complete in all respect

8

-

10784

... More
Prov. Aluminium Paint

44

-

15134.68

... More
Prov. Nuts & Bolts off size

35

-

4130

... More
Supply Part for TS No. 208/2022-23

-

-

-

... More
Prov. RCC Muff

6

-

10613.94

... More
Prov. Shackel Insulator

15

-

630

... More
Prov. D-iron

15

-

1290

... More
Prov. LT Stay Set complete in all respect

4

-

5392

... More
Prov. Aluminium Paint

6

-

2063.82

... More
Prov. Nuts & Bolts off size

3

-

354

... More
Supply Part for TS No. 209/2022-23

-

-

-

... More
Prov. RCC Muff

5

-

8844.95

... More
Prov. Shackel Insulator

13

-

546

... More
Prov. D-iron

13

-

1118

... More
Prov. LT Stay Set complete in all respect

4

-

5392

... More
Prov. Aluminium Paint

5

-

1719.85

... More
Prov. Nuts & Bolts off size

3

-

354



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.