Himachal Pradesh State Electricity Board Limited Tender

... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Civil And Construction
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date4 Feb 2025
Closing Date10 Feb 2025
Tender Amount₹ 21,06,236 
Notes
Download

Costs

Summary

Seop-30/2024-25

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Muffs with concerete filling

15

-

24209.7

... More
Stay Set Complete

15

-

17831.55

... More
Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)

105

-

10180.8

... More
Stay Wire (7/3.15 mm) (for messenger) 110kG per kM

141.9

-

13758.62

... More
Insulated clamp for messenger and cable @ 1 meter intervel for cable support 90% of cable quantity

1161

-

199343.7

... More
Full Clamp for stay

15

-

5151

... More
X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length [600 mm]

14.4

-

6966.58

... More
Knee Bracing set (65x65x6mm) 2 x 750 mm

15

-

8938.5

... More
Half Clamp for Cross Arm

15

-

2575.5

... More
Anchoring Assembly for HT

30

-

11089.8

... More
Suspension Assembly for HT

30

-

8756.7

... More
Facade Hooks for HT

30

-

3060.3

... More
Cable Termination kit

4

-

32800.76

... More
HT Earthing set complete (preferbly coil earthing)

4

-

5280.28

... More
Aluminium paint

15

-

5544.9

... More
T&P HP 60.5 cm (23.8) All-in-One Desktop PC 24-cb1907 12th Generation Intel® Core™ i5 processor ,Windows 11 Home 60.5 cm (23.8) diagonal FHD display with Intel® Iris® Xᵉ graphics,8 GB DDR4 RAM 512 GB SSD Solid State Drive, HP 710 Black Wireless Keyboard and mouse combo, Wide Vision 1080p FHD IR privacy camera, 1 HDMI-out 1.4 for Complaint Room

1

-

66344.88

... More
Erection Charges for OH Cable complete in all respect

1

-

220535.16

... More
Transportation Charges complete in all respect

1

-

37802.28

... More
100 KVA S/Stn

-

-

-

... More
Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA

1

-

172899.88

... More
Steel Tubular Poles (09 m, Working Load 200 kgf/m²)

2

-

33719.86

... More
Muffs (2000mm) with concerete filling

2

-

3227.96

... More
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line

2

-

4563.18

... More
MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA's

1

-

1056.46

... More
X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch

4

-

6819.52

... More
Transformer Bed, Belting & Knee Bracing

-

-

-

... More
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed

2

-

4563.18

... More
X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer]

2

-

749.42

... More
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos

2

-

2112.92

... More
MS Angle Iron (35X35x6 mm), Length : (460 ) x 2 Nos

2

-

236.34

... More
MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing

2

-

717.1

... More
Transformer LT Dist. Box and GO Switch fixing Assembly

-

-

-

... More
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos

2

-

2112.92

... More
MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos

1

-

169.68

... More
GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm

1

-

155.54

... More
GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type

1

-

8600.15

... More
Surge Arrester, 9 kV Station Class (Porcelain Type)

3

-

1190.79

... More
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)

-

-

-

... More
Pin Insulator 11kv

6

-

987.78

... More
Stay set complete

3

-

3566.31

... More
Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)

18

-

1745.28

... More
Pipe Earthing Set and

3

-

10411.08

... More
6 SWG GI wire For Earthing

3

-

290.88

... More
LT Distribution Panel Box with MCCB(MCCB 200 amp 3P35kA , ICS =100 %ICU, Kit-Kit 200 Amp MS Sheet of 1.6mm ( 900x800x200mm ) cubide Boxcomplete withstand etc and AlBusbar(25x6mm)inside .painted /powdercoated after primar coating

1

-

20179.8

... More
Half Clamp (M.S. Flat 50X6 mm)

17

-

2918.9

... More
Full Clamps (M.S. Flat 50X6 mm)

9

-

3090.6

... More
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]

27

-

3545.1

... More
Aluminium Thimble

16

-

242.4

... More
Danger Plate

1

-

133.32

... More
Barbed Wire

15

-

1454.4

... More
LT Cable (1.1 kV, 3.5 Core, 95 mm2)

30

-

8241.6

... More
Energy Meter (3-ɸ, 4 wire CT operated Static Tri- Vector meter (CT- 200/5 A)

1

-

17048.8

... More
a). Aluminium Paint.

4

-

1478.64

... More
Erection Charges complete in all respect

1

-

77891.63

... More
Transportation Charges complete in all respect

1

-

8334.11

... More
Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart. Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.