Himachal Pradesh State Electricity Board Limited Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date23 Jan 2025
Closing Date30 Jan 2025
Tender Amount₹ 2,32,305 
Notes
Download

Costs

Summary

Tender For I Prrov 1phase Lt Line From 63 Sstn Jussaab At Samoga (ii) Re-orgn Strng Of 3phase 1 Phase Lt Line From 63kva Sstn Kharothi (iii) Prov 1phase Lt Line To Loh In Village Ie Shalai Mandrund Birwari (iv) Prov1phas Lt Linefrom25kva Sstn Salodi

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Aluminium Paint

2

366

732

... More
Earth Hook

4

52

208

... More
Strap for Egg

5

25

125

... More
LT Stay Clamp with Bolts

5

340

1700

... More
(Erection Part Ts.No. 69/2024-25)

-

-

-

... More
Erection of S/T Pole 8mtr long for (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, g) Painting of pole, complete in all respect.

4

3100

12400

... More
Erection for Laying of Conductor (ACSR 6/1/3.35 (50mm²)), Stringing and Sagging including binding with insulator complete in all respect.

0.62

13840

8553.12

... More
Erection of Laying and Sagging of GI Wire Guarding complete in all respect.

0.31

4000

1236

... More
Erection of LT Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect.

5

1648

8240

... More
Providing & Filling of RCC Muffs for Steel tubler Pole. 1800mm with concerete filling.

4

1598

6392

... More
Manual Carriage of ST Poles 8 mtr Long Pole for an average Lead of 1Km

4

500

2000

... More
(Supply Part Ts.No. 184/2023-24)

-

-

-

... More
Egg Insulator

5

22

110

... More
Nuts & Bolts off size.

10

117

1170

... More
Aluminium Paint

5

366

1830

... More
Earth Hook

5

52

260

... More
Strap for Egg

3

25

75

... More
LT Stay Clamp with Bolts

5

340

1700

... More
(Erection Part Ts.No. 184/2023-24)

-

-

-

... More
Erection of S/T Pole 8mtr long for (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, g) Painting of pole, complete in all respect.

5

3100

15500

... More
Erection for Laying of Conductor (ACSR 6/1/3.35 (50mm²)), Stringing and Sagging including binding with insulator complete in all respect.

0.3

13840

4152

... More
Erection of Laying and Sagging of GI Wire Guarding complete in all respect.

0.16

4000

620

... More
Erection of LT Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect.

5

1648

8240

... More
Providing & Filling of RCC Muffs for Steel tubler Pole. 1800mm with concerete filling.

5

1598

7990

... More
Manual Carriage of ST Poles 8 mtr Long Pole for an average Lead of 1Km

5

500

2500

... More
(Supply Part Ts.No. 274/2021-22)

-

-

-

... More
LT Stay Set complete in all respect.

10

970

9700

... More
Nuts & Bolts off size.

20

117

2340

... More
LT Stay Clamps with Bolts

10

340

3400

... More
Aluminium Paint.

8

346

2768

... More
Eye Hook Bolts

16

52

832

... More
Shackle Insulator

24

26

624

... More
D-Iron

24

86

2064

... More
Egg Insulator LT

12

22

264

... More
(Erection Part Ts.No. 274/2021-22)

-

-

-

... More
Erection of S/T pole 8 mtr long, a) Digging Of Pit, b) Drilling Of Holes In Pole X-Arm, c) Erection Of Pole, d) Erec. Of X-Arm e) Shackle Insulator & D-Iron f) Filling Of Pit And Ramming g) Fixing of Nuts & Bolts h) Polishing of Pole with Aluminium Paint complete in all respect.

8

3100

24800

... More
Erection for Laying of Conductor (AAAC 30mm²), Stringing and Sagging including binding with insulator complete in all respect.

1.55

13840

21382.8

... More
Erection of Laying and Sagging of GI Wire Guarding complete in all respect.

0.75

4000

3000

... More
Erection of L.T Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect.

10

1480

14800

... More
Providing & fixing of RCC Muffs for Steel tubler Pole. 1800mm with concerete filling.

8

1598

12784

... More
Manual Carriage of ST Poles 8mtr Long Pole for an average Lead of 2Km

8

500

4000

... More
(Supply Part Ts.No. 199/2023-24)

-

-

-

... More
Egg Insulator

8

22

176

... More
Nuts & Bolts off size.

16

117

1872

... More
Aluminium Paint

3

366

1098

... More
Earth Hook

7

52

364

... More
Strap for Egg

8

25

200

... More
LT Stay Clamp with Bolts

8

340

2720

... More
(Erection Part Ts.No. 199/2023-24)

-

-

-

... More
Erection of S/T Pole 8mtr long for (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, g) Painting of pole, complete in all respect.

4

3100

12400

... More
Erection for Laying of Conductor (ACSR 6/1/3.35 (50mm²)), Stringing and Sagging including binding with insulator complete in all respect.

0.58

13840

8027.2

... More
Erection of Laying and Sagging of GI Wire Guarding complete in all respect.

0.29

4000

1160

... More
Erection of LT Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect.

4

1648

6592

... More
Providing & Filling of RCC Muffs for Steel tubler Pole. 1800mm with concerete filling.

4

1598

6392

... More
Manual Carriage of ST Poles 8 mtr Long Pole for an average Lead of 1Km

4

500

2000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.