Himachal Pradesh State Electricity Board Limited Tender

... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date26 Mar 2025
Closing Soon1 Apr 2025
Tender Amount₹ 1,05,922 
Notes
Download

Costs

Summary

Repair And Restoration Of 11kv Babeli Feeder (ramshila To Bandrol) Damaged/washed Due To Heavy Rainfall/snowfall On Dated 28/02/2025 In (e) Section Babeli Esd No. Ii, Hpsebl, Kullu

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Steel tubular poles 10m Long with muff

1.5

2912

4368.36

... More
Stay Set i/c Stay wire

2.5

102

256.65

... More
ERECTION OF HT LINE

-

-

-

... More
ERECTION OF STEEL TUBLAR POLES (Single Pole 10mtr. Long)

-

-

-

... More
Digging of pit

3

1359

4078.08

... More
Erection of Pole

3

2122

6368.46

... More
Filling of pit +Ramming

3

446

1338.12

... More
Drilling of hole in poles, X-Arms

3

231

693.84

... More
Fixing of insulator , X-Arms, Knee Bracing Set, Top Clamp etc.

3

547

1642.56

... More
Providing paint & painting one priming coat with ready mixed priming paint brushing red lead/zinc oxide chrome painting two coats with alluminium paint of superior quality i/c all type of lead and lift and other incidentals complete in all respect ( single steel tubular pole) and fittings

3

901

2704.56

... More
Filling of RCC muff with cement concrete 1:3:6 (1 cement:3 sand : 6 aggregate 20 mm nomial size) curing complete & placing of templets etc. complete job as per standard specification of HPSEBL as per direction of site Engineer.

3

814

2442.6

... More
Straightening of HT Tilted Pole

-

-

-

... More
Single Pole 9 mtr long

5

902

4513.5

... More
Double Pole Str 9 mtr long

2

1784

3568.32

... More
Dismantlement of Conductor

-

-

-

... More
Removal of Conductor

0.9

482

434.36

... More
De-Stringing

0.9

10919

9827.75

... More
Re-sagging/sagging of conductor 6/1/3.35mm (50Sqmm)

-

-

-

... More
Laying of conductor

0.3

4101

1230.5

... More
Re-Stringing & Re-sagging

1.2

11496

13796.09

... More
Binding with insulator

1.2

732

879.34

... More
STAY SET (HT)

-

-

-

... More
Digging of pit

5

1359

6796.8

... More
Fixing of stay rod

5

245

1227.2

... More
Filling of Pit

5

424

2124

... More
Nozzeling & Tightening

5

245

1227.2

... More
Earthing

-

-

-

... More
Digging of pit

3

849

2548.8

... More
Fixing of GI wire to earth system

3

457

1373.52

... More
Filling of Pit

3

424

1274.4

... More
Re-Nozzeling & Tightening of HT stay set

12

245

2945.28

... More
Total (Erection Part)

-

-

-

... More
SUPPLY PART

-

-

-

... More
Prov. RCC Muffs

3

1064

3193.08

... More
Prov. HT Stay Set i/c stay wire complete in all respect

5

2136

10684.9

... More
Prov. Earthing Set

3

1306

3918.78

... More
Prov. Nut & Bolts

10

129

1298

... More
Prov. C.I. X-Arm (1270X100X50X6) mm

3

1023

3069.18

... More
Prov. Knee Bracing Set 2(750x50x50x6)mm

6

279

1677.96

... More
Prov. Half Clamp

6

169

1019.52

... More
Prov. Full Clamp

6

339

2039.04

... More
Prov. Top Clamp

3

326

980.58



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.