Himachal Pradesh State Electricity Board Limited Tender

... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date5 Sep 2022
Closing Date15 Sep 2022
Tender Amount₹ 14,52,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 2800 mm x 2 Nos] for Incomer Line.

2

-

2124.6

... More
MS Angle Iron (50X50x6 mm), Length: 2800 mm x (1 Nos for LA's ).

1

-

1081.9

... More
MS Channel Iron X-Arm:[Size (75x40x6)mm, Length : 2800 mm x 4 Nos] supporting DO fuse unit & GO switch.

4

-

1685.6

... More
MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 2800 mm x 2 Nos] for Transformer Bed.

2

-

2124.6

... More
MS Channel Iron X-Arm:[Size (100x50x6 mm), Length : 460 mm x 2 Nos] for supporting Main Channel of Transformer].

2

-

349

... More
MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos. for Belting of Transformer

2

-

1081.9

... More
MS Angle Iron (50X50x6 mm), Length : 460 mm x 2 Nos for supporting Belt X Arms.

2

-

177.7

... More
MS Angle Iron (50X50x6 mm), Length : 950 mm x 2 Nos for Bed Knee Bracings.

2

-

367.1

... More
MS Angle Iron (50X50x6 mm), Length: 2800 mm x ( 2 No. for LT Distribution Panel Box).

2

-

1081.9

... More
MS Chanel Iron (75x40x6 mm), Length: 0.460 mm x ( 1 No. for GO Switch Handle mounting).

1

-

276.9

... More
GO AB Switch Unit (11KV, 400A,25KA) Tripple pole O/D type

1

-

6700.7

... More
GO AB Switch Guide Clamp / Full Clamp (M.S. Flat 50X6 mm)

1

-

274.1

... More
D.O Fuse Unit

1

-

2160.1

... More
Surge Arrester, 9 kV Station Class (Porcelain Type)

3

-

385.8

... More
Discs insulator sets (comprising 1 No. Disc: (Polymer Composit Disc Insulator BS, 12 kV, 90 kN) including Ball Cleave, Bend Stapple, Dead End Clamps etc.)

3

-

1381.1

... More
HT Stay Set Complete i/c Guy Assembly and Helically fittings)

2

-

1084.5

... More
Stay Wire (7/3.15 mm) (9.0 kg Per Stay Set)

18

-

76.7

... More
Stay Clamp / Full Clamp (M.S. Flat 50X6 mm)

2

-

274.1

... More
Sub-Station Pipe Earthing Set (Complete in all respect)

3

-

3338.2

... More
LT distribution Panel Box with MCCBWith MCCB(100A, 35KA, 4P, 1No) & SFU(32A, 4No, rewirable) for 63KVA transformer complete in all respect as per relevant technical specification.

1

-

22951.5

... More
Half Clamp made of MS Flat 50x6mm

17

-

158.6

... More
Full Clamp made of MS Flat 50x6mm

9

-

274.1

... More
M./S Nuts & Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)]

25

-

98.7

... More
Aluminium Thimble of various sizes

16

-

42

... More
Aluminium Thimble of LT Cable size

4

-

338.1

... More
Danger Plate (250X200X1.6 mm)

1

-

133.4

... More
Barbed Wire

15

-

78.8

... More
PVC LT Cable 3½ core 95mm2

15

-

247.4

... More
3 phase 4 wire, LT/CT Type Electronic Energy Meter for 63KVA Transformer of capacity: 100/5Amps.with Accuracy Class 0.5.

1

-

13279.8

... More
Red Oxide

4

-

156

... More
Aluminium Paint.

4

-

342.2

... More
HT LINE : AAAC 7/3.81mm (80mm²) conductor {Includes 3 conductor lengths for 3Φ and additional 1% (Sag, Jumpering and wastage}

2.19

-

63532

... More
9Mtr Long ISI marked Swaged Steel Tubular Pole as per IS 2713/1980 (Part-II) as ammended time to time a/w cap welded on top and Cast Iron Base Plate of designation 410-SP-32.

12

-

13924

... More
RCC Muff 2000mm Long with concrete filling material

12

-

1758.64

... More
MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 1.270 mm. (1Nos. / Structure]

5

-

963.68

... More
MS Angle Iron Kney Bracing Set size (50x50x6 mm), Length (750mmx 2 Nos./ Structure)

10

-

289.8

... More
Pole Top Bracket made of (M.S. C.I. 100x50X6mm)100mm

5

-

75.9

... More
11 kV Pin Insulators (Polymer Composit 12 kV, 5 KN) with GI Pin (3Nos. Per Pole Structure)

15

-

169.5

... More
MS Channel Iron X-Arm, [Size (100x50x6)mm, Length : 2340 mm X 2 Nos/ Structure] for 2 Nos Dead /Double Pole Structure.

6

-

1775.6

... More
MSAI.Belt Set for X-Bracing set of Size (1800x50x50x6 mm) for Double Pole str. (2Nos per Set) .

6

-

695.5

... More
MSAI Bracing Set for X-Bracing set for double pole str of Size 2125x50X50x6mm each ( 2 Nos per set ).

6

-

821.1

... More
Half clamps made of MS Flat size 50x6mm for X-Bracing Set (4Nos per Set) .

12

-

158.6

... More
Discs insulator sets (comprising 1 No. Disc: (Polymer Composit Disc Insulator BS, 12 kV, 90 kN) including Ball Cleave, Bend Stapple, Dead End Clamps etc.)

30

-

1381.1

... More
11 kV Pin Insulators (Polymer Composit 12 kV, 5 KN) with GI Pin (3Nos. Per Pole Structure)

9

-

169.5

... More
HT Stay Set Complete i/c Guy Assembly and Helically fittings)

18

-

1084.5

... More
Stay wire 7/3.15 mm@ 9.00 kG per stay set

162

-

76.7

... More
Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm).

18

-

274.1

... More
HT Pipe Earthing Set complete in all respect.

4

-

2809.8

... More
Continous Earth wire (GI, 8 SWG) {alongwith 1 wire lengths for avg.one road crossing @ 20 m and Additional 1% (Sag and wastage)} including Cross Lacings (GI, 8 SWG) [ 2.2 m x 9 Nos @ 2 m spacing] at road crossings {0.102 kg/m}

150

-

68.3

... More
Eye Hook for Earth Wire

8

-

28.4

... More
Earth Wire Clamp made of M.S. Flat of size(50 x 6mm).

8

-

274.1

... More
MSAI of size 2400x50X50x6mm for Guarding (1 Nos per Structure ).

3

-

927.4

... More
MSAI of size 1300x50X50x6mm for Guarding (1 Nos per Structure ).

4

-

502.3

... More
Half Clamp made of M.S. Flat of size(50 x 6mm).

10

-

158.6

... More
Full Clamp made of M.S. Flat of size(50 x 6mm).

10

-

274.1

... More
Providing of Barbed and fixing it on HT Line the structures complete in all respect

34

-

78.8

... More
Providing Red Oxide Paint and painting the structures with paint complete in all respect

12

-

156

... More
Providing Al. Paint and painting the structures with Al. paint complete in all respect

18

-

342.2

... More
Danger Plate (250X200X1.6 mm)

70

-

133.4

... More
M.S.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm² or more (with flat and spring washers)]

70

-

98.7

... More
G.O. AB Switch Unit (11kV, 400Amps, 25 kA ) Tripple Pole Outdoor type

1

-

6700.7

... More
GO AB Switch Guide Clamp / Full Clamp (M.S. Flat 50X6 mm)

1

-

274.1

... More
MS Channel Iron X-Arm:[Size (75x40x6)mm, Length : 2800 mm x 2 Nos] for the installation of GO AB Switch .

2

-

1685.6

... More
MS Channel Iron X-Arm:[Size (75x40x6)mm, Length : 0.460 mm x 1 Nos] for the installation of GO AB Switch .

2

-

276.9

... More
LT LINE : AAAC 7/3.15mm (50mm²) conductor {Includes 4 conductor lengths for 3Φ and additional 1% (Sag, Jumpering and wastage}

2.1

-

43406

... More
8 Mtr. Long ISI marked, Swaged Steel Tubular poles as per IS:2713/1980 (Part-I-III) as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation 410SP-14.

10

-

9692

... More
RCC Muff 2000 mm long with concrete filling material

10

-

1758.6

... More
Shackle Insulator (16 kN)

44

-

42

... More
D-Iron (U- Clamps)made of MS Flat 50x6mm.

44

-

66

... More
LT Stay Set Complete i/c Guy Assembly and Helically fittings)

8

-

866.3

... More
Stay wire 7/3.15 mm (6.00 kg. per stay set)

48

-

76.7

... More
Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm).

8

-

274.1

... More
Half Clamp made of MS Flat 50x6mm

10

-

166.1

... More
MSCI Arm (75x40x6)mm Length 0.750Mtr

10

-

451.5

... More
LT Earthing Set complete in all respect.

2

-

669.9

... More
Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102kg/m and Guarding iacross the road including cross lacings.

60

-

68.3

... More
Nuts and Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)]

30

-

98.7

... More
Aluminium Paint

10

-

342.2

... More
Earth Knob for LT Line

10

-

12.6

... More
ERECTION PART: Erection of 11/0.4KV, 63KVA Sub-Station Structure using Steel Tubular Poles a/w RCC Muff & its concrete filling as per latest standard practices /specification of REC / HPSEBL including digging of pits, erection of Poles & Muffs, Filling muffs with PCC mixture, re-filling of pit & ramming, drilling of holes in Cross X Arms, Preparation of Plateform Structure Members MS Channel X Arms and Knee Bracing Sets, Erection of Plateform, fixing of M.S. Cross Arms S/Stn fitting, GO Switch, DO fuse units, Lightening Arrestors, Disc Insulators, Pin Insulators, LT Ditribution Panel, Energy Meter. Erection of S/Stn. Pipe Earthing Set (3Nos.) complete in all repect including providing Char Coal, Salt etc., Erection of Transformer, Providing Earthing Connection to GO Switch, Transformer Lighteneing Arrestor etc. Erection of Stay Sets (2 Nos.), Erection of LT Cable and fixing of jumpers. Testing and commissioning of Transformer and allied equipments complete in all respect.

1

-

95668.5

... More
ERECTION OF 11KV HT LINE: Erection of Double Pole Dead structure with Steel Tubular Pole 11mtr. Long : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms and Xbracing set,fixing of insulators,X-arms and X-bracung set,erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect.

3

-

12761.7

... More
Erection of single Pole Run through Structure with Steel Tubular Pole 11mtr. Long : (including Digging of pit for poles, muffing of pole, drilling of holes in poles and X-arms ,fixing of insulators,X-arms, erection of poles, fixing of barbed wire,danger plate,filling of pit ramming and painting painting of structure with Redoxide Primer & then with Aluminium Paint etc.Complete in all respect.

6

-

5740.7

... More
Erection of Stay Set (HT):- Digging of pit (size0.9x0.7x1 .5 M),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.

18

-

2270.3

... More
Erection of Earthing of HT Structure including digging of pit of size 1.80x 1.2 x1.2 Mtrs, fixing of HT Earth Set, refilling the same and prov. earthing connection completein all respect.

4

-

1172.9

... More
Laying of Conductor, Stringing, Sagging of ACSR 100mm² /7/4.26mm² and binding with Insulators (3 wires) and fixing of jumper.(0.720KM Line x 3 =2.160Km Wire).

2.16

-

31527.2

... More
Laying of Earth wire with GI Wire 6SWG , Stringing, Sagging of and binding with Insulators. (0.720KM Line x 2 =1.440Km Wire).

1.44

-

7332.5

... More
Erection Charges of fixing of Jumpers of 11Kv line as per latest standard practices /specification of REC / HPSEBL (Per Set).

2

-

565.2

... More
Erection of One Set of GO Switch a/w fixing of MS Channel X-Arms, insulators & making its connections etc. as per latest standard practices /specification of REC / HPSEBL.

1

-

1054.6

... More
ERECTION OF LT LINE: Erection of LT Pole structure with Steel Tubular Pole 8mtr. Long : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL.

10

-

3313.4

... More
Erection of Stay Set (LT):- Digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.

8

-

1530.5

... More
Erection of Earthing of LT including digging of pit fixing of HT Earth Set, refilling the same and prov. earthing connection completein all respect.

2

-

1236.6

... More
Laying of Conductor, Stringing, Sagging of ACSR 50mm²/7/3.15mm² and binding with Insulators (3 wires) and fixing of jumper. (0.430KM Line x 4 =1.720Km) + (0.090Km line x 2 = 0.180Km) = 1.900Km Wire).

1.9

-

18117.7

... More
Laying of Earth wire with GI Wire 8SWG , Stringing, Sagging of and binding with Insulators. (0.430KM Line x 1 =0.430Km Wire).

0.43

-

7332.5

... More
Erection Charges of fixing of Jumpers of 11Kv line as per latest standard practices /specification of REC / HPSEBL (Per Set).

2

-

565.2

... More
Local Transportation Charges for the carriage material by road & through manual carriage to the site of work for 1Nos 63KVA,11/0.4KV Sub-Stations and their associated 1.150Km HT/LT Lines. (Complete Job)

1

-

23686

... More
Testing fees & Commissioning Charges etc. for 1No. 63KVA,11/0.4KV Sub-Stations and their associated 1.150Km HT/LT Lines. (Complete Job).(as per Schedule of General & Service Charges & HP Govt. Notification)

1

-

649

... More
Labour Cess (@ 1% of the total amount of the supply, erection, testing & commissioning of 1Nos., 63KVA,11/0.4KV Sub-Stations and their associated 1.150Km HT/LT Lines. etc. (for comlete Job).

1

-

14377



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.