Himachal Pradesh State Electricity Board Limited Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Eprocure
Opening Date20 Feb 2024
Closing Date29 Feb 2024
Tender Amount₹ 2,35,879
Costs
EMD
₹ 3,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPSEB_86485_1Bid Award Id
ViewTender No
HPSEBL/EDHMR/2023-24/154Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Half Clamp made of M.S. Flat of size (50 x 6mm).
8
1208
-
... More
Angle Iron: 50X50x6, Length [750 mm]
8
2192
-
... More
M./S Nuts & Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)].
8
784
-
... More
Stay wire 7/3.15 mm (7.00 kg. per stay set)
66
5148
-
... More
GI Wire 8SWG : Continous Earth wire {alongwith 1 wire lengths for avg.one road crossing @ 20 m and Additional 1% (Sag and wastage)} {0.102 kg/m}
67
5092
-
... More
Egg Insulator
11
231
-
... More
Aluminium Paint
8
2752
-
... More
ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 8/9Mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL.
8
17496
-
... More
Erection of Single Continous Earth wire (GI, 8 SWG)
0.66
1568
-
... More
Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
11
13750
-
... More
Laying of Conductor, Stringing, Sagging of AAAC, 30mm² mm² and binding with Insulators (4 wires) and fixing of jumper.
1.32
7531
-
... More
2 Prov. 1 ph. LT extension & aug. of 1-phase LT line into 3-phase in vill Khansan & Sangroh in ES Tikkari under ESD Tauni Devi. (T.S. No: 222/2023-24) (W.B.S 32100257-001-HMR-LT-)) 1) Prov. RCC Muff 2000 mm long with concrete filling material
10
17690
-
... More
Shackle Insulator (16 kN) D iron
20
2560
-
... More
LT Stay Set Complete i/c Guy Assembly and Helically fittings)
13
11440
-
... More
Half Clamp made of M.S. Flat of size (50 x 6mm).
10
1510
-
... More
Stay Clamp / Full Clamp made of M.S. Flat of size (50 x 6mm).
13
3549
-
... More
M./S Nuts & Bolts of various sizes (Galvanised / Coated) [Preferably 16mm² or more (with flat and spring washers)].
10
980
-
... More
Stay wire 7/3.15 mm (7.00 kg. per stay set)
78
6084
-
... More
GI Wire 8SWG : Continous Earth wire {alongwith 1 wire lengths for avg.one road crossing @ 20 m and Additional 1% (Sag and wastage)} {0.102 kg/m}
79
6004
-
... More
Egg Insulator
13
273
-
... More
Aluminium Paint
10
3440
-
... More
X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length [600 mm]
10
4380
-
... More
Conductor AAAC, 30 mm²,
1586
33306
-
... More
ERECTION OF LT LINE : Erection of LT Pole structure with Steel Tubular Pole 8/9Mtr. Long as per latest standard practices /specification of REC / HPSEBL : (including Digging of pit for pole, muffing of pole, erection of poles, refilling of pit & ramming , drilling of holes in pole and X-arm, fixing of X-arm, Shackle Insulators and painting of structure with Redoxide Primer & Aluminium Paint etc.Complete in all respect as per the standard practices / specifications of the REC /HPSEBL.
10
21870
-
... More
Erection of Single Continous Earth wire (GI, 8 SWG)
0.78
1849
-
... More
Erection of Stay Set (LT) as per latest standard practices /specification of REC / HPSEBLincluding digging of pit (size0.9*1.20*1.33),fixing of Stay Rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect.
13
16250
-
... More
Laying of Conductor, Stringing, Sagging of AAAC, 30mm² mm² and binding with Insulators (4 wires) and fixing of jumper.
1.59
9048
-
... More
Add Transportation charges from Sectional store to various sites with manual carriage of 18 nos poles/AAAC conductor a/w other allied materials
1
9000
-
... More
Labour Cess (@ 1% of the total amount of the supply, erection, testing & commissioning (for comlete Job).
1
2246
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements