Himachal Pradesh State Electricity Board Limited Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Civil And Construction
Electrical and Electronics
Electrical Works
Eprocure
Opening Date17 Aug 2024
Closing Date24 Aug 2024
Tender Amount₹ 5,90,993
Costs
EMD
₹ 5,910Document Cost
₹ 590Tender Fee
Refer Documents
Summary
Seop 07/2024-25
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_HPSEB_91976_1Bid Award Id
ViewTender No
SEOP 07/2024-25Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://www.hpseb.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Prov. C.I.F.Gx- Arm (2400x100x50x5)x2x2mm for Double Pole Str.
9.6
7747
-
... More
Prov. A.I.F.x- Arm (2800x50x50x6)mm for guarding
5.6
2092
-
... More
Prov. C.I.F.Gx- Arm (1500x100x50x6)x9mm for single pole
13.5
10894
-
... More
Prov. A.I.F.x- Arm (1800x50x50x6)x9mm for guarding
16.2
6053
-
... More
Prov.A.I Knee bracing set 2(750x50xx50x6)mmx13 for single Pole
13.5
4990
-
... More
Prov.A.I X- bracing set (2800x50xx50x6) (1500x50x50x6)x2x2mm for Double Pole Str.
17.2
6358
-
... More
Prov. Pin Insulator with pin hellically formed fitting CD-320mm
33
5432
-
... More
Prov. Disc Insulator Set on dead end structures comprising of 1 no. Disc porcelain BS, 12 kV, 90 kN, including dead end clamp, staringht staples and bend staplesx(3 no. conductors)x2 no. sides
15
25876
-
... More
Prov. H.T.Stay set Complete
19
22586
-
... More
Prov. Stay wire 7/3.15 mm (@ 8.0 kg Per Stay set )
152
14737
-
... More
Prov. Half Clamp for cross arms
15
2575
-
... More
Prov. Full Clamp for stay set
19
6524
-
... More
Prov. Nut & Bolt ( off sizes )
26
3413
-
... More
Aluminum Paint
13
4805
-
... More
Prov.AAAC 7/3.15 mm ( 50mm2 )
2163
109231
-
... More
Prov. G.I wire 8 SWG
200
19392
-
... More
Prov. Earth Hook HT 8" Long
15
787
-
... More
Prov. Egg insulator HT
19
652
-
... More
Transportation Charges
1
14497
-
... More
Re-Erection charges of AAAC 7/3.15 mm sq. i.e. Laying, Stringing and sagging, Binding with insulator complete in all respect.
2.85
42253
-
... More
Erection Charges of ST Pole 9 mtr long complete in all respect.
9
38489
-
... More
Erection Charges of HT Stay Set complete in all respect.
19
37049
-
... More
Erection Charges of Double pole str. S/T 9 mtr long complete in all respect.
2
23068
-
... More
Re-Erection Charges of GI wire i.e. Laying, Stringing and sagging, Binding with insulator complete in all respect.
1.9
8760
-
... More
Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart.
Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements