Himachal Pradesh State Electricity Board Limited Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Eprocure
Opening Date30 Jan 2025
Closing Soon11 Feb 2025
Tender Amount₹ 8,14,688 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Erection of Earthing Set HT:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.

7

1468

10276

... More
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.

7

1929

13503

... More
Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect.

1.05

20507

21552.86

... More
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.(Duble wire)

0.34

4180

1421.2

... More
Fixing jumper complete in all respect.

3

207

621

... More
Erection of G.O. Switch

1

12500

12500

... More
Supply Part of HT line

-

-

-

... More
Prov. Steel Tubler Pole 11 mtr long. ( Qty.:- 7 , Unit :- No. Provided by HPSEBL)

-

-

-

... More
Prov. RCC muff with concerete filling ( Qty.:- 7 , Unit :- No. Provided by HPSEBL).

-

-

-

... More
Prov. AAAC 7/3.81(80 mm²) i/c 3% cutting,wastage & sagging

1.05

76874

80794.57

... More
Prov. G.I.Wire No.8 SWG for earth ( 1.01 kms ).

36

96

3456

... More
Cross Arm: [Channel Iron (100x50x6 mm), Length: 1500 mm

5

1107

5535

... More
Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures

5

280

1400

... More
Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]

5

327

1635

... More
X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No.

4

794

3176

... More
X-Arm (Horizontal) - MS Channel Iron C type: 100X50x6, Length: 2340 mm x 2 No.] Δ Formation

4

1888

7552

... More
Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No.

4

672

2688

... More
Stay set complete in all respect (4No. / Dead Structure & 2 No./Run Thro.)

-

-

-

... More
Stay Wire (7/3.15 mm) (10 kg Per Stay Set)

-

-

-

... More
HT Earthing set complete

7

1307

9149

... More
Eye Hook for earth wire

9

52

468

... More
Half clamps

14

170

2380

... More
Full clamps:

14

340

4760

... More
11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure ( Qty.:- 18 , Unit :- No. Provided by HPSEBL).

-

-

-

... More
Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps,straight stapples & Bend Stapples etc.) x (3 No. conductors ) x (2 No. sides)

6

1708

10248

... More
MS Angle Iron 50x50x6, Length: 2800 mm

1

1046

1046

... More
Danger Plate (250X200X1.6 mm) ( Qty.:- 6 , Unit :- No. Provided by HPSEBL).

-

-

-

... More
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ

21

130

2730

... More
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos for GO AB Switch Unit

2

1046

2092

... More
GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type

1

8518

8518

... More
GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm

2

154

308

... More
Barbed Wire

18

96

1728

... More
Aluminium Paint

14

366

5124

... More
ERECTION PART of New 3-Ph LT line

-

-

-

... More
Erection of LT line. Digging of pit, errection of S.T pole 8 mtr.long, errection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect.

6

3121

18726

... More
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.

6

1648

9888

... More
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect.

6

1228

7368

... More
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with 7/3.15 mm Conductor line length = 0.310 kms 3-Ph. complete in all respect.,

1.28

13840

17673.68

... More
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.

0.31

4180

1295.8

... More
SUPPLY PART LT Line

-

-

-

... More
Prov.Steel Tubular Pole 8 mtr long ( Qty.:- 6 , Unit :- No. Provided by HPSEBL)

-

-

-

... More
Prov. RCC muff with concerete filling ( Qty.:- 6 , Unit :- No. Provided by HPSEBL).

-

-

-

... More
Prov. AAAC Conductor 7/3.15 mm i/c 3% cutting, wastage & sagging.

1.28

52521

67069.32

... More
Prov. G.I.Wire No.8 SWG for earth ( 1.02 kms ).

33

96

3168

... More
Prov.M S C.I- X-Arm ( 75X40X 6) 0.75 Mtr. long

6

1015

6090

... More
Prov.MS Half Clamp (M.S FLATE 50X6mm)

6

170

1020

... More
Prov.MS Full Clamp (M.S FLATE 50X6mm)

6

340

2040

... More
Prov.Nut-Bolts in kg.

12

130

1560

... More
Prov.Shackle Insulators 16 kn with M.S.D-Iron

24

112

2688

... More
Prov. Egg. Insulator.

6

22

132

... More
Prov.Earth Knob.

6

13

78

... More
Prov.L.T. Stay Set complete in all respect

6

970

5820

... More
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)

36

96

3456

... More
Prov.L.T. Earthing set complete in all respect.

6

768

4608

... More
Prov.PVC Spacer

12

73

876

... More
Prov. Alluminium Paint.

12

366

4392

... More
LT 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured

60

461

27660

... More
LT 3.5 X 185 mm² 1.1 kV XLPE Cable Unarmoured

30

706

21180

... More
ERECTION PART (Sub-Station).1 Nos

-

-

-

... More
Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, AI i.e X-arml, Knee bracing set, errection of D-pole,errection of plate form, errcetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Errection of T/F, and earthing conn. to T/F G.O Switch lightning etc. errection of Stay Set, Errection of Jumper, Pipe earthing 3 Nos., Errection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect , complete in all respect.

1

60000

60000

... More
Sub-Station Supply Material

-

-

-

... More
Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA

1

171188

171188

... More
Steel Tubular Poles (9 m, Working Load 200 kgf/m²) ( Qty.:- 2 , Unit :- No. Provided by HPSEBL)

-

-

-

... More
Muffs (2000mm) with concerete filling ( Qty.:- 2 , Unit :- No. Provided by HPSEBL)

-

-

-

... More
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos]

2

2259

4518

... More
MS Angle Iron (50X50x6 mm), Length: 2800 x1 Nos for LA's

1

1046

1046

... More
X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch

4

1688

6752

... More
Transformer Bed, Belting & Knee Bracing

-

-

-

... More
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed

2

2259

4518

... More
X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer]

2

371

742

... More
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos

2

1046

2092

... More
MS Angle Iron (35X35x5 mm), Length : 460 x 2 Nos

2

117

234

... More
MS Angle Iron (50X50x6 mm), Length : 950 mm x 2 Nos for Bed Knee Bracing

2

355

710

... More
Transformer LT Dist Box and GO Switch fixing Assembly

-

-

-

... More
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos

2

1046

2092

... More
MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos

1

166

166

... More
GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm

1

259

259

... More
GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type

1

8518

8518

... More
D.O Fuse Unit

1

2202

2202

... More
Surge Arrester, 9 kV Station Class (Porcelain Type)

3

1235

3705

... More
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)

3

1708

5124

... More
Stay set complete

4

1177

4708

... More
Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)

7

96

672

... More
Pipe Earthing Set

3

1528

4584

... More
6 SWG GI wire For Earthing

15

96

1440

... More
LT Distribution Panel Box with MCCB(50A, 25 kA, 4P)

1

19980

19980

... More
Half Clamp (M.S. Flat 50X6 mm)

17

170

2890

... More
Full Clamps (M.S. Flat 50X6 mm)

9

340

3060

... More
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]

60

130

7800

... More
Aluminium Thimble

16

15

240

... More
Copper Thimble 200 Amp

4

472

1888

... More
Danger Plate ( Qty.:- 1 , Unit :- No. Provided by HPSEBL)

-

-

-

... More
Barbed Wire

15

80

1200

... More
LT Cable (3.5 Core) 35 mm²

15

109

1635

... More
Energy Meter (3-Phase, 4-Wire) DLMS compliant 5A CT-100 Type for 100 KVA Transformer

1

17243

17243

... More
Aluminium Paint.

4

366

1464

... More
Transportation / Mannual carriage of material at destination site.

1

15000

15000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.