Himachal Pradesh State Electricity Board Limited Tender

... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Electrical and Electronics
Electrical Works
Eprocure
Opening Date11 Feb 2025
Closing Date17 Feb 2025
Tender Amount₹ 3,10,131 
Notes
Download

Costs

Summary

Tender For I Providing 1phase Lt Line By Replacing Lengthly Pvc Section Dhulara (ii) Providing 1phase Lt Line By Replacing Lengthly Pvc Section Morthu (iii) Providing Ld Re-organisation Of Lt Line In (e) Section Morthu

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Aluminium Paint

7

344

2408

... More
Earth Knob

2

50

100

... More
Full Clamps

15

273

4095

... More
Earthing set Complete

2

667

1334

... More
(Erection Part Ts.No. 180/2023-24)

-

-

-

... More
Erection of S/T Pole 9 mtr long for (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, g) Painting of pole, complete in all respect.

5

3100

15500

... More
Erection for Laying of Conductor (ACSR 6/1/3.35 (50mm²)), Stringing and Sagging including binding with insulator complete in all respect.

0.66

13840

9134.4

... More
Erection of Laying and Sagging of GI Wire Guarding complete in all respect.

0.34

4000

1360

... More
Erection of LT Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect.

5

1648

8240

... More
Providing & Filling of RCC Muffs for Steel tubler Pole. 1800mm with concerete filling.

5

1598

7990

... More
Erection of Earthing Sets a)Digging of Pit b)Fixing of GI wire to the Earth system c) filling of Pit insulator complete in all respect.

2

1228

2456

... More
Manual Carriage of ST Poles 9 mtr Long Pole & Allied material for an average Lead of 1Km @ Rs. 600/Poles /Km

5

600

3000

... More
(Supply Part Ts.No. 182/2023-24)

-

-

-

... More
Angle Iron (75x75x6) [length -1.50mtr+ 0.02Mtr]

10

952

9520

... More
Nuts & Bolts off size.

20

117

2340

... More
Aluminium Paint

15

344

5160

... More
Earth Knob

10

50

500

... More
Earthing set Complete

4

667

2668

... More
LT Stay Set

10

880

8800

... More
(Erection Part Ts.No. 182/2023-24)

-

-

-

... More
Erection of S/T Pole 9 mtr long for (Single pole structure) a)Digging of Pit, b)Erection of pole C)Filling of pit+Ramming, D)Drilling of Holes in Poles & X-Arm, e) Fixing of insulator, X-Arm Knee Bracing Set, Top Clamp f) Fixing of Barbed wire, Danger Plate, g) Painting of pole, complete in all respect.

10

3100

31000

... More
Erection for Laying of Conductor (ACSR 6/1/3.35 (50mm²)), Stringing and Sagging including binding with insulator complete in all respect.

1.55

13840

21452

... More
Erection of Laying and Sagging of GI Wire Guarding complete in all respect.

0.75

4000

2988

... More
Erection of LT Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect.

10

1648

16480

... More
Providing & Filling of RCC Muffs for Steel tubler Pole. 1800mm with concerete filling.

10

1598

15980

... More
Erection of Earthing Sets a)Digging of Pit b)Fixing of GI wire to the Earth system c) filling of Pit insulator complete in all respect.

4

1228

4912

... More
Manual Carriage of ST Poles 9 mtr Long Pole & Allied material for an average Lead of 1Km @ Rs. 600/Poles /Km

10

600

6000

... More
(Supply Part Ts.No. 183/2023-24)

-

-

-

... More
Angle Iron (75x75x6) [length -1.50mtr+ 0.02Mtr]

11

952

10472

... More
Nuts & Bolts off size.

20

117

2340

... More
Aluminium Paint

16.5

344

5676

... More
Earth Knob

15

50

750

... More
(Erection Part Ts.No. 183/2023-24)

-

-

-

... More
Erection of S/T pole 9 mtr long, a) Digging Of Pit, b) Drilling Of Holes In Pole X-Arm, c) Erection Of Pole, d) Erec. Of X-Arm e) Shackle Insulator & D-Iron f) Filling Of Pit And Ramming g) Fixing of Nuts & Bolts h) Polishing of Pole with Aluminium Paint complete in all respect.

11

3100

34100

... More
Erection for Laying of Conductor (ACSR 6/1/3.35mm²), Stringing and Sagging including binding with insulator complete in all respect.

1.83

13840

25327.2

... More
Erection of Laying and Sagging of GI Wire Guarding complete in all respect.

0.75

4000

3000

... More
Erection of L.T Stay sets a)Digging of Pit b)Ramming of Pit c) Nozzeling & Tightening d) fixing of Egg insulator complete in all respect.

11

1480

16280

... More
fixing of RCC Muffs for Steel tubler Pole. 1800mm with concerete filling.

11

700

7700

... More
Erection of Earthing Sets a)Digging of Pit b)Fixing of GI wire to the Earth system c) filling of Pit insulator complete in all respect.

6

1228

7368

... More
Manual Carriage of ST Poles 9 mtr Long Pole & Allied material for an average Lead of 1Km @ Rs. 600/Poles /Km

11

600

6600



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.