Himachal Pradesh State Electricity Board Limited Tender
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.
Himachal Pradesh State Electricity Board Limited - HPSEBL Tender
Eprocure
Opening Date13 Dec 2023
Closing Date18 Dec 2023
Tender Amount₹ 9,52,927
Costs
EMD
₹ 9,529Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_HPSEB_82601_1Bid Award Id
ViewTender No
AED/67/2023-24Tender Authority
Himachal Pradesh State Electricity Board Limited ViewPurchaser Address
-Website
http://hptenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
3
4008
1336
Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect.
0.3
4037
13457
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.(Duble wire)
0.1
282
2822
Erection of 11 kV AB Cable
0.1
6832
68320
Fixing jumper complete in all respect.
3
429
143
SUPPLY PART
-
-
-
HT Line
-
-
-
Prov. Steel tubler Poles 11 mtr. Long ( Unit :- Each , Oty:- 3) Provided By HPSEBL)
-
-
-
Prov. RCC muff with concerete filling .( Unit :- Each , Oty:- 3) Provided By HPSEBL)
-
-
-
Prov. AAAC 7/4.26 mm Conductor ( Unit :- Km , Oty:- 0.464) Provided By HPSEBL)
-
-
-
G.I Wire 6 SWG ( Unit :- Kg , Oty:- 16) Provided By HPSEBL)
-
-
-
Prov.C.I.X-arm (Horizontal ) M.S.CI 100X50X6 mm Length 2600)mm for tapping Str.
2
3790
1895
Prov.X-arm (Horizontal ) M.S.CI 100X50X6 mm Length 1500)mm ( Unit :- No. , Oty:- 3) Provided By HPSEBL)
-
-
-
Prov. A.I.Knee-bracing set ( x 50 x 50 x 6 mm. ) length 2x750 mm) ( Unit :- No. , Oty:- 1) Provided By HPSEBL)
-
-
-
Prov. MSCI-X-Arm 50x50x6 length 2800 mm for earth /Gaurding for road crossing . ( Unit :- No. , Oty:- 2) Provided By HPSEBL)
-
-
-
Prov. A.I.Knee-bracing set completet in all respect i/c nut bolts for holding he 11 kV G.O. Switch
1
256
256
Prov. M.S. Full clamp
8
2184
273
Prov. M.S. Half Clamp
8
1264
158
Prov. M.S. Nuts & Bolts off size = 35 kg / Km line.
15
1770
118
Prov. H.T. stay set complete in all respect .
3
3210
1070
Stay Wire (7/3.15 mm) (10 kg Per Stay Set)
30
2340
78
Prov. Barbed wire.
3
234
78
Prov. M.S. Eye hook for earth wire .
5
250
50
Prov. 11kv G.O.Switch complete in all respect. ( Unit :- Set. , Oty:- 1) Provided By HPSEBL)
-
-
-
D.O Fuse Unit
1
2173
2173
Prov. 11 kv 45kN Polymer Disc Insulator complete set with ball clevis / eye -socket,dead end clamp & P.G.clamps etc. (New + Puncher)
12
17400
1450
Prov. 11 kv Pin Insulator (Porcelain, 12kv,10kn) 3 nos. per pole Str.
9
1386
154
Prov. H.T Coil earthing complete set.
1
1133
1133
Prov. 11 KV Danger plate( 250x200x1.6mm) ( Unit :-Each. , Qty:- 3) Provided By HPSEBL)
-
-
-
Prov. Alluminum Paint.
3
1035
345
Suspension assembly
3
819
273
Anchoring assembly
3
1035
345
Façade Hooks
3
285
95
Cable Termination kit ( Unit :-No. , Qty:- 2) Provided By HPSEBL)
-
-
-
ABC 11kVCable 3 x 95+70+35 mm² ( Unit :-mtr. , Qty:- 100) Provided By HPSEBL)
-
-
-
ERECTION PART (Sub-Station).1 Nos
-
-
-
Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, AI i.e X-arml, Knee bracing set, errection of D-pole,errection of plate form, errcetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Errection of T/F, and earthing conn. to T/F G.O Switch lightning etc. errection of Stay Set, Errection of Jumper, Pipe earthing 3 Nos., Errection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect , complete in all respect. (400 KVA S/Stn. Structure) with Chain Link Fencing., Angle Iron, Gate etc. for T/F Fencing.
1
39363
39363
C/O Bed Foundation complete in all respect.Transformer Bed ( Civil Work (as per HPSR)
1
28500
28500
Sub-Station Supply Material
-
-
-
Prov. 11/0.4 kV, 400 KVA Transformer
1
713300
713300
Prov. Steel tubler Poles 11 mtr. Long ( Unit :- Each , Oty:- 2) Provided By HPSEBL)
-
-
-
Prov. RCC muff with concerete filling . ( Unit :- Each , Oty:- 2) Provided By HPSEBL)
-
-
-
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line ( Unit :- No. , Oty:- 3) Provided By HPSEBL)
-
-
-
MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA's
1
1024
1024
X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
4
6232
1558
Transformer Bed, Belting & Knee Bracing
-
-
-
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed. ( Unit :- No. , Oty:- 2) Provided By HPSEBL)
-
-
-
X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer]
2
672
336
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
2
2048
1024
MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos
2
230
115
MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing
2
694
347
Transformer LT Dist. Box and GO Switch fixing Assembly
-
-
-
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
2
2048
1024
MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
1
165
165
GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm
1
256
256
GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type ( Unit :- Set , Oty:- 1) Provided By HPSEBL)
-
-
-
D.O Fuse Unit
1
2173
2173
Surge Arrester, 9 kV Station Class (Porcelain Type)
3
3492
1164
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
3
4392
1464
Stay set complete
4
4280
1070
Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
28
2184
78
Pipe Earthing Set
3
10170
3390
LT Distribution Panel Box with MCCB MS Sheet of 1.6 mm (
1100x800x275 mm ) cubide Box complete with stand etc and Al Busbar 40x6 mm inside .painted/powder coated after primar coating ( Unit :- Each , Oty:- 1) Provided By HPSEBL)
-
-
-
Half Clamp (M.S. Flat 50X6 mm)
17
2686
158
Full Clamps (M.S. Flat 50X6 mm)
9
2457
273
Nuts and Bolts of Various Sizes (Galvanised / Coated)
27
3186
118
Aluminium Thimble ( Unit :- Each , Oty:- 16) Provided By HPSEBL)
-
-
-
Aluminium Thimble ( Unit :- Each , Oty:- 4) Provided By HPSEBL)
-
-
-
Danger Plate ( Unit :- No. , Oty:- 1) Provided By HPSEBL)
-
-
-
Barbed Wire
15
1170
78
Prov. L.T.cable 3-1/2 core 400/185 mm^2 PVC Insulated , Al., Un-Armoured for incoming. for 400 kva DTR.
15
15105
1007
Energy Meter (3-Phase, 4-Wire) DLMS compliant 400/5 A CT Type for 400KVA Transformer
1
13820
13820
Prov. CT/PT Unit 50/5 ( Unit :- Each , Oty:- 1) Provided By HPSEBL)
-
-
-
Alluminium Paint
2
690
345
Chain Link fencing , Angle Iron ,Gate etc for transformer fencing
1
15000
15000
Mannual Carriage/Transportation at destination site
1
12000
12000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements