Himachal Pradesh State Electricity Board Limited Tender

Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Services
Civil And Construction
Electrical and Electronics
Electrical Works
Eprocure
Opening Date7 Oct 2024
Closing Date15 Oct 2024
Tender Amount₹ 9,08,064 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing Muff 2 Mtr long with concrete filling .

2

3196

-

... More
Providing x-Arms (Channel Iron(100x50x6mm) Length 2800mmx2Nos.

2

4518

-

... More
Providing MS Angle Iron (50x50x6mm) Length 2800mmX1Nos for LA's

1

1046

-

... More
Prov- X-Arms (Channel Iron (75x40x6mm) Length 2800mmX4Nos for supporting DO fuse unit &GO switch

4

6752

-

... More
Transformer Belting & Knee bracing.

-

-

-

... More
Prov. X-Arms Channal Arms (100X50X6mm) length 2800mmX2Nos.) for transformer Bed.

2

4518

-

... More
Prov. X-Arms Channal Arms (100X50X6mm) length 460mmX2Nos.) for supporting for main channel of Transformer.

2

742

-

... More
i)MS Angle Iron (50x50x6mm) Length:2800mmx2Nos

2

2092

-

... More
ii)MS Angle Iron (35x35x5mm) length 460mmx2Nos

2

234

-

... More
iii)MS Angle Iron (50x50x6mm) Length:950mmx2Nos for bed knee bracing

2

710

-

... More
Transformer LT distribution Box and GO switch fixing Assembly

-

-

-

... More
MS Angle Iron (50x50x6mm) Length:2800mmx2Nos

2

2092

-

... More
MS Angle Iron (50x50x6mm) length 450mmx1Nos

1

166

-

... More
GO switch handle supporting (channel (75x40x5mm) length 460mm

1

259

-

... More
Go switch unit (22Kv,400A,25KV) Tripple pole O/Dtype(Provided By HPSEBL)

1

-

-

... More
Providing DO Fuse Unit

1

4214

-

... More
Providing Surge Arrester 9KV Station Class (Porcelain Type)

3

3531

-

... More
Providing Disc Insuator Sets (comparising 1 No. Disc (Procelain BS 12KV ,90KN) including dead and clamp.

3

6423

-

... More
Providing Stay set complete

4

4708

-

... More
Providing Stay Wire 7/3.15 mm (@6.0 Kg. Per Stay Set )

24

2304

-

... More
Prov. Pipe Earthing Set.

3

4584

-

... More
Prov. 6SWG GI wire for earthing

30

2880

-

... More
Providing LT Distribution Pannel Box With MCCB 100Amp. For 63KVA DTR

1

15475

-

... More
Providing Half Clamp(MS Flat 50x6mm)

17

2890

-

... More
Providing Full Clamp(MS Flat 50x6mm)

9

3060

-

... More
Providing Nut and Bolts of various sizes(galvanised /coated preferably 16mm or more with flat and spring washers)

25

3250

-

... More
Providing Aluminum Thimble

16

240

-

... More
Providing Copper Thimble 200Amp.

4

1888

-

... More
Danger Plate.

1

132

-

... More
Providing Barbed wire

15

1200

-

... More
Providing LT cable 3.5 Core 35MM²

15

1635

-

... More
Engry Meter (3-Ø,4-Wire) DLMS compliant CT operated static Trivactor meter with Box(CT-100/5A).

1

17243

-

... More
Providing Aluminum paint

2

732

-

... More
SUPPLY OF MATERIAL FOR 22 KV HT LINE

-

-

-

... More
ACSR/6/1/3.35(50mm2) includes 3 conductor length for 3 phase and additional 1% jumpering

1.21

69720

-

... More
Steel Tubular pole 10mtr. Mtr.(Provided by HPSEBL)

6

-

-

... More
Providing Muff 2 Mtr long with concrete filling .

6

9588

-

... More
X-Arms (MS Channel Iron(2800x100x50x6)mm (Provided by HPSEBL)

6

-

-

... More
Providing X-Arms (MS Channel Iron(1800x100x50x6)mm

6

9546

-

... More
provding X-bracing Set (2700+1500) 50X50X6

3

4719

-

... More
MS Angle Knee bracing

1

355

-

... More
Providing Disc insulator sets on dead end str.(comprising 2No Disc porcelain,BS 12kv,90kn, with Dead and clamp.

15

32115

-

... More
Providing 22KV Pin insulator (Porcelain,36kv,10kn), 3No. Per double pole structure

12

5808

-

... More
Providing Stay Set complete in all respect.(i/c Stay Clamp)(1No. /Single Pole,4No./Double Pole Structures)

13

18161

-

... More
Providing Stay wire (7/4.00mm)(10.0kg per stay set)

130

12480

-

... More
Single continuous Earth wire(G.I 8SWG a/w 1 wire lengths for avg. one road crossing @ 20m and additional 1% sag and wastage @ 0.102 kg/m.(Provided by HPSEBL)

41

-

-

... More
Providing HT Earthing set complete.

3

3921

-

... More
Support Clamp.

7

2100

-

... More
Providing Danger Plate.(250x200x1.6mm)

4

528

-

... More
Providing Nut and Bolts of various sizes(galvanised/coated preferably 16mm or more with flat and spring washers)

12

1560

-

... More
Providing Barbed wire

15

1170

-

... More
Providing Aluminium Paint

6

2196

-

... More
Providing 22kv G.O Switch

1

12964

-

... More
SUPPLY OF MATERIAL FOR 3Ø LT LINE

-

-

-

... More
ACSR/6/1/2.59mm includes 3 conductor length for 3 phase and additional 1% jumpering

1.55

49118

-

... More
Steel Tubular pole 9 Mtr.(Provided by HPSEBL)

7

-

-

... More
Providing Muff 2 Mtr long with concrete filling .

7

11186

-

... More
Prov.Shackle insulator (16 kn)

30

780

-

... More
Prov. D-iron(U-Clamps) with Nuts andd bolts

30

2580

-

... More
Eye Hook Bolt

9

477

-

... More
LT Stay set(Provided by HPSEBL)

9

-

-

... More
Stay wire 7/3.15mm (6.0kg per stay set) (Provided by HPSEBL)

54

-

-

... More
Prov. Egg insulator

9

198

-

... More
Single continuous Earth wire(G.I 8SWG a/w 1 wire lengths for avg. one road crossing @ 20m and additional 1% sag and wastage @ 0.102 kg/m.(provided by HPSEBL)

50

-

-

... More
Providing Nut and Bolts of various sizes(galvanised/coated preferably 16mm or more with flat and spring washers)

10

1300

-

... More
Providing Aluminium Paint

7

2562

-

... More
Erection of Sub-Station

-

-

-

... More
Manual carriage of 1 no 63 Kva trasformer and allied material from road head to site of work Av. Lead 0.100Kms

0.1

2286

-

... More
Erection of 22/0.4 KV Distribution Sub-Station

-

-

-

... More
Digging of pit for 2Nos. pole

1

2243

-

... More
Drilling of hole in pole & X-Arms

1

1832

-

... More
Preparation of Plate form Str. Members CI, AI i.e. X-Arm & Knee Bracing Set

1

8071

-

... More
Erection of Double pole

1

8488

-

... More
Erection of Plateform

1

5882

-

... More
Erection of X-Arms, Drop-out

1

13928

-

... More
Erection of 2 Nos. Stay Set HT

1

4551

-

... More
Erection of Jumper

1

2931

-

... More
Earthing for 3Nos. Earths

-

-

-

... More
Digging of Pit

1

5097

-

... More
Fixing of earth rod, clamp,earth wire and connecting to the structure

1

5271

-

... More
Providing Charcoal and Salt for the eathing

1

1770

-

... More
filling of the pit with material .

1

1911

-

... More
Providing Earthing Conn. To G.O Swich,Transformer Lightning Arrestor etc. & Poles

1

3374

-

... More
Providing earthing to the transformer ,LT Box,Meter Box etc.

1

1687

-

... More
Barbed Wiire & Paining

1

5328

-

... More
Erection of 63KVA S/Stn, LT Box ,MCCB Switch , cable ,service Cable and Energy Meter

1

14627

-

... More
Prov. chain link fencing Angle Iron gate etc. for Transformer fencing (as per HPRS)

1

72573

-

... More
Errection of 22KV HT line

-

-

-

... More
Manual carriage of HT line material (S/T pole 6Nos. ACSR Cond. GI wire, Cross Barcing Set, Stay Set etc.)from road head to site of work Av. Lead 0.500 Kms

0.5

16599

-

... More
ERECTION OF STEEL TUBULAR POLE ( single pole 10 Mtr long)

-

-

-

... More
Erection of single steel tubular poles 10 mtr.long Single str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles complete in all respect .

2

11835

-

... More
ERECTION OF STEEL TUBULAR POLE ( Double pole 10Mtr. long)

-

-

-

... More
Erection of Double steel tubular poles 10mtr.long Single str. Digging of pit , erection of pole , filling of pit ramming , drilling of holes in poles & X-Arms, fixing of insulator , X-Arm, Knee bracing set , top clamp, fixing of danger plate, painting of poles complete in all respect .

2

24763

-

... More
Sagging of conductor 1Km. Single wire ACSR Cond. 30mm2

-

-

-

... More
Laying of Conductor,Stringing & Sagging, Binding with insultor

1.21

19679

-

... More
Sagging of Single Continuous Earth wire (8 SWG)

-

-

-

... More
Laying of Conductor,Stringing & Sagging, Binding with insultor and gaurding etc.

0.39

1923

-

... More
HT Earthing Set

-

-

-

... More
Digging of pit,fixing of GI wire to the earth system and filling of pit

3

5196

-

... More
ERRECTION OF STAY SET HT

-

-

-

... More
Digging of pit, Fixing of stay rod, Filling of pit, Nozzeling & tightening.

13

29590

-

... More
ERECTION OF 3Ø LT LINE

-

-

-

... More
Manual carriage of 3Ø LT LINE material

-

-

-

... More
Manual carriage of LT line material ( i.e S/T pole 7Nos. Shackle insulator D-Iron Stay Set etc.) from road head to site of work Av. Lead 0.500Kms

0.5

10336

-

... More
ERECTION OF STEEL TUBULAR POLE ( Single pole 9 Mtr long)

-

-

-

... More
Digging of pit, drilling of holes in poles & x-arms, erection of pole, Erection of X-Arm,Shackle Insulator, filling of pit ramming.

7

23640

-

... More
Sagging of ACSR Conductor 6/1/2.59mm2.

-

-

-

... More
Laying of Conductor,Stringing & Sagging, Binding with insultor

1.55

13388

-

... More
Sagging of Single Continuous Earth wire (8 SWG).

-

-

-

... More
Laying of Conductor,Stringing & Sagging, Binding with insultor and gaurding etc.

0.48

2342

-

... More
ERRECTION OF STAY SET LT

-

-

-

... More
Digging of pit, Fixing of stay rod, Filling of pit, Nozzeling & tightening.

9

17501

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.