Himachal Pradesh State Electricity Board Limited Tender

... More
Bidassist allows us to explore new opportunities across the whole world so as to support the growth of the business. It is designed in such a manner that if we need any kind of information about any government e-tender the Himachal Pradesh government has posted on its website, Bidassist provides the same in a very hassle-free manner. As BidAssist is designed as a very user-friendly website which helps us find the specific Himachal Pradesh etender we are looking for.

Himachal Pradesh State Electricity Board Limited - HPSEBL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date15 Mar 2022
Closing Date28 Mar 2022
Tender Amount₹ 20,83,175 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ERRECTION OF STAY SET

-

-

-

... More
(i) Digging of pit (ii)fixing of stay rod (iii) Filling of pit (iv)Nozzeling & Tighting.

25

-

-

... More
ERRECTION OF EARTHING

-

-

-

... More
(i) Digging of pit (ii) fixing of G.I wire to the earth system, filling of pit.

5

-

-

... More
SAGGING OF ACSR CONDUCTOR 30/7/2.59mm (Single wire).

-

-

-

... More
De-Stringing of ACSR Wolf Conductor, jointing and re-stringing & sagging, binding with insulator as per entire satisfaction of Engineer-in-Charge.

2.85

-

-

... More
MANNUAL CARRIAGE OF H.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 4.000K.M.

-

-

-

... More
(i) Steel tubular pole 13 mtr. long.

12

-

-

... More
(ii) Other line material.

1000

-

-

... More
MECHANICAL CARRIAGE OF H.T LINE MATERIAL FROM STORE TO NEAREST POINT OF SITE

-

-

-

... More
Carriage of pole and line material as required

2

-

-

... More
Welding charges of pole at site (12 pole x 355 kg = 4260 k,g)

4615

-

-

... More
PROTECTION WORK

-

-

-

... More
Excavation in foundation, trench etc. In earth work, lift up to 1.5 meters. work, in all kinds of soil, Stacking and excavation soil more not than 3 meters clear from the edges of the excavation and then returning the stacked soil in 15 CM. Layers, when required in to plinths sides of foundations etc. consolidating each deposited of all surplus excavated earth at approval dumping site within all leads and lifts as directed by the Engineer-in-Charge. in all kinds of soil

41.88

-

-

... More
Providing and laying cement concrete 1:6:12 (1 cement : 6 sand : 12 Graded stone aggregate 40 mm nominal size) and curing complete excluding cost of form work in foundation and plinth including all leads and lifts of material. Foundation and plinth

13.95

-

-

... More
Providing and laying cement concrete 1:5:10 (1cement :5sand :10 graded stone aggregate 40mm nominal size) with 15 % plum and curing complete excluding cost of form work in retaining walls/ Breast walls, the size of plums shall usually be 150mm. to 300mm. as per H.P.P.W.D. Specification

65

-

-

... More
Providing form work with steel plates 3.15mm.thick welded with angle iron in frame 30x30x5mm. so as to give a fair finish including centering, shuttering, strutting and propping etc. with wooden battening and soiling height of propping and centering below supporting floor to ceiling not exceeding 4 mtrs. and removal of the same for in situ-reinforced concrete and plain concrete work including all leads and lifts of materials in (Sub analysis of rates for manufacturing steel plates) Foundation, footings base of columns etc and mass concrete.

168

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.